Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Associated British Ports Ltd
Ocean Gate
Southampton
SO16 6FS
UK
Person cyswllt: Amanda Durnan
E-bost: amanda.durnan@abports.co.uk
NUTS: UKJ32
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.abports.co.uk
Cyfeiriad proffil y prynwr: http://www.abports.co.uk
I.6) Prif weithgaredd
Gweithgareddau sy’n gysylltiedig â phorthladdoedd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
SCT Deepening and Strengthening of Ports
II.1.2) Prif god CPV
45252124
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
ABP Southampton are seeking a supplier to carry out deepening and widening of existing berth pockets by dredging and potentially install scour protection and quay wall strengthening measures within Southampton Container Terminal.
The objective of the works is to provide approximately 1 000 continuous linear metres of quay able to receive the largest current container ship.
The works are divided into lots as follows:
Lot required activities
Lot 1: Dredging
Lot 2: Dredging and installation of scour protection
Lot 3: Dredging, installation of scour protection and strengthening of existing quay walls. To include detailed design of the strengthening works in accordance with a reference design provided by ABP.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Ydy
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
Rhif y Lot 1
II.2.1) Teitl
Dredging
II.2.2) Cod(au) CPV ychwanegol
45252124
II.2.3) Man cyflawni
Cod NUTS:
UKJ32
II.2.4) Disgrifiad o’r caffaeliad
Lot 1: Dredging
Lot 2: Dredging and installation of scour protection
Lot 3: Dredging, installation of scour protection and strengthening of existing quay walls. To include detailed design of the strengthening works in accordance with a reference design provided by ABP.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Rhif y Lot 2
II.2.1) Teitl
Dredging and Installation of Scour Protection
II.2.2) Cod(au) CPV ychwanegol
45252124
II.2.3) Man cyflawni
Cod NUTS:
UKJ3
II.2.4) Disgrifiad o’r caffaeliad
Dredging and installation of scour protection.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Rhif y Lot 3
II.2.1) Teitl
Dredging, Installation of Scour Protection and strengthening of Existing Quay Walls. To include Detailed Design of the Strengthening Works in accordance with a Reference Design Provided by ABP
II.2.2) Cod(au) CPV ychwanegol
45252124
II.2.3) Man cyflawni
Cod NUTS:
UKJ3
II.2.4) Disgrifiad o’r caffaeliad
Dredging, installation of scour protection and strengthening of existing quay walls. To include detailed design of the strengthening works in accordance with a reference design provided by ABP.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2020/S 071-170103
Section V: Dyfarnu contract
Rhif y Lot: 1
Rhif Contract: 1
Teitl: Dredging
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Section V: Dyfarnu contract
Rhif y Lot: 2
Rhif Contract: 2
Teitl: Dredging and Installation of Scour Protection
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Section V: Dyfarnu contract
Rhif y Lot: 3
Rhif Contract: 3
Teitl: Dredging, Installation of Scour Protection and Strengthening of Existing Quay Walls. To include Detailed Design of the Strengthening Works in accordance with a Reference Design Provided by ABP.
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
Requirement has changed due to design issues.
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Associated British Ports
2nd Floor 25 Bedford Street
London
WC2E 9ES
UK
Ffôn: +44 2074301177
Cyfeiriad(au) rhyngrwyd
URL: www.abports.co.uk
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
Associated British Ports
2nd Floor 25 Bedford Street
London
wc2e 9es
UK
Ffôn: +44 2074301177
Cyfeiriad(au) rhyngrwyd
URL: www.abports.co.uk
VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu
Associated British Ports
2nd Floor 25 Bedford Street
London
WC2E 9ES
UK
Ffôn: +44 2074301177
Cyfeiriad(au) rhyngrwyd
URL: www.abports.co.uk
VI.5) Dyddiad anfon yr hysbysiad hwn
05/08/2020