Hysbysiad addasu
Modification of a contract/concession during its term
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Department For Business, Energy and Industrial Strategy
1 Victoria Street
London
SW1V 0ET
UK
Person cyswllt: Roger Littlewood
Ffôn: +44 300683609
E-bost: roger.littlewood@beis.gov.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.gov.uk/government/organisations/department-for-business-energy-and-industrial-strategy
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Building for 2050 (Bf2050)1
II.1.2) Prif god CPV
73000000
II.1.3) Y math o gontract
Gwasanaethau
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UK
Prif safle neu fan cyflawni:
UNITED KINGDOM.
II.2.4) Disgrifiad o’r caffaeliad
Bf2050 is a study of the construction of low-cost, low-carbon buildings. It aims to understand the attitudes towards and challenges of this type of home, the costs and cost drivers associated with their construction, and their energy performance once occupied. It does this through a combination of physical monitoring and social research at 4 case study housing developments.
Its outputs will include evidence to support low-carbon building construction policy, and an understanding of the ‘art of the possible’ to inform future emissions reductions plans.
II.2.7) Hyd y contract, y cytundeb fframwaith, y system brynu ddynamig neu’r consesiwn
Diwedd:
31/03/2021
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section V: Dyfarnu contract/consesiwn
Rhif Contract: (Bf2050)1
Teitl: Building for 2050
V.2 Dyfarnu contract/consesiwn
V.2.1) Y dyddiad y daeth y contract i ben/consesiwn
14/08/2019
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr/consesiynydd
AECOM Ltd
united
Aldgate Tower, 2 Leman Street
London
E1 8FA
UK
Ffôn: +44 2070617000
NUTS: UK
BBaCh yw’r contractwr/consesiynydd:
Na
V.2.4) Gwybodaeth am werth y contract/lot /consesiwn (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot/consesiwn: 257 640.00 GBP
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=422580458
Go reference: GO-2019911-PRO-15354410
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Department for Business Energy and Industrial Strategy
1 Victoria Street
London
SW1V 0ET
UK
Ffôn: +44 2072155000
VI.5) Dyddiad anfon yr hysbysiad hwn
11/09/2019
Section VII: Addasiadau i’w contract/consesiwn
VII.1) Disgrifiad o’r caffaeliad ar ôl yr addasiadau
VII.1.1) Prif god CPV
73000000
VII.1.2) Cod(au) CPV ychwanegol
VII.1.3) Man cyflawni
Cod NUTS:
UK
Prif safle neu fan cyflawni:
UNITED KINGDOM
VII.1.4) Disgrifiad o’r caffaeliad
Case study recruitment: recruitment of replacement case studies after 2 of the 3 proposed in the original ITT pulled out.
Contract duration: the above delays to case study recruitment meant an additional year is now needed to complete the project. New completion date 31.3.2021.
Stage 1 activities: costs to cover additional Stage 1 (identifying timelines) activities on various (potential) case studies:
(i) 1 of the original case studies, where stage 1 was in development before t
VII.1.5) Hyd y contract, y cytundeb fframwaith, y system brynu ddynamig neu’r consesiwn
Dechrau:
16/08/2019
Diwedd:
31/03/2021
VII.1.6) Gwybodaeth am werth y contract/lot/consesiwn (heb gynnwys TAW)
Cyfanswm gwerth y caffaeliad: GBP
Dyfarnwyd y contract/consesiwn i gr?p o weithredwyr economaidd:
Na
VII.1.7) Enw a chyfeiriad y contractwr/consesiynydd
AECOM Ltd
Aldgate Tower, 2 Leman Street
London
E1 8FA
UK
Ffôn: +44 2072155000
NUTS: UK
BBaCh yw’r contractwr/consesiynydd:
Na
VII.2) Gwybodaeth am addasiadau
VII.2.1) Disgrifiad o’r addasiadau
The project’s aims and outputs remain the same as the original specification, but it has panned out differently to the way we envisaged. To enable us to meet our original aims and deliver further value, we are making some modifications to the contract through this variation. Although this variation increases the project’s value and pushes back its end date, the nature of the project, its aims, and objectives remain unchanged.
VII.2.2) Rhesymau dros addasu
Angen addasiad yn sgil amgylchiadau na allai awdurdod/endid contractio diwyd eu rhagweld
Disgrifiad o’r amgylchiadau a olygai fod angen yr addasiad ac esboniad o natur annisgwyl yr amgylchiadau hyn:
The project’s aims and outputs remain the same as the original specification, but it has panned out differently to the way we envisaged. To enable us to meet our original aims and deliver further value, we are making some modifications to the contract through this variation. Although this variation increases the project’s value and pushes back its end date, the nature of the project, its aims, and objectives remain unchanged.
VII.2.3) Cynnydd mewn pris
Cyfanswm gwerth y contract wedi’i ddiweddaru cyn yr addasiadau (gan ystyried addasiadau cynharach posibl i’r contract ac i brisiau ac, yn achos Cyfarwyddeb 2014/23/EU, chwyddiant cyfartalog yn yr Aelod-wladwriaeth dan sylw)
Gwerth heb gynnwys TAW: 257 640.00 Arian cyfred: GBP
Cyfanswm gwerth y contract ar ôl yr addasiadau
Gwerth heb gynnwys TAW: 1 643 644.00 Arian cyfred: GBP