Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
HS2 Ltd
High Speed Two (HS2) Ltd, Two Snowhill, Snow Hill Queensway
Birmingham
B4 6GA
UK
E-bost: Marcel.Cerri@hs2.org.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.hs2.org.uk
I.6) Prif weithgaredd
Gwasanaethau rheilffyrdd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Railway System Safety Support Services
Cyfeirnod: HS2_1510
II.1.2) Prif god CPV
63711000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
The System safety, security and interoperability (SSI) team embedded within operations and infrastructure management directorate (OIMD) is responsible for the route wide system safety demonstration and safety, interoperability and security approvals of HS2 Ltd to its external stakeholders; the Office of rail and road (ORR) and Department for transport (DfT). The SSI team is tasked with providing assurance that the HS2 infrastructure (including design and rolling stock) is built with safety in mind across phase 1, phase 2a and phase 2b.
This provision will ensure that HS2 Ltd receives continuous support in the delivery of its system safety responsibilities which include, but are not limited to, providing HS2 Ltd with a route wide overview and technical expertise on safety in relation to railway infrastructure, safety risk assessments and guidance on system safety protocols.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 5 544 000.00 GBP
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
The System safety, security and interoperability (SSI) team embedded within operations and infrastructure management directorate (OIMD) is responsible for the route wide system safety demonstration and safety, interoperability and security approvals of HS2 Ltd to its external stakeholders; the Office of rail and road (ORR) and Department for transport (DfT). The SSI team is tasked with providing assurance that the HS2 infrastructure (Including design and Rolling Stock) is built with safety in mind across phase 1, phase 2a and phase 2b.
This provision will support HS2 Ltd in the delivery of its system safety responsibilities which include, but are not limited to, providing HS2 Ltd with a route wide overview and technical expertise on safety in relation to railway infrastructure, safety risk assessments and guidance on system safety protocols.
The contract duration is for a period of 96 months.
Throughout the contract duration, HS2 Ltd will call-off from this agreement via task orders as requirements are identified to fulfil the deliverables across multiple safety work streams.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
25/03/2019
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 14
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Kimberley Systems Engineering Ltd
Needham and Hall Accountants 6 Bedford Road, Barton-Le-Clay
Bedfordshire
MK45 4JU
UK
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot: 5 544 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
V.2.6) Y pris a dalwyd am bryniannau bargen
Gwerth heb gynnwys TAW: 5 544 000.00 GBP
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court of England and Wales
Strand
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
12/09/2019