Manylion y contract
-
ID:
- 163136
-
OCID:
- ocds-kuma6s-159817
-
Math o gontract:
- Gwaith
-
Math o weithdrefn:
- Agored
-
Hysbysiad dyfarnu contract cyf:
-
MAR601306
-
Cyf mewnol:
- EPN270.RW.26
-
Cysylltwch â'r Catergory:
- C - contract lleol ar ran un prynwr sy'n contractio yn unig.
-
Prynwr:
- Conwy County Borough Council
-
Cod CPV cynradd:
- N/a
-
Cod (au) CPV ychwanegol:
-
A yw'n fframwaith:
- Nac Ydi
-
Cynllun lleihau carbon:
-
Dewisiadau:
-
Disgrifiad:
- Re-roofing of Ysgol Bro Aled (Flat Roof) was to include:
Main Roof:
1) Strip all existing roofing materials down to deck level;
2) Examine deck for signs of wear or damage and repair / remediate as necessary as per Sika Specification;
3) Installation of wallplates / sole / headplates as necessary;
4) Installation of steel beam (as shown on drawing 05825L-CCE-XX-XX-DR-A-001 and Cadarn Structural Calculations sheet);
5) Installation of posi-joists;
6) Installation of new 18mm OSB deck;
7) Installation of SIKA capping system (Vapour layer, insulation, underlay, cap-sheet etc. as per Sika Specification);
8) Raising / replacement and sealing of existing protrusions etc. with new upstands to accommodate new roof height;
9) Removal of existing cold roof vents and sealing the roof buildup along all perimeters;
10) Removal of the existing mineral wool from voids;
11) Installation of new UPVC fascias and guttering to accommodate new roof height.
Infill Roof:
1) Prepare existing roof by de-chipping, cleaning etc.;
2) Examine existing felt surfaces for signs of wear, previous repairs or damage and repair / remediate as necessary as per Sika Specification;
3) Installation of SIKA capping system (Vapour layer, insulation, underlay, cap-sheet etc. as per Sika Specification);
4) Raising / replacement and sealing of existing protrusions etc. with new upstands to accommodate new roof height;
5) Removal of existing rooflights and replacement with new;
6) Installation of new UPVC fascias and guttering to accommodate new roof height.
Windows:
1) Hall windows to be removed, framed and boarded over inside and out with 50mm Sikatherm insulation within the voids;
2) Exterior to be made good by preparing and painting with suitable exterior paint (white) to manufacturers instructions;
Interior to be made good by preparing and painting with suitable interior emulsion (to match existing interior wall colour (to be confirmed with school representative)) to manufacturers instructions.
3) Interior to be made good by preparing and painting with suitable interior emulsion (to match existing interior wall colour (to be confirmed with school representative)) to manufacturers instructions.
Contractors to consult Specification and Contract Docs and supporting information.
-
Tîm Prynu:
- N/a
Dyddiadau'r contract
-
Dyddiad a ddyfarnwyd:
- 13 Mawrth 2026
-
Dyddiad cychwyn:
- 20 Gorffennaf 2026
-
Dyddiad gorffen:
- 20 Tachwedd 2026
Estyniadau contract
-
Opsiynau estyniad Max ar gael:
- 0 (misoedd)
Gwybodaeth ychwanegol
-
Gwybodaeth ychwanegol:
Manylion cyswllt
-
Enw'r contract:
- Thomas Ashton
-
E-bost contract:
- thomas.ashton@conwy.gov.uk
Cyflenwyr llwyddiannus
Isod mae rhestr o'r holl gyflenwyr llwyddiannus ar gyfer y contract hwn. Gellir dewis cyflenwyr hefyd ar gyfer LOTIAU penodol (os yw'n berthnasol) a gallant hefyd gael un neu fwy o isgontractwyr y gellir eu hychwanegu trwy'r tab Is gonontractwyr."
Lotiau
Isod mae manylion y symiau y mae'r contract wedi'u rhannu. I weld y cyflenwyr sydd wedi derbyn pob un o'r lots, ewch i'r adran Cyflenwyr.
Nid oes llawer wedi ei ychwanegu ar gyfer y contract hwn.
Cyflenwyr
Isod mae manylion y cyflenwyr llwyddiannus ar gyfer y contract hwn.
|
Rhif Lot
|
Enw
|
Tref
|
Côd post
|
DUNS rhif
|
Gwerth
|
|
Owens Building & Roofing Limited T/A Obr Construction |
Llangefni |
LL77 7XA |
999999999 |
0 |
Prynwyr sy'n cydweithio
Isod mae'r prynwyr sy'n cydweithio ar y contract hwn.
Dim prynwyr sy'n cydweithredu i'w dangos.
Galwadau i ffwrdd
Contract yn galw i ffwrdd.
Nid yw'r contract hwn yn defnyddio galwadau i ffwrdd.
Negeseuon
Nid yw'r cytundeb hwn yn defnyddio negeseuon.