Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
High Speed Two (HS2) Ltd
06791686
High Speed Two (HS2) Ltd, Two Snowhill, Snowhill Queensway
Birmingham
B4 6GA
UK
Ffôn: +44 2079443000
E-bost: phaseonestations@hs2.org.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.gov.uk/government/organisations/high-speed-two-limited
I.6) Prif weithgaredd
Gwasanaethau rheilffyrdd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
HS2 Phase 1 Stations: Construction Partner Contract (Euston)
II.1.2) Prif god CPV
45213300
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
High Speed Two (HS2) Ltd (“HS2 Ltd”) is responsible for developing and promoting the new high speed railway known as HS2. HS2 will initially run between London and Birmingham (Phase 1) but will subsequently be extended to link Birmingham to Manchester and Leeds (Phase 2). This procurement for Phase 1 Stations Construction Partner Contracts is related to the London stations:
1) Euston; and
2) Old Oak Common.
The scope is divided into 2 lots, 1 for each station. This Contract Award Notice is for the Phase 1 Stations Construction Partner Contract for Lot 1 Euston only.
The construction partners will each be appointed to manage the programme of works for the successful delivery of the relevant station to budget and programme including procurement and management of works packages, design, construction and commissioning and associated works and services.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Ydy
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
Rhif y Lot 1
II.2.1) Teitl
Euston Station
II.2.2) Cod(au) CPV ychwanegol
45211360
45213310
45213320
45213321
45213322
45221000
45300000
71000000
71400000
71500000
72242000
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
Procurement for a management contractor (the construction partner) for the successful delivery of the new HS2 station to be located at London Euston to budget and programme. The construction partner will be appointed to manage the programme of works for the successful delivery of the new HS2 station at Euston to budget and programme including procurement and management of Works Packages, management and the provision of design, construction and commissioning and associated works and services.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Technical ITT questions
/ Pwysoliad: 57 %
Maes prawf ansawdd: Commercial ITT questions (qualitative)
/ Pwysoliad: 8 %
Maes prawf ansawdd: Behavioural assessment
/ Pwysoliad: 15 %
Maen prawf cost: Staff rates
/ Pwysoliad: 10 %
Maen prawf cost: Lump sum fee
/ Pwysoliad: 10 %
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
1) Optional Scope:
(i) HS2 Ltd reserves the right to instruct optional scope to include permanent enabling works where it is expedient and economic to do so, to accommodate future over-site development;
(ii) HS2 Ltd reserves the right to include the optional scope (in whole or in part) as part of the lot either during the procurement process prior to contract award or post award as an anticipated post contract modification;
(iii) if instructed by HS2 Ltd at its sole and absolute discretion, such optional scope would be undertaken by the construction partner in accordance with the contract and the rates and prices and % fee submitted by the successful tenderer will be applied to inform and calculate the price payable for undertaking such optional scope.
2) Euston Scope for Stages A and B1:
(i) the scope of this lot includes both Stages A and B1. However, since Stage B1 works are not programmed until 2026-2033, Stage B1 scope is included in the contract as a separate phase to be progressed by the construction partner, conditional on HS2 Ltd issuing a notice to proceed to Stage B1.
3) Design Services:
HS2 Ltd required the successful tenderer to enter into a novation agreement to novate the relevant Phase 1 Stations Design Services Contract (“SDSC”) to the construction partner (see related OJEU Contract Notice reference 2017/S 072-137921). The SDSC has been structured by HS2 Ltd to allow the consultant to undertake design services up to RIBA Stage 7. From the date of novation, the consultant will be required to perform a Lead Design Assurance Guardian role. However, the extent to which the consultant will be used to provide additional services to progress and further develop the design will be a matter for the construction partner to decide.
4) Step-in and resumption, replacement or novation:
The contract will require the construction partner, in its subcontracting arrangements, to procure from its subcontractors collateral warranties in favour of HS2 Ltd (as well as others). These collateral warranties will include step in arrangements which entitle HS2 Ltd to step in and assume the role of employer under subcontracts. HS2 Ltd may step-in on a temporary basis before stepping out either to allow the construction partner to resume its role or, in the event of termination of the construction partner's obligation to provide the works, to allow a replacement strategy to be implemented by HS2 Ltd. HS2 Ltd will also reserve the right to novate the subcontracts to itself (which will also be provided for in the collateral warranties) rather than appointing a replacement construction partner.
5) Secondees:
The contract will provide that a construction partner's employees may be seconded to HS2 Ltd to assist HS2 Ltd in managing the HS2 project (which could include managing Works during any step-in period).
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2017/S 161-332984
Section V: Dyfarnu contract
Rhif y Lot: 1
Rhif Contract: CPC2163
Teitl: HS2 Phase 1 Stations: Construction Partner Contract (Euston)
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
11/03/2019
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Ydy
V.2.3) Enw a chyfeiriad y contractwr
Mace Ltd
2410626
155 Moorgate
London
EC2M 6XB
UK
NUTS: UK
BBaCh yw’r contractwr:
Na
V.2.3) Enw a chyfeiriad y contractwr
Dragados S.A.
A15139314
No 50 Avd, Camino De Santiago
Madrid
28050
ES
NUTS: ES
BBaCh yw’r contractwr:
Na
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
The estimated value is based on Q2 2017 prices. The actual value of the contract(s) may be different and may be higher or lower than the estimated value since the actual value will depend on a number of factors including:
(i) the rates, prices and Lump Sum Fee tendered by the successful Construction Partner;
(ii) whether HS2 Ltd exercises its right to introduce the optional scope and, if so, to what extent the Optional Scope is undertaken;
(iii) the value of the works packages awarded by the construction partner to its subcontractor(s) as calculated under the NEC3 ECC Option F contract as amended by HS2 Ltd.
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court of England and Wales
Strand
London
WC2A 2LL
UK
Ffôn: +44 2079476000
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
High Speed Two (HS2) Ltd incorporated a minimum ten (10) calendar days standstill period in accordance with Regulation 102 of the Utilities Contracts Regulations 2016 prior to concluding the award of the contract.
VI.5) Dyddiad anfon yr hysbysiad hwn
04/04/2019