Hysbysiad contract - cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
EP UK Investments Ltd
09255154
3175 Century Way, Thorpe Park
Leeds
LS15 8ZB
UK
Person cyswllt: Jacqueline Roose
Ffôn: +44 7710781708
E-bost: gas-pipeline2020.SQ-NI@epuki.co.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.epuki.co.uk
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
www.epuki.co.uk/NetC.EPUKI/media/EPUKi/Gas-Pipeline-2020-SQ-and-MB-Final.pdf
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
I.6) Prif weithgaredd
Trydan
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
High Pressure Gas Pipeline with Associated Above Ground Installations and Pressure Reducing Station in Northern Ireland
II.1.2) Prif god CPV
45231220
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
EP UK Investments Ltd (EPUKI) on behalf of EPKL is planning a new high-pressure natural gas pipeline from the existing Belfast Transmission Pipeline to Kilroot Power Station in Northern Ireland. The objective of the Proposed Development is to provide a gas supply to the existing diesel fuelled Open Cycle Gas Turbines (OCGT) peaking plant at the Kilroot Power Station to enable the units to switch from diesel to gas fuel, and additionally to support potential future development of new natural gas fired generation. Subject to planning it is proposed to have the power station operating on gas by the end of 2022.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 6 000 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
39340000
39341000
44161110
45231200
45231220
45231221
65200000
65210000
45333100
44161100
II.2.3) Man cyflawni
Cod NUTS:
UKN13
II.2.4) Disgrifiad o’r caffaeliad
The supplier will be required to provide full turnkey Engineering Design, Procurement and Construction) (EPC) Contract for the delivery of an Above Ground Installation (AGI) at Marshallstown, approximated 2.7 km of high-pressure gas pipeline, a second AGI at Kilroot and adjoining PRS (Pressure Reducing Station) at Kilroot. The scope of services shall include the project management, design, procurement, manufacture, shop testing, inspection, delivery and unloading, construction, installation, welding, health and safety management, painting/coating, inspection, testing and commissioning of the new gas pipeline, the Marshallstown AGI, the Kilroot AGI and the Kilroot PRS.
The project will need to meet the requirements of United Kingdom, Northern Ireland, European and international regulations, orders, directives, BREF and standards, and comply with local permits, licences and codes. The Marshallstown AGI and high-pressure pipeline, greater than 12 ” diameter and > 50 bar pressure, will be constructed on a green field site and the Kilroot AGI and PRS will be constructed on brown field site at Kilroot Power Station.
The majority of the pipeline will be installed underground using an ‘open cut’ method, where a trench is excavated, and pipe laid within it. Once the pipeline is installed, the trench will be back-filled and the land reinstated as far as possible to its original condition. Crossings of roads, including the A2, and any other obstacles will be by underground tunnelling or drilling to avoid disruption of traffic or road closures.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 6 000 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Dechrau:
01/11/2020
Diwedd:
30/11/2022
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Yr isafswm nifer a ragwelir: 3
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol
III.1) Amodau ar gyfer cymryd rhan
III.1.2) Statws economaidd ac ariannol
Meini prawf dethol fel y’u nodir yn y dogfennau caffael
III.1.3) Gallu technegol a phroffesiynol
Meini prawf dethol fel y’u nodir yn y dogfennau caffael
III.1.6) Adneuon a gwarantau sy’n ofynnol:
Whilst the date of notification is unknown, it is anticipated that the expected award date will be between 1 November 2020 and 31 December 2021. Guaranteed contract delivery would be required within approximately 18 months of contract award.
III.1.7) Prif amodau cyllido a threfniadau talu a/neu gyfeiriad at y darpariaethau perthnasol sy’n eu llywodraethu:
EP UK Investments Ltd reserve the right to require such assurances as considered necessary and/or the provision of a guarantee, performance bond, direct agreement or collateral warranty from the third-party entities the economic operator wishes to rely on.
III.2) Amodau sy’n gysylltiedig â’r contract
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.4) Gwybodaeth am leihau nifer yr atebion neu’r tendrwyr yn ystod negodiad neu ddeialog
Troi at weithdrefn fesul cam er mwyn mynd ati’n raddol i leihau nifer yr atebion i’w trafod neu’r tendrau i’w negodi
IV.1.6) Gwybodaeth am arwerthiant electronig
Defnyddir arwerthiant electronig
Gwybodaeth ychwanegol am arwerthiant electronig:
EPUKI reserve the right to undertake an eAuction for the supply/award of this requirement; if this step is to be added to the ITN process, EPUKI will provide adequate notification of it's intention to do so.
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
08/06/2020
Amser lleol: 12:00
IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd
Dyddiad:
26/06/2020
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr
Hyd mewn misoedd: 12 (o’r dyddiad a nodwyd i dendr ddod i law)
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.2) Gwybodaeth am lifau gwaith electronig
Derbynnir anfonebau electronig
Defnyddir taliadau electronig
VI.3) Gwybodaeth ychwanegol
This tender process is being conducted in accordance with the negotiated procedure with prior call for competition under Regulation 47 of the Utilities Contracts Regulations 2016.
Further detail in relation to the requirement and the tender process can be found in the market brochure document made available to all potential bidders at the same time as the selection questionnaire.
During the tender stage, EPUKI reserves the right to undertake negotiations with the remaining bidders or to proceed directly to contract award.
The costs of participating in this tender process shall be borne by each bidder and EPUKI shall have no liability whatsoever to bidders or their advisers for their costs incurred in connection with this procurement.
The advertisement of this opportunity in no way commits EPUKI to award the contract and EPUKI reserves the right to lawfully terminate this tender process in whole or part, for any or all lot(s) at any time.
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court of Justice in Northern Ireland
Royal Courts of Justice, Chichester Street
Belfast
BT1 3JY
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
There will be a minimum 10 clear calendar day-standstill period at the point information on the award of the contract is communicated to all economic operators. The standstill period provides time for unsuccessful bidders to challenge the award decision before the contract was entered into. The Utilities Contracts Regulations 2016 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (Northern Ireland).