Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
University of Nottingham
Kings Meadow Campus, Lenton Lane
Nottingham
NG7 2NR
UK
Person cyswllt: Charles Ellis
E-bost: BB-Procurement@exmail.nottingham.ac.uk
NUTS: UKF14
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.nottingham.ac.uk
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Addysg
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Hugh Stewart Hall of Residence Refurbishment and Extension
Cyfeirnod: 1637/ITT/CE
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
The University of Nottingham is proposing to complete construction and refurbishment works to Hugh Stewart Hall which is situated on the University campus. The potential scope of works is summarised as follows:- Refurbishment of the existing accommodation comprising circa 323 student bedrooms and common spaces and social spaces (Phase 1 = 105 bedrooms, Phase 2 = 218 bedrooms)- Works to the existing Hall building fabric including window and door replacement- Replacement of mechanical and electrical services installationsThe project team are appointed and the early design stages are being progressed. Key dates are as follows:November 2021 - SQ Request PeriodJanuary/February 2022 - Commercial pricing documents issuedJuly 2022 - Contract awardSeptember 2022 - Start-on-siteAugust 2023 - Completion of Phase 1 (1930’s Block and Amenities Block Extension) and start of Phase 2July 2024 - Completion of Phase 2 (1960’s Blocks student bedrooms)
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45210000
45300000
45240000
II.2.3) Man cyflawni
Cod NUTS:
UKF14
Prif safle neu fan cyflawni:
The University's University Park Campus
II.2.4) Disgrifiad o’r caffaeliad
Form of contract will be the JCT D&B 2016The University may also include the upgrade of conference rooms and for conference attendee bedrooms in the Grade II listed Hugh Stewart House as part of the contract works. Further details are available in the ITT bundle. A Prior Information Notice was released for this project with reference: 2021/S 000-026566 on 22/10/2021.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Quality
/ Pwysoliad: 45
Maen prawf cost: Price
/ Pwysoliad: 55
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2021/S 000-027980
Section V: Dyfarnu contract
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Ni ddyfernir y contract/lot
Rhesymau eraill (dirwyn y weithdrefn i ben)
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court
Strand
London
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
In accordance with Regulation 86 and 87 of the Public Contracts Regulations 2015, the contracting authority has incorporated a minimum 10 calendar days standstill period starting from the day when contract award wasnotified to the bidders. Unsuccessful bidders will be provided with a debrief in the award decision at the start of the standstill period including details of their bid in relation to the winning bid comprising the reasons for the decision, the characteristics and relative advantages of the successful tender, the score of the economic operator and the name of the economic operator to be awarded the contract. Tenderers have a right to appeal provided for within the Public Contracts Regulations 2015. Any such proceedings must be brought in the High Court of England and Wales.
VI.5) Dyddiad anfon yr hysbysiad hwn
08/04/2022