Hysbysiad gwybodaeth ymlaen llaw
Cais am gystadleuaeth yw’r hysbysiad hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
MHRA
10 South Colonnade, Canary Wharf
London
E14 4PU
UK
Person cyswllt: Jonathon Liam Moloney
E-bost: jonathon.moloney@mhra.gov.uk
NUTS: UKI31
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.gov.uk/government/organisations/medicines-and-healthcare-products-regulatory-agency
Cyfeiriad proffil y prynwr: https://www.gov.uk/government/organisations/medicines-and-healthcare-products-regulatory-agency
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://health-family.force.com/s/Welcome
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://health-family.force.com/s/Welcome
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
Mae cyfathrebu electronig yn gofyn am ddefnyddio offer a dyfeisiau nad ydynt ar gael yn gyffredinol. Mae mynediad uniongyrchol anghyfgyfyngiedig a llawn i'r offer a dyfeisiau hyn yn bosibl, yn rhad ac am ddim, yn:
https://health-family.force.com/s/Welcome
I.4) Y math o awdurdod contractio
Gweinyddiaeth neu unrhyw awdurdod cenedlaethol neu ffederal arall, gan gynnwys eu his-adrannau rhanbarthol neu leol
I.5) Prif weithgaredd
Iechyd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Freeze Dryer Phase II
Cyfeirnod: C235782
II.1.2) Prif god CPV
72100000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.<br/>To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.<br/>To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.<br/>To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 600 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
42961200
II.2.3) Man cyflawni
Cod NUTS:
UKH23
Prif safle neu fan cyflawni:
NIBSC<br/>Blanche Lane<br/>Potters Bar<br/>Hertfordshire<br/>EN6 3QG
II.2.4) Disgrifiad o’r caffaeliad
To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.<br/>To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.<br/>To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.<br/>To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.<br/>1. Project Definition<br/>– All parties to agree scope and ensure that everything is available for project commencement. <br/>– MHRA to provide any existing software backups (PLC / SCADA source code).<br/>– For software that is not available (such as the HMI), the supplier is expected to work with the MHRA to develop the requirements for the HMI.<br/>– Both parties to agree deliverable format (e.g. schematic updates).<br/>2. Part Selection<br/>– Using the information gathered at the project definition stage, the supplier will select updated hardware and software packages for the PLCs, HMIs, SCADAs, data historian and anti-virus software.<br/>3. Electrical Design<br/>– With appropriate parts selected, the supplier will need to assess how the electrical design will be impacted by the proposed changes.<br/>– These impacts should be minimised wherever possible.<br/>– However, if changes are required, the supplier will need to modify any schematics while aligning with appropriate standards.<br/>4. Software Development<br/>– Software development for the PLC, HMI, SCADA and Data Historian can be started following on from part selection.<br/>– This will require the supplier to migrate functionality where possible.<br/>– Where the code cannot be migrated, the functionality will need to be replicated.<br/>– The HMI should be re-built to meet the requirements based on existing SCADA screens and workshops held with MHRA operators.<br/>5. FAT (Factory Acceptance Testing)<br/>– The control cabinets and associated hardware shall not be moved from the MHRA facility.<br/>– FAT is expected to test as much of the new software and hardware as possible without replicating site hardware.<br/>6. Plant Upgrades<br/>– This will include the MHRA ensuring that appropriate ethernet connection shall be made available and new virtual machines are available.<br/>7. SAT (Site Acceptance Testing)<br/>– SAT will need to be staggered to reduce any concurrent downtime to the freeze dryers. This will require testing and commissioning only one freeze dryer at a time.<br/>– SAT is expected to test all software and hardware associated with the replacement hardware and the existing site hardware.<br/>8. On-going contract Support<br/>– Support is expected for the warranty of the system following from SAT and moving onto general support for the years following the warranty end.<br/>– During these periods, the supplier is expected to ensure that recommend patches will not cause un-planned downtime.<br/>– It is desired that the supplier can also provide support for the Phase 1 system (CS100).
II.2.5) Meini prawf dyfarnu
Maen prawf isod:
Maes prawf ansawdd: Quality
/ Pwysoliad: 55
Maes prawf ansawdd: Social Value
/ Pwysoliad: 10
Maen prawf cost: Pricing
/ Pwysoliad: 35
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 500 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 36
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
Agency will have one twelve month extension option
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol
III.1) Amodau ar gyfer cymryd rhan
III.1.2) Statws economaidd ac ariannol
Rhestr a disgrifiad byr o’r meini prawf dethol:
As in Supplier Response
Lefel(au) gofynnol y safonau sydd eu hangen:
As in Supplier Response
III.1.3) Gallu technegol a phroffesiynol
Rhestr a disgrifiad byr o’r meini prawf dethol:
As in Supplier Response
Lefel(au) gofynnol y safonau sydd eu hangen:
As in Supplier Response
III.2) Amodau sy’n gysylltiedig â’r contract
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gystadleuol gyda negodi
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i ddatganiadau o ddiddordeb ddod i law
Dyddiad:
15/04/2024
Amser lleol: 12:00
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.5) Dyddiad a drefnwyd ar gyfer dechrau gweithdrefnau dyfarnu
24/06/2024
Section VI: Gwybodaeth ategol
VI.2) Gwybodaeth am lifau gwaith electronig
Derbynnir anfonebau electronig
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Royal Courts of Justice
Strand
London
WC2A 2LL
UK
E-bost: royalcourtsofjustice.jc@gov.uk
Cyfeiriad(au) rhyngrwyd
URL: https://www.gov.uk/
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
Centre for Effective Dispute Resolution
70 Fleet Street
London
EC4Y 1EU
UK
Cyfeiriad(au) rhyngrwyd
URL: https://www.cedr.com/
VI.5) Dyddiad anfon yr hysbysiad hwn
08/04/2024