Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
NORTH EAST LINCOLNSHIRE COUNCIL
Municipal Offices,Town Hall Square
GRIMSBY
DN311HU
UK
E-bost: procurement@nelincs.gov.uk
NUTS: UKE13
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://yortender.eu-supply.com/login.asp?B=YORTENDER
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://yortender.eu-supply.com/login.asp?B=YORTENDER
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding
Cyfeirnod: 86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding
II.1.2) Prif god CPV
79415000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding
To access the pre-market consultation document please visit the below link and search for "86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding":
https://uk.eu-supply.com/login.asp?B=YORTENDER
--
The objective of this PMC is to share with the market the Authority's ideas for Wayfinding in the resort of Cleethorpes, starting with the three projects listed in the back ground, and then potentially wider. We are looking to gather feedback on our ideas and to seek the potential for possible opportunities and innovation in the market (please refer to the questionnaire at the back of this document).
Currently the Authority is considering undertaking two procurement exercises to deliver the Wayfinding project objectives:
Procurement One
Contract with a consultant to deliver a Resort Wayfinding Strategy and Design. The intention is that this will include a strategy for the wider resort and a design that can be incorporated across future wayfinding and signage within the Cleethorpes Resort. A map of the area to be considered as part of the Strategy and Design is included in Appendix 1.
The Wayfinding Strategy will seek to improve the experiential quality of being in and navigating through the resort. The strategy will help people feel safe, comfortable, and confident in knowing where they are and being able to efficiently identify and then get to their chosen destination.
The consultant will produce a list of SMART recommendations (with supporting evidence) outlining the needs of the resort. The consultant will need to show an understanding of sense of place and how people move to determine where and what type of intervention is needed. A combination of digital and physical signage should be a consideration.
Using the information collected the consultant will create a report detailing all the above. As well as a clear signage strategy, creative wayfinding interventions that aid navigation (physical and digital) whilst improving peoples experience of the resort. This will be carried out in collaboration with NELC and their relevant project teams.
The consultant will:
• carry out an audit of existing town centre wayfinding signage through the production of a plan and supporting schedule.
• review existing signage to identify issues and opportunities to inform the emerging Wayfinding Strategy proposals.
• develop design proposals for new signage including signage elements, their distribution, and the information to be contained.
• develop graphic design proposals for the base mapping for use on the appropriate signage elements.
• carry out internal and external engagement inviting comments and feedback before finalising the Strategy; and
• work with NELC to identify suitable signage manufacturers and assist in the development of tender documentation.
--
Please visit the YOR Tender site for further information
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKE
II.2.4) Disgrifiad o’r caffaeliad
86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding
To access the pre-market consultation document please visit the below link and search for "86429 - Preliminary Market Consultation-Cleethorpes Levelling Up Funding-Wayfinding":
https://uk.eu-supply.com/login.asp?B=YORTENDER
--
The objective of this PMC is to share with the market the Authority's ideas for Wayfinding in the resort of Cleethorpes, starting with the three projects listed in the back ground, and then potentially wider. We are looking to gather feedback on our ideas and to seek the potential for possible opportunities and innovation in the market (please refer to the questionnaire at the back of this document).
Currently the Authority is considering undertaking two procurement exercises to deliver the Wayfinding project objectives:
Procurement One
Contract with a consultant to deliver a Resort Wayfinding Strategy and Design. The intention is that this will include a strategy for the wider resort and a design that can be incorporated across future wayfinding and signage within the Cleethorpes Resort. A map of the area to be considered as part of the Strategy and Design is included in Appendix 1.
The Wayfinding Strategy will seek to improve the experiential quality of being in and navigating through the resort. The strategy will help people feel safe, comfortable, and confident in knowing where they are and being able to efficiently identify and then get to their chosen destination.
The consultant will produce a list of SMART recommendations (with supporting evidence) outlining the needs of the resort. The consultant will need to show an understanding of sense of place and how people move to determine where and what type of intervention is needed. A combination of digital and physical signage should be a consideration.
Using the information collected the consultant will create a report detailing all the above. As well as a clear signage strategy, creative wayfinding interventions that aid navigation (physical and digital) whilst improving peoples experience of the resort. This will be carried out in collaboration with NELC and their relevant project teams.
The consultant will:
• carry out an audit of existing town centre wayfinding signage through the production of a plan and supporting schedule.
• review existing signage to identify issues and opportunities to inform the emerging Wayfinding Strategy proposals.
• develop design proposals for new signage including signage elements, their distribution, and the information to be contained.
• develop graphic design proposals for the base mapping for use on the appropriate signage elements.
• carry out internal and external engagement inviting comments and feedback before finalising the Strategy; and
• work with NELC to identify suitable signage manufacturers and assist in the development of tender documentation.
--
Please visit the YOR Tender site for further information
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
29/05/2024
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.5) Dyddiad anfon yr hysbysiad hwn
17/04/2024