Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
NORTHERN GAS NETWORKS LIMITED
05167070
1100 Cetury Way,Thorpe Park Business Centre, Colton
LEEDS
LS158TU
UK
Person cyswllt: Andrew Christophers
Ffôn: +44 7510367358
E-bost: achristophers@northerngas.co.uk
NUTS: UKE42
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.northerngasnetworks.co.uk
I.6) Prif weithgaredd
Cynhyrchu, cludo a dosbarthu nwy a gwres
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Next 7 Profiled Networks
II.1.2) Prif god CPV
31700000
II.1.3) Y math o gontract
Cyflenwadau
II.1.4) Disgrifiad byr
Pressure control is used across Northern Gas Networks Low Pressure systems to maintain a low annual average system pressure while ensuring supply pressures are high enough for reliable supplies over periods of higher demand.
In this Regulatory Period NGN have been targeted with maintaining our current ASP (Average System Pressure) against the opposing factors of Mains replacement and general growth. This means we need to grow our current pressure control fleet.
The requirement of this project is for a supplier to both supply and install Gas pressure controllers at up to 121 low pressure outlet district governors across 7 networks in the NGN footprint.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKC
UKD
UKE
II.2.4) Disgrifiad o’r caffaeliad
Pressure control is used across Northern Gas Networks Low Pressure systems to maintain a low annual average system pressure while ensuring supply pressures are high enough for reliable supplies over periods of higher demand.
In this Regulatory Period NGN have been targeted with maintaining our current ASP (Average System Pressure) against the opposing factors of Mains replacement and general growth. This means we need to grow our current pressure control fleet.
The requirement of this project is for a supplier to both supply and install Gas pressure controllers at up to 121 low pressure outlet district governors across 7 networks in the NGN footprint.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2021/S 000-000004
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
22/04/2024
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Northern Gas Networks
Leeds
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
22/04/2024