HYSBYSIAD O DDYFARNU CONTRACT YM MEYSYDD AMDDIFFYN A DIOGELWCH
|
Adran I: Awdurdod Contractio
|
I.1)
|
Enw, Cyfeiriad a Phwynt(iau) Cyswllt
|
|
Ministry of Defence |
MOD Abbey Wood |
Bristol |
BS34 8JH |
UK |
mugondi leyla |
|
leyla.mugondi100@mod.gov.uk |
|
|
|
Adran II: Amcan y Contract
|
II.1)
|
Disgrifiad
|
II.1.1)
|
Teitl a roddwyd i'r contract gan yr awdurdod contractio
Provision of Contractor Logistic Support and Post Design Services for Warrior Training Systems (WTS)
|
II.1.2(a))
|
Math o gontract gwaith
|
II.1.2(b))
|
Math o gontract cyflenwadau
|
II.1.2(c))
|
Math o gontract gwasanaeth
20
|
II.1.2)
|
Prif safle neu leoliad y gwaith, man cyflawni neu berfformio
CAE (UK) PLCInnovation DriveBurgess HillWest SussexRH15 9TW
|
II.1.3)
|
Mae'r hysbysiad hwn yn ymwneud â chytundeb fframwaith
 |
II.1.4)
|
Disgrifiad byr o'r contract neu'r pryniant/pryniannau
Provision of Contractor Logistic Support and Post Design Services for Warrior Training Systems (WTS)
|
II.1.5)
|
Geirfa Gaffael Gyffredin (CPV)
|
|
|
|
80660000 |
|
|
|
|
|
II.2)
|
Cyfanswm gwerth terfynol y contract(au)
|
II.2.1)
|
Cyfanswm gwerth terfynol y contract(au)
2094292
GBP
|
Adran IV: Gweithdrefn
|
IV.1)
|
Math o weithdrefn
|
IV.1.1)
|
Math o weithdrefn
|
IV.2)
|
Meini prawf dyfarnu
|
IV.2.1)
|
Meini prawf dyfarnu

|
IV.2.2)
|
Defnyddiwyd arwerthiant electronig
Na
|
IV0.3)
|
Gwybodaeth weinyddol
|
IV.3.1)
|
Rhif cyfeirnod ffeil a roddwyd gan yr awdurdod contractio
|
IV.3.2)
|
Cyhoeddiad(au) blaenorol sy'n ymwneud â'r un contract
Cyhoeddiadau blaenorol eraill
|
Adran V: Dyfarnu contract
|
|
|
715060452- WTS |
|
|
|
|
|
|
V.1)
|
Dyddiad dyfarnu'r contract:
31
- 3
- 2026 |
V.2)
|
Nifer y cynigion a dderbyniwyd:
1
Nifer y cynigion a dderbyniwyd yn electronig:
1 |
V.3)
|
Enw a chyfeiriad y gweithredwr economaidd y dyfarnwyd y contract iddo
CAE (UK) PLC |
Innovation Drive |
Burgess Hill |
RH15 9TW |
UK |
|
|
|
|
|
V.4)
|
Gwybodaeth am werth y contract
2094292
GBP
1 |
V.5)
|
Mae'r contract yn debygol o gael ei is-gontractio
Na

 |
|
|
Disgrifiad byr o werth/cyfran y contract sy'n debygol o gael ei is-gontractio
|
Adran VI: Gwybodaeth Ategol
|
VI.1)
|
A yw'r contract yn ymwneud â phrosiect a/neu raglen a ariennir gan gronfeydd cymunedol?
Na
|
VI.2)
|
Gwybodaeth Ychwanegol
Link to transparency contract documents: https://contracts.mod.uk/esop/guest/go/opportunity/detail?opportunityId=61022
|
VI.3)
|
Gweithdrefnau ar gyfer apelio
|
VI.3.1)
|
Corff sy'n gyfrifol am weithdrefnau apelio
|
|
|
|
|
|
|
|
|
|
|
|
Corff sy'n gyfrifol am weithdrefnau cyfryngu
|
|
|
|
|
|
|
|
|
|
VI.3.2)
|
Cyflwyno apeliadau
|
VI.3.3)
|
Gwasanaeth y gellir cael gwybodaeth ynglŷn â chyflwyno apeliadau oddi wrtho
|
|
|
|
|
|
|
|
|
|
VI.4)
|
Dyddiad yr anfonwyd yr Hysbysiad hwn
27
- 4
- 2026 |
ATODIAD D3
Cyfiawnhad dros ddewis y weithdrefn wedi'i negodi heb gyhoeddi hysbysiad o gontract ymlaen llaw yn yr OJEU yn unol ag erthygl 28 o Gyfarwyddeb 2009/81/EC
|
|
|
|
|


 |
|
|
|
 |
|
|
|
 |
|
|
|
 |
|
|
|

 |
|
|
|
 |
|
|
|
 |
|
|
|
 |
|
|
|
 |
|
|
|


|
|
|
|
 |
|
|
|
 |
|

 |
|
|
The Warrior Training Systems (WTS) have been in service with the British Army since 1992, originally comprising of the just the desk top systems, with the Turret Trainer added to the system in approximately 2007. The systems enable the Army User to train at Individual and Crew level in synthetic scenarios, prior to exposure to the “live” environment on the Warrior Infantry Fighting Vehicle, predominantly used by Armoured Infantry units, but now increasingly being used by Armoured Cavalry Reconnaissance units, placing a greater training burden on the WTS. WTS has been supported under a Contractor Logistics Support (CLS) contract by Canadian Aviation Electronics (CAE) since 2007. These systems are supported in the UK at numerous MOD sites.
In accordance with regulation 4 of The Defence and Security Public Contracts (Amendment) (EU Exit) Regulations 2019 (SI 2019/697) this Contract falls to be regulated under the provisions of the Defence and Security Public Contracts Regulations 2011 as amended (in particular by SI 2019/697 and SI 2020/1450). Prior publication of a contract notice in the Official Journal of the European Union is no longer appropriate. It is considered that the award of this Contract without prior publication of a contract notice in the UK e-notification service is lawful in accordance with regulation 16(1)(a)(ii) of the Defence and Security Public Contracts Regulations 2011 for technical reasons.
Due to the duration of the service of WTS there is a challenge to maintain aging equipment. Furthermore, the estimated out of service date (OSD) for WTS is between 2027 and 2030, meaning obsolescence management is a priority for the contract. With CAE being the Design Authority (DA) and the originator of the production manuals and technical drawings for WTS, this means that CAE Plc is the only economic operator with the required technical expertise required to perform the Contract.
|
|