Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Dyfarnu Contract

Architectural and Interpretative Design and Build.

  • Cyhoeddwyd gyntaf: 30 Awst 2013
  • Wedi'i addasu ddiwethaf: 30 Awst 2013

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
Cyhoeddwyd gan:
National Army Museum
ID Awudurdod:
AA22260
Dyddiad cyhoeddi:
30 Awst 2013
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The National Army Museum (NAM) is in the process of redeveloping its facilities at Chelsea, London, to create a facility fit for the future. The scheme involves the creation of a major new central court, in the heart of the existing building, around which the permanent galleries will be arranged over a number of floors. Additionally, the project will include the creation of a new visitor reception including external landscaping, commercial areas, archive facilities and an educational suite. The project also includes the interpretative design and fit out of the permanent gallery spaces created.

The NAM is currently seeking to appoint a Design and Build Team to progress the project from concept design through to completion. The Lead Architect/Designer will be required to appoint all professional elements to complete the work and co-ordinate all contractors and sub contractors work. The Team will work closely with the Project Manager (appointed separately) to ensure value for money. In their presentation to the NAM Project Board, the Team will be required to show innovation in design and it will be essential that the successful tenderer shows that all materials planned to be used in the project come from sustainable sources and the carbon footprint for the production and delivery of any such materials is reduced to a minimum. Additionally, the successful team will have to show innovation in the design of galleries and the display of collections, paying particular regard to conservation standards and accessibility for the public. The Team will be required to ensure that all statutory, local authority and any other such regulations are complied with and any notices required to be submitted to statutory bodies are submitted in adequate time so as not to cause unneccessary delays.

In the first instance the Design and Build Team will be appointed to assist in the delivery of the project to RIBA Stage D by 31 October 2013 when the plans will be presented to Heritage Lottery Fund for approval to Round Two. Should the NAM be successful in this application, the project will then be delivered in its entirety – RIBA E to completion – over the period March 2014 to July 2016. It is the intention of the NAM to continue to employ the same project team through to completion.

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CYFNODOLYN SWYDDOGOL

Adran I: Awdurdod Contractio

I.1)

Enw, Cyfeiriad a Phwynt(iau) Cyswllt


National Army Museum

Royal Hospital Road

Chelsea

SW3 4HT

UK

M.O Connor

+44 2077300717

info@nam.ac.uk

+44 2078236573

www.nam.ac.uk


I.2)

Math o Awdurdod contractio a'i Brif Weithgaredd neu Weithgareddau

Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch heb ei dicio
Blwch wedi'i dicio

National Museum

Na

Adran II: Amcan y Contract

II.1)

Disgrifiad

II.1.1)

Teitl a roddwyd i'r contract gan yr awdurdod contractio

Architectural and Interpretative Design and Build.

II.1.2(a))

Math o gontract gwaith

Blwch heb ei dicio Blwch heb ei dicio
Blwch wedi'i dicio

II.1.2(b))

Math o gontract cyflenwadau

II.1.2(c))

Math o gontract gwasanaeth

II.1.2)

Prif safle neu leoliad y gwaith, man cyflawni neu berfformio


II.1.3)

Mae'r hysbysiad hwn yn ymwneud â chytundeb fframwaith

Blwch heb ei dicio
Blwch heb ei dicio

II.1.4)

Disgrifiad byr o'r contract neu'r pryniant/pryniannau

The National Army Museum (NAM) is in the process of redeveloping its facilities at Chelsea, London, to create a facility fit for the future. The scheme involves the creation of a major new central court, in the heart of the existing building, around which the permanent galleries will be arranged over a number of floors. Additionally, the project will include the creation of a new visitor reception including external landscaping, commercial areas, archive facilities and an educational suite. The project also includes the interpretative design and fit out of the permanent gallery spaces created.

The NAM is currently seeking to appoint a Design and Build Team to progress the project from concept design through to completion. The Lead Architect/Designer will be required to appoint all professional elements to complete the work and co-ordinate all contractors and sub contractors work. The Team will work closely with the Project Manager (appointed separately) to ensure value for money. In their presentation to the NAM Project Board, the Team will be required to show innovation in design and it will be essential that the successful tenderer shows that all materials planned to be used in the project come from sustainable sources and the carbon footprint for the production and delivery of any such materials is reduced to a minimum. Additionally, the successful team will have to show innovation in the design of galleries and the display of collections, paying particular regard to conservation standards and accessibility for the public. The Team will be required to ensure that all statutory, local authority and any other such regulations are complied with and any notices required to be submitted to statutory bodies are submitted in adequate time so as not to cause unneccessary delays.

In the first instance the Design and Build Team will be appointed to assist in the delivery of the project to RIBA Stage D by 31 October 2013 when the plans will be presented to Heritage Lottery Fund for approval to Round Two. Should the NAM be successful in this application, the project will then be delivered in its entirety – RIBA E to completion – over the period March 2014 to July 2016. It is the intention of the NAM to continue to employ the same project team through to completion.

II.1.5)

Geirfa Gaffael Gyffredin (CPV)

45200000
71242000
71245000

II.1.6)

Contract wedi'i gwmpasu gan gytundeb caffael y llywodraeth (GPA)

Na

II.2)

Cyfanswm gwerth terfynol y contract(au)

II.2.1)

Cyfanswm gwerth terfynol y contract(au)

  1 750 000     GBP      

Adran IV: Gweithdrefn

IV.1)

Math o weithdrefn

IV.1.1)

Math o weithdrefn

IV.2)

Meini prawf dyfarnu

IV.2.1)

Meini prawf dyfarnu

Blwch heb ei dicio
Blwch heb ei dicio

IV.2.2)

Defnyddiwyd arwerthiant electronig

Na

IV0.3)

Gwybodaeth weinyddol

IV.3.1)

Rhif cyfeirnod ffeil a roddwyd gan yr awdurdod contractio

PO1016953

IV.3.2)

Cyhoeddiad(au) blaenorol sy'n ymwneud â'r un contract

Cyhoeddiadau blaenorol eraill

Adran V: Dyfarnu contract

PO1016953

V.1)

Dyddiad dyfarnu'r contract:

  11 - 01 - 2013

V.2)

Nifer y cynigion a dderbyniwyd:

5

V.3)

Enw a chyfeiriad y gweithredwr economaidd y dyfarnwyd y contract iddo


BDP Ltd

16 Brewhouse Yard Clerkenwell

London

SW1V 4LJ

UK


+44 2078128000

www.bdp.com

+44 2078128399

V.4)

Gwybodaeth am werth y contract

  1 750 000   GBP  

V.5)

Mae'r contract yn debygol o gael ei is-gontractio

Na

Disgrifiad byr o werth/cyfran y contract sy'n debygol o gael ei is-gontractio

Adran VI: Gwybodaeth Ategol

VI.1)

A yw'r contract yn ymwneud â phrosiect a/neu raglen a ariennir gan gronfeydd cymunedol?

Na



VI.2)

Gwybodaeth Ychwanegol

VI.3)

Gweithdrefnau ar gyfer apelio

VI.3.1)

Corff sy'n gyfrifol am y gweithdrefnau apelio










Corff sy'n gyfrifol am y gweithdrefnau cyfryngu










VI.3.2)

Cyflwyno apeliadau

VI.3.3)

Gwasanaeth y gellir cael gwybodaeth ynglŷn â chyflwyno apeliadau oddi wrtho










VI.4)

Dyddiad yr anfonwyd yr Hysbysiad hwn

  28 - 08 - 2013

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71245000 Cynlluniau cymeradwyo, lluniadau gwaith a manylebau Gwasanaethau pensaernïol, peirianneg a chynllunio
45200000 Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil Gwaith adeiladu
71242000 Gwaith paratoi ac amcangyfrif costau prosiectau a dyluniadau Gwasanaethau pensaernïol, peirianneg a chynllunio

Lleoliadau Dosbarthu

ID Disgrifiad
Nid oes unrhyw leoliadau dosbarthu ar gyfer yr hysbysiad hwn.

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
info@nam.ac.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.