Hysbysiad Gwybodaeth Ymlaen Llaw (PIN)

Modifications to Henderson Dry Dock at the Port of Immingham

  • Cyhoeddwyd gyntaf: 02 Awst 2023
  • Wedi'i addasu ddiwethaf: 02 Awst 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-03ec1f
Cyhoeddwyd gan:
Associated British Ports
ID Awudurdod:
AA20591
Dyddiad cyhoeddi:
02 Awst 2023
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad Gwybodaeth Ymlaen Llaw (PIN)
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

Testun llawn y rhybydd

Hysbysiad gwybodaeth ymlaen llaw

Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Associated British Ports

25 Bedford Street

London

WC2E 9ES

UK

Person cyswllt: Group Procurement

E-bost: procurement@abports.co.uk

NUTS: UKE13

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://in-tendhost.co.uk/abp/aspx/Tenders/Current

Cyfeiriad proffil y prynwr: https://in-tendhost.co.uk/abp/aspx/Tenders/Current

I.3) Cyfathrebu

Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


I.4) Y math o awdurdod contractio

Arall: Utility

I.5) Prif weithgaredd

Arall: Port Operator

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Modifications to Henderson Dry Dock at the Port of Immingham

II.1.2) Prif god CPV

45240000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Ydy

II.2) Disgrifiad

Rhif y Lot 1

II.2.1) Teitl

Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the Depth

II.2.2) Cod(au) CPV ychwanegol

45240000

45244000

45241100

45241400

45213342

II.2.3) Man cyflawni

Cod NUTS:

UKE13


Prif safle neu fan cyflawni:

Port of Immingham

II.2.4) Disgrifiad o’r caffaeliad

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

Rhif y Lot 2

II.2.1) Teitl

Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the Depth

II.2.2) Cod(au) CPV ychwanegol

45240000

45244000

45241100

45241400

45213342

II.2.3) Man cyflawni

Cod NUTS:

UKE13

II.2.4) Disgrifiad o’r caffaeliad

The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture

II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:

05/09/2023

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

Section VI: Gwybodaeth ategol

VI.5) Dyddiad anfon yr hysbysiad hwn

01/08/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45240000 Gwaith adeiladu ar gyfer prosiectau dwr Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil
45241100 Gwaith adeiladu ceiau Gwaith adeiladu harbyrau
45241400 Gwaith adeiladu dociau Gwaith adeiladu harbyrau
45244000 Gwaith adeiladu morol Gwaith adeiladu ar gyfer prosiectau dwr
45213342 Gwaith adeiladu terfynfeydd ro-ro Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
procurement@abports.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.