Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
City of London Corporation
Guildhall
London
EC2P 2EJ
UK
Person cyswllt: Onika Syeda
Ffôn: +44 2076063030
E-bost: Onika.Syeda@cityoflondon.gov.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.cityoflondon.gov.uk/about-us/about-the-city-of-london-corporation
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Mae cyfathrebu electronig yn gofyn am ddefnyddio offer a dyfeisiau nad ydynt ar gael yn gyffredinol. Mae mynediad uniongyrchol anghyfgyfyngiedig a llawn i'r offer a dyfeisiau hyn yn bosibl, yn rhad ac am ddim, yn:
www.capitalesourcing.com
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Soft Market Testing for Heat Network Zone Developer
II.1.2) Prif god CPV
76000000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
Soft Market testing Prior to considering whether to commence a formal open tender process, the City Corporation wishes to establish the level of market interest in a zonal scale heat network development within the Square Mile and potential partnerships to deliver wider energy system decarbonisation measures to address the priority areas identified in the CoL LAEP. This activity does not, however, commit the CoLC to running a competitive tender process in the future. The decision to run this process will be made when further information is available on the heat network zoning regulations and the forthcoming legal regime. Assuming the entire Square Mile becomes a heat network zone, the City Corporation wish to explore through this Soft Market testing the market interest in participating in a future competitive process which may allow for future zoning rights to be awarded for developing heat networks within this future zone.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
24000000
65000000
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
The LAEP outlines the need for holistic thinking when considering the future energy needs of the square mile. As such, the City Corporation must consider potential partnerships and delivery models with organisations able to deliver low-carbon energy systems in the Square Mile
The City Corporation have been participating in the Department for Energy Security and Net Zero’s (DESNZ) Advanced Zoning Programme (AZP), recently completing stage 1. The outputs of the initial stage of the AZP have indicated that whole of the Square Mile is likely to be designated as a Heat Network Zone when regulations are implemented. It is estimated that this would require a total investment of over £1.2bn to decarbonise more than 1,000 GWh/year of heat delivered to over 1,200 buildings. It is envisaged that the first phase of this will require a circa £120m investment.
It should be noted that, as the heat network zoning framework, including zoning regulations and designations, is still uncertain at this stage, the CoLC cannot guarantee that the Square Mile will be a Heat Network Zone, and ultimately future decisions by the Zoning Coordinator may differ from current thinking.
There is currently an operational heat network in the Square Mile – The Citigen Heat and Chill Network. This network is owned and operated by E.ON, and connects to a number of CoLC and private buildings in an area in the North West of the Square Mile. The CoLC have a cooperation agreement to support this network by leasing space for energy centres and acting as an anchor load.
Soft Market testing
Prior to considering whether to commence a formal open tender process, the City Corporation wishes to establish the level of market interest in a zonal scale heat network development within the Square Mile and potential partnerships to deliver wider energy system decarbonisation measures to address the priority areas identified in the CoL LAEP.
This activity does not, however, commit the CoLC to running a competitive tender process in the future. The decision to run this process will be made when further information is available on the heat network zoning regulations and the forthcoming legal regime.
Assuming the entire Square Mile becomes a heat network zone, the City Corporation wish to explore through this Soft Market testing the market interest in participating in a future competitive process which may allow for future zoning rights to be awarded for developing heat networks within this future zone.
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
01/01/2025
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.5) Dyddiad anfon yr hysbysiad hwn
02/08/2024