Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

UK2

Digarbon Contractor

  • Cyhoeddwyd gyntaf: 14 Awst 2025
  • Wedi'i addasu ddiwethaf: 14 Awst 2025
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-0587bb
Cyhoeddwyd gan:
Cardiff University
ID Awudurdod:
AA0258
Dyddiad cyhoeddi:
14 Awst 2025
Dyddiad Cau:
05 Medi 2025
Math o hysbysiad:
UK2
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The University are undertaking Pre-Market engagement for the procurement for the provision of:A contractor to complete the retrofit of the Law and Psychology BuildingThe Procurement will be undertaken via a two stage stage construction process. The University intends to award two contracts sequentially under the umbrella of a single procurement exercise:Stage 1 AppointmentAward of a NEC4 PCSA – This will be conducted under a competitive flexible procurement process, with stage 1 of the procurement conducted via a Conditions of participation exercise to down select bidders to the ITT stage. The ITT stage will be issued to the down selected bidders and will be awarded on MAT via a NEC4 PCSA contract.The University will appoint 1 contractor under a PCSA contractStage 2 AppointmentThe University will then take forward the appointed contractor under the PCSA contract. Following conclusion of the PCSA to arrive at an agreed Contract sum and Scope, the contractor will be appointed under a NEC4 Option A contract with identified contractors design allocation.The University reserves the right not to proceed to the construction contract from the PCSA contract.ScopeScope of works required at Law Building include: Asbestos Removals. Replacement of existing flat roof systems on both the main section of the building (including the lift motor/plant room) and the lower-level extension built in the 1990s. To facilitate these works roof top PV cells and MEP systems will need to be removed and re-installed (including recommissioning). Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good. FF&E - installation of new replacement windows blinds. Scope of works required at Tower Building included: Asbestos removals. Replacement of existing flat roof systems on the no.2 lower-level extensions only (not including the main roof which has recently been replaced). To facilitate these works roof top MEP systems will need to be removed and re-installed (including recommissioning). Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the windows in the extension built in 2008 which are to be retained). FF&E - installation of new replacement windows blinds. Implementation of plans for phasing, sequencing and building user decanting to deliver the works. Works are to be completed by 10th December 2027. The objectives for the event are;Allow the University to provide an overview of the requirements of the contract.Gauge and generate interest around the contract opportunity and assess the supplier'sability to support the indicative timelines.Obtain feedback and answer any questions on the requirement as currently defined.Provide an opportunity for suppliers to raise any concerns they may have.The University are hosting a Pre-market engagement event on Thursday 11th September 2025 at 14:00 – 15:00 via Teams.In order to register your attendance and for more information please register your interestagainst the opportunity via Cardiff University e-tendering portal: In-Tendhttps://in-tendhost.co.uk/cardiffuniversity/Suppliers interested in attending the supplier engagement event must send an expression ofinterest via the In-Tend Portal. Once registered please complete the registration form andreturn via the correspondence function within the system.Suppliers will be limited to 2 attendees. The deadline for registering attendance at the eventis Friday the 5th of September 2025. The University reserves the right to reject an application to attend sent after this time.All presentation documentation, questions and answers will be published against theopportunity on the Portal following the event.

Testun llawn y rhybydd

Cwmpas

Cyfeirnod caffael

CU.2012.JP

Disgrifiad caffael

The University are undertaking Pre-Market engagement for the procurement for the provision of:

A contractor to complete the retrofit of the Law and Psychology Building

The Procurement will be undertaken via a two stage stage construction process. The University intends to award two contracts sequentially under the umbrella of a single procurement exercise:

Stage 1 Appointment

Award of a NEC4 PCSA – This will be conducted under a competitive flexible procurement process, with stage 1 of the procurement conducted via a Conditions of participation exercise to down select bidders to the ITT stage. The ITT stage will be issued to the down selected bidders and will be awarded on MAT via a NEC4 PCSA contract.

The University will appoint 1 contractor under a PCSA contract

Stage 2 Appointment

The University will then take forward the appointed contractor under the PCSA contract. Following conclusion of the PCSA to arrive at an agreed Contract sum and Scope, the contractor will be appointed under a NEC4 Option A contract with identified contractors design allocation.

The University reserves the right not to proceed to the construction contract from the PCSA contract.

Scope

Scope of works required at Law Building include:

Asbestos Removals.

Replacement of existing flat roof systems on both the main section of the building (including the lift motor/plant room) and the lower-level extension built in the 1990s. To facilitate these works roof top PV cells and MEP systems will need to be removed and re-installed (including recommissioning).

Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good.

FF&E - installation of new replacement windows blinds.

Scope of works required at Tower Building included:

Asbestos removals.

Replacement of existing flat roof systems on the no.2 lower-level extensions only (not including the main roof which has recently been replaced). To facilitate these works roof top MEP systems will need to be removed and re-installed (including recommissioning).

Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the windows in the extension built in 2008 which are to be retained).

FF&E - installation of new replacement windows blinds.

Implementation of plans for phasing, sequencing and building user decanting to deliver the works.

Works are to be completed by 10th December 2027.

The objectives for the event are;

Allow the University to provide an overview of the requirements of the contract.

Gauge and generate interest around the contract opportunity and assess the supplier's

ability to support the indicative timelines.

Obtain feedback and answer any questions on the requirement as currently defined.

Provide an opportunity for suppliers to raise any concerns they may have.

The University are hosting a Pre-market engagement event on Thursday 11th September 2025 at 14:00 – 15:00 via Teams.

In order to register your attendance and for more information please register your interest

against the opportunity via Cardiff University e-tendering portal: In-Tend

https://in-tendhost.co.uk/cardiffuniversity/

Suppliers interested in attending the supplier engagement event must send an expression of

interest via the In-Tend Portal. Once registered please complete the registration form and

return via the correspondence function within the system.

Suppliers will be limited to 2 attendees. The deadline for registering attendance at the event

is Friday the 5th of September 2025. The University reserves the right to reject an application to attend sent after this time.

All presentation documentation, questions and answers will be published against the

opportunity on the Portal following the event.

Prif gategori

Yn gweithio

Rhanbarthau cyflawni

  • UKL22 - Cardiff and Vale of Glamorgan

Cyfanswm gwerth (amcangyfrif)

7500000 GBP Heb gynnwys TAW

9000000 GBP Gan gynnwys TAW

Dyddiadau contract (amcangyfrif)

03 Mawrth 2026, 00:00yb to 10 Rhagfyr 2027, 23:59yh

Awdurdod contractio

Cardiff University

Cofrestr adnabod:

  • GB-PPON

Cyfeiriad 1: Procurement Services

Tref/Dinas: Cardiff

Côd post: CF24 4HQ

Gwlad: United Kingdom

Gwefan: http://www.cardiff.ac.uk/business/why-work-with-us/for-suppliers

Rhif y Sefydliad Caffael Cyhoeddus: PHVT-4343-HWYR

Enw cyswllt: Julie Price

Ebost: Pricejk@cardiff.ac.uk

Math o sefydliad: Awdurdod cyhoeddus - llywodraeth is-ganolog

Rheoliadau datganoledig sy'n berthnasol: Cymru

Gweithdrefn

A yw cyfanswm y gwerth uwchlaw'r trothwy?

Uwchben y trothwy

Lotiau

Wedi'i rannu'n 1 lot

Rhif lot: 1

Dosbarthiadau CPV

  • 71200000 - Gwasanaethau pensaernïol a gwasanaethau cysylltiedig
  • 45214400 - Gwaith adeiladu ar gyfer adeiladau prifysgol

Rhanbarthau cyflawni

  • UKL22 - Cardiff and Vale of Glamorgan

Cynaladwyedd

Busnesau bach a chanolig (BBaCh)

Dyddiad cychwyn y contract (amcangyfrif)

03 Mawrth 2026, 00:00yb

Dyddiad diwedd y contract (amcangyfrif)

10 Rhagfyr 2027, 23:59yh

Ymrwymiad

Disgrifiad o'r broses ymgysylltu

The University are hosting a Pre-market engagement event on Thursday 11th September 2025 at 14:00 – 15:00 via Teams.

In order to register your attendance and for more information please register your interest

against the opportunity via Cardiff University e-tendering portal: In-Tend

https://in-tendhost.co.uk/cardiffuniversity/

Suppliers interested in attending the supplier engagement event must send an expression of

interest via the In-Tend Portal. Once registered please complete the registration form and

return via the correspondence function within the system.

Suppliers will be limited to 2 attendees. The deadline for registering attendance at the event

is Friday the 5th of September 2025. The University reserves the right to reject an application to attend sent after this time.

All presentation documentation, questions and answers will be published against the

opportunity on the Portal following the event.

Dyddiad dyledus

05 Medi 2025, 23:59yh

A yw’r cyfnod ymgysylltu eisoes wedi dod i ben?

Nac ydw

Cyflwyno

Dyddiad cyhoeddi hysbysiad tendro (amcangyfrif)

01 Hydref 2025

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45214400 Gwaith adeiladu ar gyfer adeiladau prifysgol Gwaith adeiladu ar gyfer adeiladau sy’n gysylltiedig ag addysg ac ymchwil
71200000 Gwasanaethau pensaernïol a gwasanaethau cysylltiedig Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Ynglŷn â'r prynwr

Prif gyswllt:
n/a
Cyswllt gweinyddol:
n/a
Cyswllt technegol:
n/a
Cyswllt arall:
n/a

Gwybodaeth bellach

Dyddiad Manylion

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.