SO1323 SEW Pond Cleansing

  • Cyhoeddwyd gyntaf: 26 Awst 2026
  • Wedi'i addasu ddiwethaf: 15 Medi 2026
  • Fersiwn: N/A
  •  

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Eicon Gwybodaeth

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-169403
Cyhoeddwyd gan:
Caerphilly County Borough Council
ID Awudurdod:
AA0272
Dyddiad cyhoeddi:
26 Awst 2026
Dyddiad Cau:
25 Medi 2026
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

Proposed works to cleanse the SEW Attenuation Pond in accordance with the Specification and contract documentation to include: The extent of the Site and the principal constraints are identified on the Contract Drawings and within the Pre-Construction Information and Site Information. (b) The objective of the Works is to remove the accumulated sediment from the attenuation pond and restore the pond to its original design storage capacity. (c) The Works include, but are not limited to: - establishment of safe access and egress, temporary working areas, traffic management, ground protection and Site security; - temporary removal and subsequent reinstatement of existing permanent fencing and gates where required for access; - vegetation clearance and coppicing only as identified on the Contract Drawings, together with protection of retained trees and vegetation; - removal of Reedmace and associated rhizomes from the pond; - temporary water management necessary to undertake the Works while maintaining pollution prevention and ecological controls; - removal of accumulated silt and sediment to the design pond-bed level of 144.5 m AOD, subject to the requirements of Clause 3.1; - temporary storage and dewatering of removed sediment and its treatment on Site before off-Site removal; - sampling, verification, transport and lawful disposal of treated sediment and all other waste arising from the Works; - protection of the pond formation, any existing pond liner, inlet and outlet structures, embankments, drainage apparatus and other existing assets; - reinstatement of all areas affected by the Works, including fencing, access routes, unpaved land and any affected highway surface; and - completion surveys, records and photographs demonstrating compliance with the Scope. (d) The detailed construction methodology is the responsibility of the Contractor. The requirements of this Specification define the required outcomes and constraints and do not prescribe the means by which the Contractor is to achieve them. (e) No new pond liner, permanent alteration to the existing pond drainage system, or permanent highway construction is included in the Scope unless instructed in accordance with the Conditions of Contract.

Testun llawn y rhybydd

HYSBYSIAD O GONTRACT - CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Caerphilly County Borough Council

Engineering Projects Group, Penallta House, Tredomen Park, Ystrad Mynach,

Hengoed

CF82 7PG

UK

Carl Bugler

+44 1443863269

buglec@caerphilly.gov.uk

+44 1443863167
https://www.caerphilly.gov.uk

1.2

Cyfeiriad ar gyfer cael dogfennaeth


Caerphilly County Borough Council

Penallta House, Tredomen Park, Ystrad Mynach,

Hengoed

CF82 7PG

UK


+44 1443863283


1.3

Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:


Caerphilly County Borough Council

Penallta House, Tredomen Park, Ystrad Mynach,

Hengoed

CF82 7PG

UK


+44 1443863283


2 Manylion y Contract

2.1

Teitl

SO1323 SEW Pond Cleansing

2.2

Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen

Proposed works to cleanse the SEW Attenuation Pond in accordance with the Specification and contract documentation to include:

The extent of the Site and the principal constraints are identified on the Contract Drawings and within the Pre-Construction Information and Site Information.

(b) The objective of the Works is to remove the accumulated sediment from the attenuation pond and restore the pond to its original design storage capacity.

(c) The Works include, but are not limited to:

- establishment of safe access and egress, temporary working areas, traffic management, ground protection and Site security;

- temporary removal and subsequent reinstatement of existing permanent fencing and gates where required for access;

- vegetation clearance and coppicing only as identified on the Contract Drawings, together with protection of retained trees and vegetation;

- removal of Reedmace and associated rhizomes from the pond;

- temporary water management necessary to undertake the Works while maintaining pollution prevention and ecological controls;

- removal of accumulated silt and sediment to the design pond-bed level of 144.5 m AOD, subject to the requirements of Clause 3.1;

- temporary storage and dewatering of removed sediment and its treatment on Site before off-Site removal;

- sampling, verification, transport and lawful disposal of treated sediment and all other waste arising from the Works;

- protection of the pond formation, any existing pond liner, inlet and outlet structures, embankments, drainage apparatus and other existing assets;

- reinstatement of all areas affected by the Works, including fencing, access routes, unpaved land and any affected highway surface; and

- completion surveys, records and photographs demonstrating compliance with the Scope.

(d) The detailed construction methodology is the responsibility of the Contractor. The requirements of this Specification define the required outcomes and constraints and do not prescribe the means by which the Contractor is to achieve them.

(e) No new pond liner, permanent alteration to the existing pond drainage system, or permanent highway construction is included in the Scope unless instructed in accordance with the Conditions of Contract.

2.3

Cod a Dosbarthiad yr Hysbysiad

41000000 Collected and purified water
45000000 Construction work
45252124 Dredging and pumping works
90000000 Sewage, refuse, cleaning and environmental services
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)

2.4

Cyfanswm maint neu gwmpas y tendr

The Tender will be split to

50% Cost

50% quality

3 Amodau ar gyfer Cymryd Rhan

3.1

Safonau gofynnol a'r cymhwyster sydd ei angen

Be able to undertake the works in accordance with the Tender documents and Specification

4 Gwybodaeth Weinyddol

4.1

Math o Weithdrefn

Un cam

4.2

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

4.3

Terfynau Amser



Terfyn amser ar gyfer derbyn tendrau wedi'u cwblhau
     23 - 09 - 2026  Amser   12:00

Dyddiad dyfarnu amcangyfrifedig   09 - 10 - 2026

4.5

Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan

EN  

4.6

Blwch Postio Cyflwyno Tendrau

5 Gwybodaeth Arall

5.1

Gwybodaeth Ychwanegol

The Site comprises the SEW attenuation pond at Pontllanfraith, near Penmaen Road/Woodfieldside, Blackwood, within Caerphilly County Borough.

The Contractor shall familiarise itself with the Site, access constraints, embankments, existing fencing and gates, retained vegetation, pond inlet and outlet structures, proposed working/treatment areas and interfaces with the public highway before commencing the Works. Final access and egress arrangements shall comply with the Contract Drawings and the accepted methodology.

(WA Ref:169403)

5.2

Dogfennaeth Ychwanegol

5.3

Dyddiad cyhoeddi'r hysbysiad hwn

  26 - 08 - 2026

Codio

Categorïau nwyddau

ID Teitl Prif gategori
41000000 Dwr wedi’i gasglu a’i buro Amgylchedd a Glanweithdra
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45252124 Gwaith carthu a phwmpio Gwaith adeiladu ar gyfer gweithfeydd trin carthion, gweithfeydd puro a gweithfeydd llosgi sbwriel
90000000 Gwasanaethau carthffosiaeth, sbwriel, glanhau ac amgylcheddol Amgylchedd a Glanweithdra

Lleoliadau Dosbarthu

ID Disgrifiad
1016 Cymoedd Gwent (Torfaen, Blaenau Gwent, Caerffili)

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
buglec@caerphilly.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
15/09/2026 10:36
Notice date(s) changed
The Deadline date was changed from 23/09/2026 12:00 to 25/09/2026 12:00.