Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
UNIVERSITY OF EAST ANGLIA
RC000651
Norwich Research Park,Earlham Road
NORWICH
NR47TJ
UK
Person cyswllt: Karen Gallant
E-bost: karen.gallant@uea.ac.uk
NUTS: UKH15
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.uea.ac.uk/
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Addysg
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
PURCON 1053 Graduation Production Services
Cyfeirnod: PURCON 1053
II.1.2) Prif god CPV
79950000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
Graduation is a high-profile event in the University calendar, celebrating the hard work and success of our graduating students together with their family and friends. The event consists of a formal ceremony held in a sports hall within the Sportspark which facilitates the conferment of awards, followed by an informal 'festival feel' reception within the Athletics outside arena. A Production company is required to equip internally the sports halls 1, 2 & 3 with the necessary infrastructure to include but limited to; flooring, draping, rigging, staging and AV equipment. Externally a provision of various outdoor structures, site trackway, toilets, fencing and generators with full production management in both areas.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: 2 983 333.33 GBP / Y cynnig uchaf: 3 187 054.68 GBP
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKH15
Prif safle neu fan cyflawni:
University of East Anglia
Norwich Research Park
Earlham Road
Norwich
Norfolk
NR4 7TJ
II.2.4) Disgrifiad o’r caffaeliad
Graduation is a high-profile event in the University calendar, celebrating the hard work and success of our graduating students together with their family and friends. The event consists of a formal ceremony held in a sports hall within the Sportspark which facilitates the conferment of awards, followed by an informal 'festival feel' reception within the Athletics outside arena. A Production company is required to equip internally the sports halls 1, 2 & 3 with the necessary infrastructure to include but limited to; flooring, draping, rigging, staging and AV equipment. Externally a provision of various outdoor structures, site trackway, toilets, fencing and generators with full production management in both areas.
II.2.5) Meini prawf dyfarnu
Maen prawf cost: Quality
/ Pwysoliad: 60
Maen prawf cost: Price
/ Pwysoliad: 40
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Contract is initially 2 years with 2 x 1 year extensions at the discretion of the contracting authority,
II.1.7. Total value of the procurement (excluding VAT) - Value range is representative of a 4 year contract term (assuming contract extensions are undertaken)
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2022/S 000-028020
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
29/11/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 3
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 3
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Production Bureau Ltd
04115489
Norwich
UK
NUTS: UKH17
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot: 3 187 054.68 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
University of East Anglia
Earlham Road, Norwich Research Park
Norwich
NR4 7TJ
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
The University has incorporated a minimum of 10 calendar days standstill period at the point the information on the award of contract was communicated to tenderers. No appeal regarding the award of contract was received during the standstill period.
Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take action in the High Court. Any such action must be brought promptly and within the limitation period described in the Public Contracts Regulations 2015.
VI.5) Dyddiad anfon yr hysbysiad hwn
20/12/2022