Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Gontract

Marine Survey. Sea Link Nearshore Boreholes

  • Cyhoeddwyd gyntaf: 09 Rhagfyr 2023
  • Wedi'i addasu ddiwethaf: 09 Rhagfyr 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-042288
Cyhoeddwyd gan:
National Grid Electricity Transmission plc
ID Awudurdod:
AA78559
Dyddiad cyhoeddi:
09 Rhagfyr 2023
Dyddiad Cau:
08 Ionawr 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The PQQ process is to establish market capability to carry out the required works within the time period indicated. It is the Client's intent to follow up the PQQ responses with a tendering process with a view to award a Marine Nearshore GI Boreholes contract based on a detailed RFP process.

Sea Link has already undertaken a cable route survey of the corridor for the planned marine corridor, including the nearshore and landfall zones to the location of the Transition Joint Bay Compound.

Sea Link has committed to trenchless solutions for the beach crossings at the Suffolk landfall, Aldeburgh as well as the Kent landfall Pegwell Bay. Nearshore boreholes to collect geotechnical and physical core data are required at each landfall.

Access to the sampling sites is presumed from the marine environment, due to the environmental sensitivity of the landfalls and exposure to coastal processes, requiring specialised equipment and appropriate methodologies which have been subject to thorough risk assessments. The Kent locations are on mudflats which are exposed at low water. Completion of the acquisition, testing and reporting needs to be completed no later than Q2 2024 subject to relevant consents and permits being in place. The Employer will provide detailed technical specifications for Tenderer to comply with at the RFP stage (stage 2).

Testun llawn y rhybydd

Hysbysiad contract - cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

NATIONAL GRID ELECTRICITY TRANSMISSION PLC

02366977

1 - 3 Strand

Warwick

CV34 6DA

UK

Person cyswllt: Rebecca Pearson

E-bost: rebecca.pearson@nationalgrid.com

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.nationalgrid.com/electricity-transmission/

I.3) Cyfathrebu

Mae mynediad at y dogfennau caffael yn gyfyngedig. Gellir cael rhagor o wybodaeth yn:

http://www.ariba.com/


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


I.6) Prif weithgaredd

Trydan

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Marine Survey. Sea Link Nearshore Boreholes

II.1.2) Prif god CPV

71354500

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

Sea link high voltage direct current (HVDC) link between Suffolk and Kent with onshore converter stations and connections back to the national electricity transmission system.

Sea Link has committed to trenchless solutions for the beach crossings at the Suffolk landfall, Aldeburgh as well as the Kent landfall Pegwell Bay. Nearshore boreholes are required to collect geotechnical and physical core data at each landfall

To register your interest in this Procurement event and to obtain the pre-qualification documentation applicants are to email Rebecca.Pearson@nationalgrid.com using the wording 'Registering Interest for 'Marine Survey. Sea Link Nearshore Boreholes'.(if you have them) your Ariba AN number (Network ID), name, email address and contact phone number for all contacts within your organisation who will need to receive Ariba messages and administer your online submissions. Following receipt of this information National Grid will invite you to the Ariba event where all the pre-qualification documentation is contained including further instructions.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UK

II.2.4) Disgrifiad o’r caffaeliad

The PQQ process is to establish market capability to carry out the required works within the time period indicated. It is the Client's intent to follow up the PQQ responses with a tendering process with a view to award a Marine Nearshore GI Boreholes contract based on a detailed RFP process.

Sea Link has already undertaken a cable route survey of the corridor for the planned marine corridor, including the nearshore and landfall zones to the location of the Transition Joint Bay Compound.

Sea Link has committed to trenchless solutions for the beach crossings at the Suffolk landfall, Aldeburgh as well as the Kent landfall Pegwell Bay. Nearshore boreholes to collect geotechnical and physical core data are required at each landfall.

Access to the sampling sites is presumed from the marine environment, due to the environmental sensitivity of the landfalls and exposure to coastal processes, requiring specialised equipment and appropriate methodologies which have been subject to thorough risk assessments. The Kent locations are on mudflats which are exposed at low water. Completion of the acquisition, testing and reporting needs to be completed no later than Q2 2024 subject to relevant consents and permits being in place. The Employer will provide detailed technical specifications for Tenderer to comply with at the RFP stage (stage 2).

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 4

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.8) Ar ba ffurf gyfreithiol y bydd y gr?p o weithredwyr economaidd y caiff y contract ei ddyfarnu iddynt:

No specific legal form is required in order to participate in the procurement stage. However, National Grid reserves the right to require successfully appointed suppliers to take a specific legal form and/or accept joint and several liability if constituted as a group of economic operators.

III.2) Amodau sy’n gysylltiedig â’r contract

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.4) Gwybodaeth am leihau nifer yr atebion neu’r tendrwyr yn ystod negodiad neu ddeialog

Troi at weithdrefn fesul cam er mwyn mynd ati’n raddol i leihau nifer yr atebion i’w trafod neu’r tendrau i’w negodi

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 08/01/2024

Amser lleol: 11:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr

Hyd mewn misoedd: 6  (o’r dyddiad a nodwyd i dendr ddod i law)

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.3) Gwybodaeth ychwanegol

Interested parties should note that National Grid is using the Ariba portal, details in Section I.3 and 11.1.4. of this notice.

All documentation will be made available through this portal.

All communications by interested parties must be made to the contacts in Section 11.1.4 . Once interested parties have been invited to the Ariba Event, National Grid will then only communicate through the portal.

Communications sent by alternative means and/or to any other person will be ignored. Please note that a "request to participate" for the purposes of section IV.2.2 of this notice is by completion and return of the Pre-Qualification Questionnaire (PQQ), which is available through the Ariba portal, by the stated deadline.

Interested parties should note that National Grid reserves the right to cancel or vary this procurement process at any stage. National Grid may also change the basis, procedures and/or timescales set out or referred to within the procurement documents. National Grid will not be liable for any costs or expenses whatsoever incurred by interested parties in participating in this procurement process.

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court

Royal Courts of Justice, The Strand

London

WC2A 2LL

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

07/12/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71354500 Gwasanaethau arolygu morol Siwgr masarn a surop masarn

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
rebecca.pearson@nationalgrid.com
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.