Eastern Green Link 3, Scotland to Norfolk, England HVDC Link Project-Cables

  • Cyhoeddwyd gyntaf: 13 Rhagfyr 2023
  • Wedi'i addasu ddiwethaf: 13 Rhagfyr 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-042513
Cyhoeddwyd gan:
National Grid Electricity Transmission plc
ID Awudurdod:
AA78559
Dyddiad cyhoeddi:
13 Rhagfyr 2023
Dyddiad Cau:
22 Ionawr 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Design, supply, manufacture, install, test and commission of 525kV HVDC submarine and underground cable system and HVDC onshore underground cable system supply, installation and associated civil engineering works as required that will link the Netherton Hub near Peterhead in Scotland to the adjacent coast. Design, supply but not install the cable that is to be routed onshore between the Lincolnshire coast and Norfolk, England.

The scope of this Procurement includes the provision of two HVDC cable poles (underground and submarine cable) utilising 525kV extruded cable systems. L. Proposed cable systems (cables and accessories, including factory joints and transition joints) shall be type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

With option of DCSS there would be the requirement for a three cable solution between the DCSS and local convertor (circa 1km).

The cable shall be capable of delivering 2GW.

The Employers reserve the right to take up to a maximum of four Suppliers through the prequalification process and into the tender process.

Applicants are advised that, for the purpose of the contracts, the Employers may potentially enter into joint venture arrangements prior to awarding any contract from this activity. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured.

The Employers are considering the potential to award early works.

Testun llawn y rhybydd

Hysbysiad contract - cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

National Grid Electricity Transmission PLC

04508773

1-3 Strand

London

WC2N 5EH

UK

Person cyswllt: David Andrews

Ffôn: +44 7787156827

E-bost: david.andrews@nationalgrid.com

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.nationalgrid.com

I.1) Enw a chyfeiriad

Scottish Hydro Electric Transmission PLC

SC213461

Inveralmond House, 200 Dunkeld Road

Perth

PH1 3AQ

UK

Person cyswllt: Jill Humphries

Ffôn: +44 7918473059

E-bost: jill.humphries@sse.com

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.ssen.co.uk/Home

I.2) Caffael ar y cyd

Mae a wnelo’r contract â chaffael ar y cyd

Yn achos caffael ar y cyd sy'n cynnwys gwahanol wledydd – cyfraith caffael genedlaethol berthnasol:

England & Wales

I.3) Cyfathrebu

Mae mynediad at y dogfennau caffael yn gyfyngedig. Gellir cael rhagor o wybodaeth yn:

www.ariba.com


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

www.ariba.com


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


Mae cyfathrebu electronig yn gofyn am ddefnyddio offer a dyfeisiau nad ydynt ar gael yn gyffredinol. Mae mynediad uniongyrchol anghyfgyfyngiedig a llawn i'r offer a dyfeisiau hyn yn bosibl, yn rhad ac am ddim, yn:

www.ariba.com


I.6) Prif weithgaredd

Trydan

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Eastern Green Link 3, Scotland to Norfolk, England HVDC Link Project-Cables

Cyfeirnod: WS 4346053431

II.1.2) Prif god CPV

45000000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

National Grid Electricity Transmission PLC and Scottish Hydro Electric Transmission PLC (the "Employers") are jointly developing a HVDC link between the Netherton Hub, west of Peterhead, Scotland and Norfolk, England (the "HVDC Link"). This notice concerns the procurement and award of contract(s) for:

• Design, supply, manufacture, install, test and commission 525kV HVDC submarine and underground cable system, including but not limited to:

• extruded cable systems at along with all associated cable accessories

• HVDC submarine cable supply and complete installation including lay, jointing and burial. The submarine route length is expected to be in the range of 540 to 580km.

• HVDC onshore underground cable system supply, installation and associated civil engineering works as required that will link the Peterhead site in Scotland to the adjacent coast. The onshore route length of this element is approximately 10 km.

• AC cable circa 1km at Peterhead site in Scotland, 3-10km at Norfolk site.

• There is an option that it will be routed through a DCSS (DC Switching Station) also to be located within the Netherton Hub

• Design, supply but not install the cable that is to be routed onshore between the Lincolnshire coast and Norfolk, England. The onshore route length of this element is expected to be in the range of 90 to 135km. This cable will be installed onshore by others.

• Jointing of the onshore cable between Lincolnshire and Norfolk, the provision of installation instructions for use by the installation contractor and technical supervision of the onshore cable installation.

• Provision of cable spares and storage facilities for cable spares.

• Design, engineer, prepare, procure and install HDD (Horizontal Direct Drilling) ducts as required at the landfalls in both Scotland and England.

• Front-end engineering design services, in relation to any or all of the aforementioned scope.

• The Employers will require the Preferred Bidder to enter a Long-Term Service Agreement (LTSA) for the cable systems, either as part of the main contract or a standalone contract. This may be structured as an agreement with the Employers either acting jointly or as a Joint Venture, or as separate LTSAs with each Employer with regard to separate sections of the cable.

II.1.5) Cyfanswm gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 2 500 000 000.00 GBP

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

31200000

31321300

31321500

45231400

45314310

II.2.3) Man cyflawni

Cod NUTS:

UK


Prif safle neu fan cyflawni:

UK

II.2.4) Disgrifiad o’r caffaeliad

Design, supply, manufacture, install, test and commission of 525kV HVDC submarine and underground cable system and HVDC onshore underground cable system supply, installation and associated civil engineering works as required that will link the Netherton Hub near Peterhead in Scotland to the adjacent coast. Design, supply but not install the cable that is to be routed onshore between the Lincolnshire coast and Norfolk, England.

The scope of this Procurement includes the provision of two HVDC cable poles (underground and submarine cable) utilising 525kV extruded cable systems. L. Proposed cable systems (cables and accessories, including factory joints and transition joints) shall be type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

With option of DCSS there would be the requirement for a three cable solution between the DCSS and local convertor (circa 1km).

The cable shall be capable of delivering 2GW.

The Employers reserve the right to take up to a maximum of four Suppliers through the prequalification process and into the tender process.

Applicants are advised that, for the purpose of the contracts, the Employers may potentially enter into joint venture arrangements prior to awarding any contract from this activity. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured.

The Employers are considering the potential to award early works.

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.6) Gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 2 500 000 000.00 GBP

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 150

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.1) Addasrwydd i ymgymryd â’r gweithgaredd proffesiynol, gan gynnwys gofynion mewn perthynas â chofrestru ar gofrestri proffesiynol neu gofrestri masnach

Rhestr a disgrifiad byr o’r amodau:

As described in the procurement documents

III.1.2) Statws economaidd ac ariannol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.3) Gallu technegol a phroffesiynol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.4) Rheolau a meini prawf gwrthrychol ar gyfer cymryd rhan

As described in the procurement documents

III.1.6) Adneuon a gwarantau sy’n ofynnol:

The following contractual security may be required from the Applicants:

Parent company guarantees from the ultimate parent company or equivalent third party security

Performance and warranty bonds

Collateral warranties in favour of the Employers from all key subcontractors (to be

determined by the Employers)

Advance payment bonds if the Employers agree to an advance payment in each case as more fully described in the procurement documents

III.1.7) Prif amodau cyllido a threfniadau talu a/neu gyfeiriad at y darpariaethau perthnasol sy’n eu llywodraethu:

Eastern Green Link 3 (EGL3) Scotland to England Green Link (SEGL) 3 is subject to regulation under the Ofgem RIIO-T2

Large Onshore Transmission Investment regime and therefore the project costs and payment provisions may be subject to regulatory oversight.

III.1.8) Ar ba ffurf gyfreithiol y bydd y gr?p o weithredwyr economaidd y caiff y contract ei ddyfarnu iddynt:

Where there is a group of economic operators, joint venture or consortium each economic operator, joint venture partner or consortium member must be jointly and severally liable for the whole of the performance of the obligations under any contract to which it is a party.

III.2) Amodau sy’n gysylltiedig â’r contract

III.2.2) Amodau perfformiad contractau

Contracts will be structured on a supply and install basis and will be subject to the laws of England & Wales. They will contain performance guarantees.

It is anticipated that the contract for the Works will be awarded by early 2025. The Works will require to be delivered in time to allow the final EGL3 asset to be in service by the date set by Ofgem. As at the date of this notice, Ofgem’s requirement for the EGL3 asset to be in-service is anticipated to be Q4 2030.

These dates are indicative. Any available update to these dates and/or further information will be provided in the ITT.

III.2.3) Gwybodaeth am y staff a fydd yn gyfrifol am gyflawni’r contract

Rhwymedigaeth i nodi enwau a chymwysterau proffesiynol y staff a glustnodwyd i gyflawni’r contract

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 22/01/2024

Amser lleol: 17:00

IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd

Dyddiad: 01/04/2024

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr

Hyd mewn misoedd: 16  (o’r dyddiad a nodwyd i dendr ddod i law)

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.3) Gwybodaeth ychwanegol

Applicants are advised that, for the purpose of the contracts, the Employers may potentially enter into joint venture arrangements prior to awarding any contract from this activity. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured.

The Employers reserve the right to withdraw this notice at any time for whatever reason.

Applicants shall be fully responsible for the costs of responding to this procurement at all stages of the procurement and in no circumstances do the Employers accept any liability for any costs incurred by any Applicants, howsoever or whensoever incurred.

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court of Justice

King's Bench Division Divisional Court, Royal Courts of Justice, Strand,

London

WC2A 2LL

UK

Ffôn: +44 02039368957

Cyfeiriad(au) rhyngrwyd

URL: https://www.find-court-tribunal.service.gov.uk/courts/kings-bench-division

VI.5) Dyddiad anfon yr hysbysiad hwn

12/12/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
31321300 Cebl foltedd uchel Llinellau pwer trydan
31321500 Cebl llong danfor Llinellau pwer trydan
31200000 Cyfarpar dosbarthu a rheoli trydan Peiriannu, cyfarpar, offer a defnyddiau traul trydanol; goleuadau
45314310 Gosod gosodiadau cebl Gosod cyfarpar telathrebu
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45231400 Gwaith adeiladu ar gyfer llinellau pwer trydan Gwaith adeiladu ar gyfer piblinellau, llinellau cyfathrebu a llinellau pwer

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
david.andrews@nationalgrid.com
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.