08/02/2019 16:32 |
Excel version of bill "Measured Works"
We have an a price able version of the measured bills available for issue from Mark@acanthus-holden.co.uk It is incumbent on the pricing contractor to make sure the spread sheet functions and is complete.
|
08/02/2019 16:55 |
Additional Eligibility Questions
Compulsory Elegibility Questions are available from Mark@acanthus-holden.co.uk.
|
11/02/2019 15:12 |
Form of Tender
Available for issue on request from Mark@acanthus-holden.co.uk
|
12/02/2019 09:18 |
700 series drawings
These were missing from the original transfer.
|
12/02/2019 10:14 |
Excel version of bill "Measured Works"
To unlock the excel document, insert the password “bowens”
|
12/02/2019 16:52 |
site visit
Please advise on the preferred dates for a site visit. This is required as part of the quality assessment.
|
12/02/2019 17:22 |
Supplier/ Sub Contractor list
Supplier/ Sub contractor list. This should be adhered to and will be used for the quality assessment.
|
14/02/2019 16:11 |
Risk Register
Please contact Mark@acanthus-holden.co.uk to request a copy.
|
19/02/2019 09:10 |
L40A and S001B print errors
Apologies but these documents did not print correctly. Correct versions available on request.
|
20/02/2019 09:26 |
Sub contractor list - addendum
Client has requested the following as a named sub contractor for paint and wallpaper decoration:
Jason Edwards s.jedwardspainters@tiscali.co.uk Mob: 07854 451597
2 others to be contractor choice.
|
21/02/2019 11:02 |
Confirmation of site possession and Completion dates
As clarification of the Notice, the date for possession is Monday 15th April 2019. The date for completion would be Thursday 9th April 2020.
|
21/02/2019 11:11 |
L30 585
Spelling error: "Julienne" should read "Juliette"
|
25/02/2019 10:29 |
Notice date(s) changed
The Deadline date was changed from 14/03/2019 12:00 to 04/04/2019 12:00.
Updated Bills. New date for contract award given as Monday 6th May
|
25/02/2019 10:39 |
ADDED FILE: Updated bills and clarification on schedules
Update Bills Quality Assessment Form Updated interior finishes and ironmongery documents
|
25/02/2019 10:40 |
REPLACED FILE: Syntha_Pulvin_Matt_Metallic_Technical_Data_Sheet
Update Bills Quality Assessment Form Updated interior finishes and ironmongery documents
|
25/02/2019 14:01 |
ADDED FILE: Section A - Prelims
Section A - Prelims
|
01/03/2019 08:11 |
ADDED FILE: List of amendments to revised bills
List of amendments to revised bills
|
04/03/2019 13:39 |
Accommodation near St Davids
The client has suggested two sources for accommodation near the works site:
https://www.stbridesbaycottages.com/cottages/st-davids/y-gorlan.html
http://www.glennyddhotel.co.uk/
|
04/03/2019 14:41 |
ADDED FILE: Signage schedule printing error
All pages now included
|
04/03/2019 16:34 |
ADDED FILE: Sub contract/ supplier correction
Email address corrected
|
14/03/2019 10:58 |
ADDED FILE: Remaining elevation coloured drawings
Clarification of the elevational colour scheme
|
15/03/2019 11:35 |
Wallpaper Measures
The revised quantities for the Wallpaper are :-
Page 64 Item a – 1370 m2
Page 64 Item b – 50 m2
Please manually amend the Bill
|
15/03/2019 16:05 |
ADDED FILE: Door Ironmongery correction
701C +707D - kick plates 714A - grilles 720B - groove detail add P21A + Iron schedC - corrected
|
19/03/2019 10:38 |
Prelim clarification
1. A13 Contract will be the JCT Intermediate Building Contract with Contractors Design 2016 Edition
2. A20 Client has previously confirmed no Advance Payment Bond or Contract Guarantee Bond is required.
3. A31.450 Clause to remain
|
20/03/2019 10:13 |
M51 110 carpet - clarification
Pattern is bespoke, To be confirmed Colours used will be 9-12 in number. The seaming is butt jointed with both the carpet and underlay double stuck. All edges to be sealed with seam sealant.
|
25/03/2019 13:43 |
ADDED FILE: Tender return date
Altered to Thursday 11th April 2019
|
01/04/2019 11:43 |
Blockwork Restraint
Page 27 of bills, please amend as follows: F30 220 Should read TFMT7 F30 282 – movement joints, needs to be measured 100m linear quantity
|
02/04/2019 09:24 |
ADDED FILE: Room Name Schedule
Issued as part of the signage package
|
02/04/2019 09:34 |
Rainwater goods
Please correct measures on Bill Extension Rev A lines 340, 341,342: Rainwater Gutters – 40m Stop Ends – 16Nr Internal/external angles – 2Nr
|
02/04/2019 09:59 |
Schedule revision correction
Revision correction to Exterior Finishes schedule
|
02/04/2019 10:06 |
ADDED FILE: Exterior Finishes Schedule B
Missing from previous notice
|
02/04/2019 11:38 |
ADDED FILE: Sanitaryware Schedule revision C
Shower tray correctly identified to match other documentation
|
02/04/2019 11:53 |
Notice date(s) changed
The Deadline date was changed from 04/04/2019 12:00 to 11/04/2019 12:00.
By request. Form of tender already re-issued to suit
|
02/04/2019 16:09 |
Temporary Access
Concerns over the steepness of the temporary access have been raised. The enabling works contractor used Hanson Ready Mix Concrete https://www.hanson.co.uk/en/ready-mixed-concrete-pembroke They managed to provide suitable vehicles for this site. Other 6 and 8 wheel vehicles were able to enter site also (20 tons). It is recommended that a rep should visit if any concerns remain.
|
04/04/2019 09:10 |
Tender return
Please note tender return is to be as follows: Return address is as Form of Tender (Acanthus Holden). Return to include Form of Tender, completed Eligibility Questionnaire, Quality Assessment additional questions and priced bills on memory stick.
Please note the original notice cannot be changed to reflect the above.
|
08/04/2019 15:33 |
ADDED FILE: Stone tile description
Limestone Tiles are client supply. Spec attached. Existing tiles can be seen on site.
|
09/04/2019 14:35 |
K10 245
Missing from specification. Should have read as follows:
K10/245 CEILING LINING ON TIMBER as part of floor Compartmentation F01, F01A, F01B, to BS476 - Background: Easy joists/ Posi-Joists. - Metal resilient (acoustic) bars: Gypframe RB1 @ 450mm centres. - Linings: 2 no Gyproc Soundbloc 15mm board. - Fixings: Into bars only . - Finishing:. - Primer/ Sealer: seal both faces both sides with British Gypsum sealer. - Accessories: ______ . - Other requirements: ______ .
|
10/04/2019 11:46 |
Bills - Juliet balcony duplication
Please ignore line 414 & 415 of bills (L30/585) as these are covered in lines 1919 - 1928
|
10/04/2019 14:39 |
Notice date(s) changed
The Deadline date was changed from 11/04/2019 12:00 to 18/04/2019 12:00.
|
10/04/2019 15:25 |
ADDED FILE: Update
K10B, Furniture power update, ecology report, pre construction info, revised prog, form of tender
|
10/04/2019 15:32 |
ADDED FILE: missing files
geotechnical and ecological reports
|
16/04/2019 11:08 |
Interior Doors and wardrobes
Issues have been identified with the veneer supply. For this reason the client has agreed to supply the interior veneered doors and bedroom veneered wardrobes for this project. Please price for fitting these items into contractor pre-prepared openings. Painted finish doors and softwood store cupboard fit out to remain contractor supply and fit.
|