Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Rother District Council
London Road
Bexhill
TN39 3JX
UK
Person cyswllt: Adam Bennett
E-bost: procurement@rother.gov.uk
NUTS: UKJ22
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.rother.gov.uk
Cyfeiriad proffil y prynwr: https://sesharedservices.org/esourcing/
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
ESPH AB Provision of Road Construction (and Associated Infrastructure) Works at Brlackfiars, Battle (ESPH386)
Cyfeirnod: 386
II.1.2) Prif god CPV
45233120
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Rother District Council (‘the Authority’) sought a suitably qualified and experienced Contractor to deliver a spine road to serve a residential development in Battle, East Sussex.
The Blackfriars site in Battle has been identified in the Council’s local planning documents and Corporate Plan as a site for residential development for many years.
The site is approximately 16 hectares (40 acres) in size, though only around 7 hectares are considered suitable for development. Past attempts to develop the site as a whole have been unsuccessful, principally due to complex topography and ground conditions. Development of this site is predicated on the delivery of a new spine road, traversing the site from north to south which would facilitate residential development.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 4 720 026.44 GBP
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45233000
45233100
45233121
45233140
45233226
II.2.3) Man cyflawni
Cod NUTS:
UKJ22
Prif safle neu fan cyflawni:
East Sussex.
II.2.4) Disgrifiad o’r caffaeliad
The intention of this works contract is to build out the spine road in its entirety. There must be flexibility within the programme to pause work on site should acquisition of third-party land be protracted, or to progress the construction of the road expeditiously once acquisition has taken place.
In the unlikely event that the CPO is not approved, construction will take place on Council-owned land only. The tender sum (fee) should therefore be broken down to cover the following scenarios:
Construction of the entire road with no break or pause in construction
Phased development, subject to CPO timescales
Development on RDC land only, should CPO fail
The delivery of a spine road to serve residential development, with vehicular access off Harrier Lane and The Spinney, inclusive of drainage, services and infrastructure works in accordance with Planning Permission RR2019/604/P.
The spine road will be built to adoptable standard, and will be adopted by the local Highway authority (East Sussex County Council)
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Quality — team members
/ Pwysoliad: 10
Maes prawf ansawdd: Quality — programme
/ Pwysoliad: 15
Maes prawf ansawdd: Quality — project delivery
/ Pwysoliad: 10
Maes prawf ansawdd: Quality — ecological and archaeological constraints
/ Pwysoliad: 5
Maes prawf ansawdd: Quality — risk mitigation
/ Pwysoliad: 5
Maes prawf ansawdd: Service continuity
/ Pwysoliad: 5
Maes prawf ansawdd: Legal
/ Pwysoliad: 5
Price
/ Pwysoliad:
45
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gystadleuol gyda negodi
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2020/S 165-401548
Section V: Dyfarnu contract
Rhif Contract: ESPH386
Teitl: ESPH AB Provision of Road Construction (and Associated Infrastructure) Works at Brlackfiars, Battle (ESPH386)
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
08/01/2021
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 1
Nifer y tendrau a ddaeth i law gan BBaChau: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau yr UE: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 0
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 1
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Breheny Civil engineering Ltd
Flordon Road
Ipswich
IP6 8NH
UK
NUTS: UKH14
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 450 000.00 GBP
Cyfanswm gwerth y contract/lot: 4 720 026.44 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court of England and Wales
The Strand
London
WC2A 2LL
UK
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
Cabinet Office
70 Whitehall
London
SW1A 2AS
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
Wealden District Council Observed a standstill period following the award of the contract and conducted itself in respect of any appeals in accordance with the Public Contracts Regulations 2015 (as amended).
VI.5) Dyddiad anfon yr hysbysiad hwn
01/02/2021