Rhif y Lot 2
II.2.1) Teitl
Non-Infrastructure — London
II.2.2) Cod(au) CPV ychwanegol
90420000
45232151
45232421
45232422
45232423
45232430
45232431
45232440
45232451
45232453
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The water non infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance,
— disinfection,
— surge protection,
— chemical dosing,
— supervisory control and data acquisition (SCADA),
— run-to-waste facilities,
— cartridge filters and UV,
— increased power resilience,
— new service reservoirs.
— inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new treatment facilities such as inlet works,
— stormwater storage,
— event duration monitors,
— settlement tanks,
— biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP),
— digester roof replacement,
— combined heat and power (CHP),
— chemical dosing,
— phosphorous removal,
— odour control,
— SCADA,
— increased power resilience.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
This lot shall run for an initial period of approximately 5 years to complement the proposed AMP7 regulatory period. Subject to satisfactory ongoing performance, the contracting entity reserves the right to extend this lot on a period or annual basis for a maximum further 5 years in line with the AMP8 regulatory period.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Lots 1 and 2 were the subject of Contract Notice 536240-2019 — AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects Reference number: FA1488.
Rhif y Lot 3
II.2.1) Teitl
Non-Infrastructure — London
II.2.2) Cod(au) CPV ychwanegol
90420000
45232151
45232421
45232422
45232423
45232430
45232431
45232440
45232451
45232453
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The water non infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance,
— disinfection,
— surge protection,
— chemical dosing,
— supervisory control and data acquisition (SCADA),
— run-to-waste facilities,
— cartridge filters and UV,
— increased power resilience,
— new service reservoirs.
— inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new treatment facilities such as inlet works,
— stormwater storage,
— event duration monitors,
— settlement tanks,
— biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP),
— digester roof replacement,
— combined heat and power (CHP),
— chemical dosing,
— phosphorous removal,
— odour control,
— SCADA,
— increased power resilience.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
This lot shall run for an initial period of approximately 5 years to complement the proposed AMP7 regulatory period. Subject to satisfactory ongoing performance, the contracting entity reserves the right to extend this lot on a period or annual basis for a maximum further 5 years in line with the AMP8 regulatory period.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Lots 1 and 2 were the subject of contract notice 536240-2019 — AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects Reference number: FA1488
Rhif y Lot 3
II.2.1) Teitl
Non-Infrastructure — London
II.2.2) Cod(au) CPV ychwanegol
90420000
45232151
45232421
45232422
45232423
45232430
45232431
45232440
45232451
45232453
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The water non infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance,
— disinfection,
— surge protection,
— chemical dosing,
— supervisory control and data acquisition (SCADA),
— run-to-waste facilities,
— cartridge filters and UV,
— increased power resilience,
— new service reservoirs.
— inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new treatment facilities such as inlet works,
— stormwater storage,
— event duration monitors,
— settlement tanks,
— biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP),
— digester roof replacement,
— combined heat and power (CHP),
— chemical dosing,
— phosphorous removal,
— odour control,
— SCADA,
— increased power resilience.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
This lot shall run for an initial period of approximately 5 years to complement the proposed AMP7 regulatory period. Subject to satisfactory ongoing performance, the contracting entity reserves the right to extend this lot on a period or annual basis for a maximum further 5 years in line with the AMP8 regulatory period.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Lots 1 and 2 were the subject of Contract Notice 536240-2019 — AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects Reference number: FA1488.
Rhif y Lot 4
II.2.1) Teitl
Non-Infrastructure — London
II.2.2) Cod(au) CPV ychwanegol
90420000
45232151
45232421
45232422
45232423
45232430
45232431
45232440
45232451
45232453
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The water non infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance,
— disinfection,
— surge protection,
— chemical dosing,
— supervisory control and data acquisition (SCADA),
— run-to-waste facilities,
— cartridge filters and UV,
— increased power resilience,
— new service reservoirs.
— inspection and maintenance of existing service and storage reservoirs.
The Wastewater non-infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new treatment facilities such as inlet works,
— stormwater storage,
— event duration monitors,
— settlement tanks,
— biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP),
— digester roof replacement,
— combined heat and power (CHP),
— chemical dosing,
— phosphorous removal,
— odour control,
— SCADA,
— increased power resilience.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
This lot shall run for an initial period of approximately 5 years to complement the proposed AMP7 regulatory period. Subject to satisfactory ongoing performance, the Contracting Entity reserves the right to extend this lot on a period or annual basis for a maximum further 5 years in line with the AMP8 regulatory period.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Lots 1 and 2 were the subject of Contract Notice 536240-2019 - AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects Reference number: FA1488
Rhif y Lot 5
II.2.1) Teitl
Non-Infrastructure — London
II.2.2) Cod(au) CPV ychwanegol
90420000
45232151
45232421
45232422
45232423
45232430
45232431
45232440
45232451
45232453
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The water non infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance,
— disinfection,
— surge protection,
— chemical dosing,
— supervisory control and data acquisition (SCADA),
— run-to-waste facilities,
— cartridge filters and UV,
— increased power resilience,
— new service reservoirs.
— inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to:
— refurbishment, replacement and provision of new treatment facilities such as inlet works,
— stormwater storage,
— event duration monitors,
— settlement tanks,
— biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP),
— digester roof replacement,
— combined heat and power (CHP),
— chemical dosing,
— phosphorous removal,
— odour control,
— SCADA,
— increased power resilience.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
This lot shall run for an initial period of approximately 5 years to complement the proposed AMP7 regulatory period. Subject to satisfactory ongoing performance, the Contracting Entity reserves the right to extend this lot on a period or annual basis for a maximum further 5 years in line with the AMP8 regulatory period
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Lots 1 and 2 were the subject of Contract Notice 536240-2019 — AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects Reference number: FA1488.
Teitl: Lot 3 — Thames Valley Non-Infrastructure, Lot 6 South London Infrastructure
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Teitl: Lot 6 South London Infrastructure, Lot 7 Thames Valley Infrastructure
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Teitl: Lot 4 Thames Valley Non-Infrastructure, Lot 7 Thames Valley Infrastructure
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
It is proposed that these framework agreements will run for an initial period of approximately 5 years, with the option to extend on an annual basis for a maximum further 5 years. TWUL does not propose to amend the scope of works across each of the lots as it moves from AMP7 to AMP8. TWUL reserves the right to extend individual lots within this framework agreement, where operational benefits exist for doing so. TWUL proposes that any extension will apply to all elements of the contract, including but not limited to price review mechanisms (subject to any approved variations).
Note that your client may be Thames Water Utilities Ltd or another company within the Kemble Water group structure.