Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
East Renfrewshire Council
Eastwood HQ, Eastwood Park,
Giffnock
G46 6UG
UK
Ffôn: +44 1415778655
E-bost: vanessa.fordyce@eastrenfrewshire.gov.uk
NUTS: UKM83
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.eastrenfrewshire.gov.uk
Cyfeiriad proffil y prynwr: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00183
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Aurs Road Upgrade and Realignment and Balgray Reservoir Promenade and Permanent Lowering Works
Cyfeirnod: ERC000189
II.1.2) Prif god CPV
45200000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
East Renfrewshire Council has now awarded to a suitably qualified company for the Aurs Road Upgrade and Realignment and Balgray Reservoir Promenade and Permanent Lowering Works. The project is part of East Renfrewshire Council's City Deal portfolio and consists of the upgrade and realignment of Aurs Road, Barrhead, stretching from the junction of Springfield Road to Stewarton Road including the installation of a Promenade and active travel route
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: 17 162 249.61 GBP / Y cynnig uchaf: 23 329 227.00 GBP
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45233100
45233120
45233140
44212100
44212120
45221000
45221100
45221110
45221111
45221113
45221115
45221119
44132000
45221220
45247270
44611600
45246500
45112700
45112730
II.2.3) Man cyflawni
Cod NUTS:
UKM83
II.2.4) Disgrifiad o’r caffaeliad
The works now awarded consist of 2 sections of new road being created to provide a better alignment for the overall road; new bridge designs including creation of new bridge to replace an existing weak road bridge, creation of new foot bridge. Partial alteration of the existing walkway bridge to Scottish Water’s drawdown tower; narrowing of road to one lane and associated traffic signal control as the road passes beneath the railway bridge; accommodation works within a neighbouring farm land to make good and reinstate the owners current procedures following disruption caused by one of the new road sections; installation of new round-a-bout; install culvert between Balgray Reservoir and Brock Burn by undertaking deep cut through Dam structure; resurfacing of the full stretch of road covering between the two junction points noted above; and the installation of a Promenade along Balgray Reservoir An overflow weir that spills into Brock Burn will also be removed / infilled and this will allow the whindust path above the weir to be resurfaced with tarmac from the end of the promenade to the bridge over the next flow control structure on the reservoir.
East Renfrewshire Council have partnered with Scottish Water to deliver this project and while East Renfrewshire Council will be the Employer under the NEC Contract, the Culvert and Weir infill will be delivered by the successful Contractor on behalf of Scottish Water. The culvert and weir infill works are required to address an “interest of safety” matter by improving the capacity of the reservoir drawdown.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Method Statement
/ Pwysoliad: 20
Maes prawf ansawdd: Programme of Works
/ Pwysoliad: 10
Maes prawf ansawdd: Team & NEC contract Experience
/ Pwysoliad: 40
Maes prawf ansawdd: Sustainability
/ Pwysoliad: 10
Maes prawf ansawdd: Community Benefits
/ Pwysoliad: 10
Maes prawf ansawdd: Fair Work Practices & Living Wage
/ Pwysoliad: 10
Price
/ Pwysoliad:
30
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
The contract is for a period of 48 months (12 months construction, 36 months maintenance period).
Economic Operators may be excluded from this competition if they are in any of the situations referred to in Regulation 58 or 59 of the Public Contracts (Scotland) Regulations 2015.
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-012845
Section V: Dyfarnu contract
Rhif Contract: ERC000189
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
14/11/2023
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 5
Nifer y tendrau a ddaeth i law gan BBaChau: 2
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau yr UE: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 5
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 5
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
John Graham Construction Ltd
Ballygowan Road
Hillsborough
BT26 6HX
UK
Ffôn: +44 2890684508
Ffacs: +44 2892689600
NUTS: UKN0
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot: 17 162 249.61 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
Prompt Payment-The successful tenderer shall, as a condition of being awarded the contract, be required to demonstrate to the council's satisfaction that all funds due to the tenderer's permitted sub-contractors in respect of these services are paid timeously and that as a minimum invoices rendered by subcontractors shall(unless formally disputed by the tenderer)be paid within 30 days
of receipt. The successful tenderer shall also impose this condition on its subcontractors in respect of payments due to any sub-sub-contractors, if any.
The Council reserves the right to request copies of insurance certificates from bidders at any point during the contract period. Failure to supply the information within timeframe requested may result in your bid being rejected & the Council proceeding with the procurement exercise to the next appropriate bidder. Additional information pertaining to this contract notice is contained within the Tender documents. Applicants must ensure they read in line with this contract notice. Community Benefits are included.
(SC Ref:757532)
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Paisley Sheriff Court and Justice of the Peace
Paisley
PA3 2HW
UK
E-bost: paisley@scotcourts.gov.uk
VI.5) Dyddiad anfon yr hysbysiad hwn
07/02/2024