Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
GNI (UK) Limited
Scotland
Kirkcudbright
DG64TR
UK
Person cyswllt: Tender Admin
E-bost: Tenders@gasnetworks.ie
NUTS: UKM92
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.gasnetworks.ie
I.6) Prif weithgaredd
Cynhyrchu, cludo a dosbarthu nwy a gwres
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
21/105 - Brighouse Bay Station Splitting
Cyfeirnod: 21/105
II.1.2) Prif god CPV
45255300
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Brighouse Bay Compressor Station, in Southwest Scotland, contains two turbine halls, each containing three gas driven compressors. Upstream of the turbine halls is a shared header and filtration system and downstream of the turbine halls are outlets to Interconnector 1( IC1)and Interconnector 2 (IC2) and pipework interconnecting the ICs. This project entails the addition of a new filter and a number of valves and pipework modifications to effectively split the station's operational configuration and thus facilitate independent operation of the halls.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45210000
45231220
45250000
45260000
45300000
45400000
45500000
48000000
50000000
51000000
55000000
60000000
63000000
64000000
65000000
66000000
70000000
71000000
72000000
73000000
75000000
76000000
77000000
79000000
II.2.3) Man cyflawni
Cod NUTS:
UKM
Prif safle neu fan cyflawni:
Brighouse Bay Compressor station
II.2.4) Disgrifiad o’r caffaeliad
Brighouse Bay Compressor Station, in Southwest Scotland, contains two turbine halls, each containing three gas driven compressors. Upstream of the turbine halls is a shared header and filtration system and downstream of the turbine halls are outlets to Interconnector 1( IC1)and Interconnector 2 (IC2) and pipework interconnecting the ICs. This project entails the addition of a new filter and a number of valves and pipework modifications to effectively split the station's operational configuration and thus facilitate independent operation of the halls.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
You must submit through the eTenders system before the deadline. The system will automatically lockdown at the exact time specified in the PQQ documents. Tenders that are not fully uploaded by the response deadline will not be accepted by the system.
Please submit via the eTenders system not later than 12:00hrs local time on Tue 03rd May22.Help Guides: www.etenders.gov.ie/system-user-guides
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2022/S 000-008699
Section V: Dyfarnu contract
Rhif Contract: 1
Teitl: 21/105 - Brighouse Bay Station Splitting
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
01/12/2023
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 1
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Murphy International Limited
Great Connell, Newbridge
Co. Kildare
IE
NUTS: IE
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot: 8 702 021.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
You must submit through the eTenders system before the deadline. It is very important that you commence the scanning and uploading of your response in a timely manner. The system will automatically lockdown at the exact time specified in the PQQ documents. Tenders that are not fully uploaded by the response deadline will not be accepted by the system.
Please submit via the eTenders system not later than 12:00hrs (local time) on Tuesday 03rd May 2022.
Help Guides:
www.etenders.gov.ie/system-user-guides
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court
High Court Central Office, Four Courts, Inns Quay
Dublin
IE
Ffôn: +353 18886000
E-bost: highcourtcentraloffice@courts.ie
Cyfeiriad(au) rhyngrwyd
URL: http://www.courts.ie
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
Precise information on deadline(s) for review procedures:
Please refer to Statutory Instrument 131 of 2010, European Communities (Award of Contracts by Utility Undertaking) (Review Procedures) Regulations 2010 (and in particular Regulation 7 and 10(2)).
VI.5) Dyddiad anfon yr hysbysiad hwn
16/02/2024