Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Dyfarnu Contract

Tender for the Supply and Installation of AV Equipment for the Elgar Concert Hall at the University of Birmingham

  • Cyhoeddwyd gyntaf: 22 Chwefror 2024
  • Wedi'i addasu ddiwethaf: 22 Chwefror 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-03edec
Cyhoeddwyd gan:
The University of Birmingham
ID Awudurdod:
AA77971
Dyddiad cyhoeddi:
22 Chwefror 2024
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Audio Visual is a key component in delivering good teaching and operations at the University

of Birmingham. The University has a strong in-house Audio-Visual team that sets design

standards applicable throughout the institution, handles most design and sign-off tasks,

provides professional advice, and maintains a large collection of over 350 spaces.

The University requires a supplier of Audio-Visual kit who can provide an upgrade for the

existing equipment installed within the Elgar Concert Hall.

The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an

extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened

its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)

designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony

Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further

information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx

The concert hall and its acoustics can be configured for rehearsals and performances ranging

from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector

video and music-theatre presentations, and the electroacoustic studios' 100-channel sound

diffusion system.

New requirements for the upgrade will need to be compatible with existing equipment within

the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and

installation or configuration will take place during the University's Christmas closed period,

to ensure teaching is not affected.

For the PA System, the University currently owns a stock of various D&B Audiotechnik

speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for

front/side/foldback fills as required, and a small stock of monitor wedges (M6).

Any system design will need to integrate with the above existing equipment.

Equipment will need to be delivered, received, and installed by no later than 14th January

2024.

Testun llawn y rhybydd

Hysbysiad dyfarnu contract

Canlyniadau'r weithdrefn gaffael

Adran I: Endid contractio

I.1) Enw a chyfeiriad

THE UNIVERSITY OF BIRMINGHAM

RC000645

Edgbaston

BIRMINGHAM

B152TT

UK

Person cyswllt: Graham Price

E-bost: g.a.price@bham.ac.uk

NUTS: UKG31

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://intranet.birmingham.ac.uk/index.aspx

I.4) Y math o awdurdod contractio

Corff a lywodraethir gan gyfraith gyhoeddus

I.5) Prif weithgaredd

Addysg

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Tender for the Supply and Installation of AV Equipment for the Elgar Concert Hall at the University of Birmingham

II.1.2) Prif god CPV

32321200

 

II.1.3) Y math o gontract

Cyflenwadau

II.1.4) Disgrifiad byr

The University would like to establish a contract for the supply and installation of an

equipment upgrade within the Elgar Concert Hall.

The University's procurement will consist of three Lots as detailed below, and at its

discretion will award a contract to a single supplier for all Lots, or a different supplier for

each of the Lots:

• Lot 1 - PA System

• Lot 2 - Mixing Console & Stage Boxes

• Lot 3 - Lighting Systems

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Ydy

II.1.7) Cyfanswm gwerth y caffaeliad

Gwerth heb gynnwys TAW: 323 346.04 GBP

II.2) Disgrifiad

Rhif y Lot 1

II.2.1) Teitl

PA System

II.2.2) Cod(au) CPV ychwanegol

32321200

II.2.3) Man cyflawni

Cod NUTS:

UKG31

II.2.4) Disgrifiad o’r caffaeliad

Audio Visual is a key component in delivering good teaching and operations at the University

of Birmingham. The University has a strong in-house Audio-Visual team that sets design

standards applicable throughout the institution, handles most design and sign-off tasks,

provides professional advice, and maintains a large collection of over 350 spaces.

The University requires a supplier of Audio-Visual kit who can provide an upgrade for the

existing equipment installed within the Elgar Concert Hall.

The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an

extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened

its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)

designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony

Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further

information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx

The concert hall and its acoustics can be configured for rehearsals and performances ranging

from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector

video and music-theatre presentations, and the electroacoustic studios' 100-channel sound

diffusion system.

New requirements for the upgrade will need to be compatible with existing equipment within

the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and

installation or configuration will take place during the University's Christmas closed period,

to ensure teaching is not affected.

For the PA System, the University currently owns a stock of various D&B Audiotechnik

speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for

front/side/foldback fills as required, and a small stock of monitor wedges (M6).

Any system design will need to integrate with the above existing equipment.

Equipment will need to be delivered, received, and installed by no later than 14th January

2024.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Compliance to the Specification / Pwysoliad: 20

Maes prawf ansawdd: Aftersales and Technical Back-up / Pwysoliad: 20

Maes prawf ansawdd: Delivery, installation, and Training / Pwysoliad: 15

Maes prawf ansawdd: Sustainability and Environmental / Pwysoliad: 5

Maes prawf ansawdd: Standard Supplier Questionnaire / Pwysoliad: 10

Price / Pwysoliad:  30

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Rhif y Lot 2

II.2.1) Teitl

Mixing Console & Stage Boxes

II.2.2) Cod(au) CPV ychwanegol

32342420

II.2.3) Man cyflawni

Cod NUTS:

UKG31

II.2.4) Disgrifiad o’r caffaeliad

Audio Visual is a key component in delivering good teaching and operations at the University

of Birmingham. The University has a strong in-house Audio-Visual team that sets design

standards applicable throughout the institution, handles most design and sign-off tasks,

provides professional advice, and maintains a large collection of over 350 spaces.

The University requires a supplier of Audio-Visual kit who can provide an upgrade for the

existing equipment installed within the Elgar Concert Hall.

The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an

extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened

its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)

designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony

Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx

The concert hall and its acoustics can be configured for rehearsals and performances ranging

from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector

video and music-theatre presentations, and the electroacoustic studios' 100-channel sound

diffusion system.

New requirements for the upgrade will need to be compatible with existing equipment within

the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and

installation or configuration will take place during the University's Christmas closed period,

to ensure teaching is not affected.

The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via

Dante.

We require any console supplied to be compatible with the existing equipment.

Equipment will need to be delivered, received, and installed by no later than 14th January

2024.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Compliance to the Specification / Pwysoliad: 20

Maes prawf ansawdd: Aftersales and Technical Back-up / Pwysoliad: 20

Maes prawf ansawdd: Delivery, Installation and Training / Pwysoliad: 15

Maes prawf ansawdd: Sustainability and Environmental / Pwysoliad: 5

Maes prawf ansawdd: Standard Supplier Questionnaire / Pwysoliad: 10

Price / Pwysoliad:  30

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Rhif y Lot 3

II.2.1) Teitl

Lighting System

II.2.2) Cod(au) CPV ychwanegol

31527260

II.2.3) Man cyflawni

Cod NUTS:

UKG31

II.2.4) Disgrifiad o’r caffaeliad

Audio Visual is a key component in delivering good teaching and operations at the University

of Birmingham. The University has a strong in-house Audio-Visual team that sets design

standards applicable throughout the institution, handles most design and sign-off tasks,

provides professional advice, and maintains a large collection of over 350 spaces.

The University requires a supplier of Audio-Visual kit who can provide an upgrade for the

existing equipment installed within the Elgar Concert Hall.

The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened

its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)

designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony

Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further

information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx

The concert hall and its acoustics can be configured for rehearsals and performances ranging

from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector

video and music-theatre presentations, and the electroacoustic studios' 100-channel sound

diffusion system.

New requirements for the upgrade will need to be compatible with existing equipment within

the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and

installation or configuration will take place during the University's Christmas closed period,

to ensure teaching is not affected.

The profile fixtures which the University currently owns are ETC Source 4's, and any

replacement fixtures supplied must retain compatibility with our current lens stock.

Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall

as compatibility with our current stage and control room panels may or may not be possible

depending on the solutions offered.

Equipment will need to be delivered, received, and installed by no later than 14th January

2024.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Compliance to the Specification / Pwysoliad: 20

Maes prawf ansawdd: Aftersales and Technical Back-up / Pwysoliad: 20

Maes prawf ansawdd: Delivery, Installation and Training / Pwysoliad: 15

Maes prawf ansawdd: Sustainability and Environmental / Pwysoliad: 5

Maes prawf ansawdd: Standard Supplier Questionnaire / Pwysoliad: 10

Price / Pwysoliad:  30

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2023/S 000-023084

Section V: Dyfarnu contract

Rhif y Lot: 1 and 3

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

29/11/2023

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 6

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

SOUTHBY PRODUCTIONS LLP

OC383379

High Wycombe

UK

NUTS: UKI7

BBaCh yw’r contractwr: Ydy

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 323 346.04 GBP

Cyfanswm gwerth y contract/lot: 323 346.04 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

University of Birmingham

Edgbaston

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

21/02/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
32342420 Consol cymysgu ar gyfer stiwdio Uchelseinyddion
32321200 Deunyddiau clyweledol Cyfarpar taflunio teledu
31527260 Systemau goleuo Sbotoleuadau

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
g.a.price@bham.ac.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.