II.2.2) Cod(au) CPV ychwanegol
60210000
II.2.3) Man cyflawni
Cod NUTS:
UKG33
Prif safle neu fan cyflawni:
Coventry
II.2.4) Disgrifiad o’r caffaeliad
The Council are developing the innovative CVLR project. This seeks to introduce a low-cost
urban light rail system into the heart of Coventry.
The primary objective of the Coventry Very Light Rail Project is to create an affordable integrated transport system that comprises a lightweight low-cost vehicle and innovative
trackform. The low cost means it can be implemented at scale, thereby driving significant
mode shift to a low carbon mode, with an ambition to achieve zero carbon ultimately by using renewable energy to power the system.
A full CVLR network is envisaged in the future but to allow this to be managed in a safe and
effective manner, the first stage will be a CVLR Live Environment Construction Testing
(LECT) route.
CVLR LECT will be operational for a four (4) week period from Monday 19 May 2025 through Sunday 15 June 2025. The vehicle will be transferred to Coventry on Monday 19 May 2025.
The awarded Operator will be required to perform some pre-work such as creation of Safety
Management System ("SMS") and driver training.
A vehicle operator is required to operate the CVLR vehicle through the period outlined
above. A concept of operations (ConOps) has been developed and outlines how Coventry
Very Light Rail (CVLR) Live Test Environment Construction Testing (LECT) is expected to be
operated under normal, degraded and emergency scenarios.
The Council published a Prior Information Notice (reference 2024/S 000-040263) on 13 December 2024, utilising Regulation 27(4) of the Public Contracts Regulations 2015 (as
amended) to reduce the tender period to 15 days.
Coventry City Council conducts all of its tendering exercises on its e-procurement portal,
www.csw-jets.co.uk. Interested Operators should register with www.csw-jets.co.uk to access the tender documentation
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 4
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
The Council published a Prior Information Notice (reference 2024/S 000-040263) on 13 December 2024, utilising Regulation 27(4) of the Public Contracts Regulations 2015 (as
amended) to reduce the tender period to 15 days.