Dyfarnu Contract

Scotland's Railway Slabtrack Repair & Maintenance Framework

  • Cyhoeddwyd gyntaf: 10 Chwefror 2026
  • Wedi'i addasu ddiwethaf: 10 Chwefror 2026
  • Fersiwn: N/A
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Eicon Gwybodaeth

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
Cyhoeddwyd gan:
Network Rail Infrastructure Ltd
ID Awudurdod:
AA73642
Dyddiad cyhoeddi:
10 Chwefror 2026
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Scotland's Railway Slabtrack Repair & Maintenance Framework between Network Rail and one Contractor will deliver repair and maintenance works for the 18 miles of slabtrack across Scotland's Railway. The Contractor shall be required to respond to call outs within the below timescales:

Urgent Response: Attend within 24 hours of Instruction

Route Maintenance: Attend within 7 days of Instruction

Programmed: As stated in Contract Order

The framework encompasses a broad range of slabtrack-related tasks on and around the railway

infrastructure. Key activities include:

• General Slabtrack Works: All trades related to slabtrack, including track fixings and sub-structure work.

• Inspection and Assessment Support: Enabling works to facilitate inspections and assessments.

• Urgent Response: Capability to address urgent situations promptly and respond within 24 hours.

• Design Work: Involvement in design tasks as required.

• Logistical Support: Booking possessions, isolations, and road closures, as well as managing materials stockholding and transportation.

• Surveys and Testing: Conducting surveys and laboratory testing as needed.

• Inspection and Testing: Conduct suitable inspection and testing of works in line with railway

standards.

The framework shall have no committed spend however, it is estimated that there shall be approximately £30 million (including options and headroom) worth of works awarded via this contract over the lifespan of the framework.

Testun llawn y rhybydd

Hysbysiad dyfarnu contract – cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Network Rail Infrastructure Ltd

Waterloo General Offices

London

SE1 8SW

UK

Person cyswllt: Jodie Ross

Ffôn: +44 1908781000

E-bost: jodie.ross@networkrail.co.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.networkrail.co.uk

I.6) Prif weithgaredd

Gwasanaethau rheilffyrdd

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Scotland's Railway Slabtrack Repair & Maintenance Framework

Cyfeirnod: SCOT/24-25/038

II.1.2) Prif god CPV

45234100

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

Scotland's Railway Slabtrack Repair & Maintenance Framework between Network Rail and one Contractor will deliver repair and maintenance works for the 18 miles of slabtrack across Scotland's Railway. The Contractor shall be required to respond to call outs within the below timescales:

Urgent Response: Attend within 24 hours of Instruction

Route Maintenance: Attend within 7 days of Instruction

Programmed: As stated in Contract Order

The framework encompasses a broad range of slabtrack-related tasks on and around the railway

infrastructure. Key activities include:

• General Slabtrack Works: All trades related to slabtrack, including track fixings and sub-structure work.

• Inspection and Assessment Support: Enabling works to facilitate inspections and assessments.

• Urgent Response: Capability to address urgent situations promptly and respond within 24 hours.

• Design Work: Involvement in design tasks as required.

• Logistical Support: Booking possessions, isolations, and road closures, as well as managing materials stockholding and transportation.

• Surveys and Testing: Conducting surveys and laboratory testing as needed.

• Inspection and Testing: Conduct suitable inspection and testing of works in line with railway

standards.

The framework shall have no committed spend however, it is estimated that there shall be approximately £30 million (including options and headroom) worth of works awarded via this contract over the lifespan of the framework.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Gwerth heb gynnwys TAW: 30 000 000.00 GBP

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UKM

II.2.4) Disgrifiad o’r caffaeliad

Procurement of a framework to carry out repair and maintenance works of Network Rail's slabtrack asset across Scotland.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Technical & Resource / Pwysoliad: 30

Maes prawf ansawdd: Safety / Pwysoliad: 20

Maes prawf ansawdd: Sustainability & Social Value / Pwysoliad: 10

Maen prawf cost: Schedule of Rates / Pwysoliad: 40

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Ydy

Disgrifiad o’r opsiynau:

This Framework Agreement may be extended for an additional 2 years with 2 No. 1 Year options at Network Rail's sole discretion. Maximum duration of 6 years (4+1+1).

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.3) Gwybodaeth am gytundeb fframwaith neu system brynu ddynamig

Mae'r broses gaffael yn golygu sefydlu cytundeb fframwaith gydag un gweithredwr.

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2021/S 000-010923

Section V: Dyfarnu contract

Rhif Contract: SCOT/24-25/038

Teitl: Scotland's Railway Slabtrack Repair & Maintenance Framework

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

21/01/2026

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 2

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

Aureos Rail Limited

London

UK

NUTS: UKI

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cyfanswm gwerth y contract/lot: 30 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

Court of Session

Edinburgh

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

09/02/2026

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45234100 Gwaith adeiladu rheilffyrdd Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
jodie.ross@networkrail.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.