II.2.2) Cod(au) CPV ychwanegol
31200000
II.2.3) Man cyflawni
Cod NUTS:
UK
UKM66
Prif safle neu fan cyflawni:
Lerwick Power Station, Shetland Isles.
II.2.4) Disgrifiad o’r caffaeliad
SHEPD is seeking to tender for the design, supply, associated civil works, installation and commissioning of a new 8MW, 6MWh Battery Energy Storage System (BESS).
The BESS will be used primarily as a UPS, responding to under-frequency events following a loss of generation. The BESS must be capable of operating islanded and performing a black start if required.
Location:
Lerwick Power Station, Gremista, Lerwick, Shetland, UK, ZE1 0PS
BESS Design:
Minimum BESS size shall be 8MW, 6MWh.
Minimum warranty period shall be 10 years.
Expected battery technology is Lithium Ion.
Frequency responsive.
Capable of Islanded operation.
Capable of black start.
Output Voltage is 11 000V.
System Frequency is 50Hz.
Further details are provided in the documents available at http://sse.com/potential-suppliers/
II.2.5) Meini prawf dyfarnu
Maen prawf isod:
Maes prawf ansawdd: Health, safety and environment
/ Pwysoliad: 25
Maes prawf ansawdd: Quality
/ Pwysoliad: 15
Maes prawf ansawdd: Project management
/ Pwysoliad: 10
Maes prawf ansawdd: Technical
/ Pwysoliad: 40
Maes prawf ansawdd: Procurement
/ Pwysoliad: 10
Maes prawf ansawdd: Finance and data protection (information only)
/ Pwysoliad: 0
Price
/ Pwysoliad:
70
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 7 195 000.00 EUR
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Dechrau:
01/04/2019
Diwedd:
31/12/2019
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Yr isafswm nifer a ragwelir: 3
Nifer uchaf a ragwelir: 8
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na