Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Dyfarnu Contract

RBGKEW1056 ICW Building Services Engineer (M&E) Framework

  • Cyhoeddwyd gyntaf: 06 Ionawr 2023
  • Wedi'i addasu ddiwethaf: 06 Ionawr 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-0329bf
Cyhoeddwyd gan:
Board of Trustees of the Royal Botanic Gardens Kew
ID Awudurdod:
AA82764
Dyddiad cyhoeddi:
06 Ionawr 2023
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Though considerable improvements have been made in the last few years, Kew currently has a significant defect liability that requires action. The extent of the backlog and a method of identifying the most urgent works was drawn-up in 2018 via the completion of a site wide elemental condition survey and risk assessment. This piece of work of has been built-on and aligned with Kew's Sustainability and Energy Plans, which are targeting a carbon positive estate by 2030, to create a new five-year programme of work across the two estates.

This programme consists of infrastructure improvement, refurbishment, and conservation projects. Though not all the projects within the programme relate to listed or protected assets, conservation knowledge and design experience is required to ensure the projects are developed in a sensitive way, respectful of Kew's status as a world Heritage Site. Example projects include (note these are example projects and there is no guarantee they will be taken forward):

Conservation of the Ruined Arch.

Refurbishment and Conservation of the Orangery.

Rationalisation of the Brentford Gate Car Park and Improvement of Visitor Arrival.

Design and Implementation of a Sustainable Irrigation System.

Conservation of the Minka House and Japanese Gateway.

Refurbishment and Development of Residential Properties.

Various Re-roofing projects across the Estates.

Building Services Engineering (M&E) support is now required to help develop, design and deliver projects within the programme.

Testun llawn y rhybydd

Hysbysiad dyfarnu contract

Canlyniadau'r weithdrefn gaffael

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Board of Trustees of the Royal Botanic Gardens Kew

Kew Green

RICHMOND

TW93AB

UK

E-bost: procurement@kew.org

NUTS: UKI75

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.kew.org

I.4) Y math o awdurdod contractio

Gweinyddiaeth neu unrhyw awdurdod cenedlaethol neu ffederal arall, gan gynnwys eu his-adrannau rhanbarthol neu leol

I.5) Prif weithgaredd

Yr Amgylchedd

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

RBGKEW1056 ICW Building Services Engineer (M&E) Framework

Cyfeirnod: RBGKEW1056

II.1.2) Prif god CPV

45000000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

The Board of Trustees of the Royal Botanic Gardens ("RBGKEW") wishes to establish a framework to undertake Building Services Engineer (M&E) support required to help develop, design and deliver projects within its programme of projects.

Background / Expected projects & Developments

Though considerable improvements have been made in the last few years, RBG Kew currently has a significant defect liability that requires action. The extent of the backlog and a method of identifying the most urgent works was drawn up in 2018 via the completion of a site wide elemental condition survey and risk assessment. This piece of work of has been built-on and aligned with Kew's Sustainability and Energy Plans, which are targeting a carbon positive estate by 2030, to create a new five-year programme of work across the two estates.

This programme consists of infrastructure improvement, refurbishment, and conservation projects. Though not all the projects within the programme relate to listed or protected assets, conservation knowledge and design experience is required to ensure the projects are developed in a sensitive way, respectful of Kew's status as a world Heritage Site.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Cynnig isaf: 1 000 000.00 GBP / Y cynnig uchaf: 4 000 000.00 GBP

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

71530000

II.2.3) Man cyflawni

Cod NUTS:

UKI

II.2.4) Disgrifiad o’r caffaeliad

Though considerable improvements have been made in the last few years, Kew currently has a significant defect liability that requires action. The extent of the backlog and a method of identifying the most urgent works was drawn-up in 2018 via the completion of a site wide elemental condition survey and risk assessment. This piece of work of has been built-on and aligned with Kew's Sustainability and Energy Plans, which are targeting a carbon positive estate by 2030, to create a new five-year programme of work across the two estates.

This programme consists of infrastructure improvement, refurbishment, and conservation projects. Though not all the projects within the programme relate to listed or protected assets, conservation knowledge and design experience is required to ensure the projects are developed in a sensitive way, respectful of Kew's status as a world Heritage Site. Example projects include (note these are example projects and there is no guarantee they will be taken forward):

Conservation of the Ruined Arch.

Refurbishment and Conservation of the Orangery.

Rationalisation of the Brentford Gate Car Park and Improvement of Visitor Arrival.

Design and Implementation of a Sustainable Irrigation System.

Conservation of the Minka House and Japanese Gateway.

Refurbishment and Development of Residential Properties.

Various Re-roofing projects across the Estates.

Building Services Engineering (M&E) support is now required to help develop, design and deliver projects within the programme.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Conservation Experience / Pwysoliad: 20

Maes prawf ansawdd: Project/refurbishment Experience / Pwysoliad: 10

Maes prawf ansawdd: Qualification & Experience of Team / Pwysoliad: 15

Maes prawf ansawdd: Decarbonisation / Pwysoliad: 10

Maes prawf ansawdd: Added Value / Pwysoliad: 5

Maen prawf cost: Lump Sum Assessment / Pwysoliad: 40

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn gyfyngedig

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2022/S 000-008996

Section V: Dyfarnu contract

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

07/06/2022

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 10

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

Martin Thomas Associates Ltd

04397912

Romsey

UK

NUTS: UKK

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cynnig isaf: 1 000 000.00 GBP / Y cynnig uchaf: 2 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section V: Dyfarnu contract

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

07/06/2022

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 10

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

Hoare Lea LLP

OC407254

Bristol

UK

NUTS: UKK

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cynnig isaf: 1 000 000.00 GBP / Y cynnig uchaf: 2 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section V: Dyfarnu contract

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

07/06/2022

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 10

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

Stantec UK Limited

01188070

London

UK

NUTS: UKI

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cynnig isaf: 1 000 000.00 GBP / Y cynnig uchaf: 2 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

To be confirmed

London

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

05/01/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
71530000 Gwasanaethau ymgynghori ar adeiladu Gwasanaethau goruchwylio safleoedd adeiladu

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
procurement@kew.org
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.