Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Portsmouth City Council
Civic Offices,Guildhall Square
PORTSMOUTH
PO1 2AL
UK
Person cyswllt: Procurement Service
Ffôn: +44 2392688235
E-bost: procurement@portsmouthcc.gov.uk
NUTS: UKJ31
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.portsmouth.gov.uk/ext/business/business.aspx
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://in-tendhost.co.uk/portsmouthcc/aspx/home
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://in-tendhost.co.uk/portsmouthcc/aspx/home
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
North Portsea Coastal Scheme - Phase 5: Ports Creek
II.1.2) Prif god CPV
45243000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Portsmouth City Council, 'the council', is inviting applications from suitably qualified applicants & contractors for the construction and delivery of a continuing major programme of coastal defence construction to deliver a flood and coastal erosion risk management (FCERM) scheme at Ports Creek, Portsmouth, UK; located to the north of Portsea Island (AKA 'Ports Creek').
Ports Creek is phase 5 of the North Portsea Coastal Scheme FCERM scheme. (see website for more details https://coastalpartners.org.uk/project/north-portsea-island-phase-5-ports-creek) which provides a 1 in 500-year standard of protection with a design life of 100 years.
The design consists of an earth bund with a rock armour toe. As this phase will be carried out in an area known for its green, open spaces, the secondary focus of this scheme will be enhancing the natural feel of the area by planting more trees and improving access along the frontage.
The location reference for the approximate centre of the works is '50.83606305284935, -1.0640957680322936'.
The estimated value for construction works is £22.3million.
It is envisaged that the form of contract used will be NEC4 Engineering and Construction Contract (ECC) Option C. The exact form of contract will be confirmed within the tender documents.
The site access and target construction commencement date for the works is 2nd September 2024 with a completion date of 31st August 2026, with the defects date 52 weeks after completion.
The procurement process will be in accordance with the Restricted Procedure as set out within the Public Contracts Regulations (2015).
Application is via completion of a Supplier Selection Questionnaire (SQ) and associated documentation which must be submitted by 26th February at 12:00 noon.
The council intends to invite the top 5 shortlisted contractors to submit a tender return.
The council is targeting an award contract date of 26th July 2024.
The council plans to run this procurement according to the following timetable:
• Issue Supplier Questionnaire - Thursday 25th January 2024
• SQ Clarification deadline - Friday 16th February 2024 at 23:59
• SQ returns - Monday 26th February 2024 at 12 noon
• Notify contractors of SQ results - Thursday 14th March 2024
• Issue Tender - Monday 25th March 2024
• Tender Clarification deadline - Monday 13th May 2024 at 23:59
• Tender returns - Friday 24th May 2024 at 12 noon
• Notify of award - Monday 15th July 2024
• Standstill Period - Monday 15th July - Thursday 25th July 2024
• Contract award - Friday 26th July 2024
• Site access - Monday 2nd September 2024
The deadline for clarifications is 16th February 2024 (23:59) and the deadline for submission of SQ submissions is 26th February at 12:00 noon via the Council's e-sourcing system InTend, which is accessible via: https://intendhost.co.uk/portsmouthcc/aspx/home
The system will be used to administrate the procurement process in its entirety, guidance documentation is available via the link above.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 22 300 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45111000
45112000
45113000
45233161
45240000
71420000
77200000
77300000
II.2.3) Man cyflawni
Cod NUTS:
UKJ31
Prif safle neu fan cyflawni:
Portsmouth - Ports Creek
II.2.4) Disgrifiad o’r caffaeliad
The proposed coastal defence works at Ports Creek involve the construction of an earth embankment with a rock revetement toe. It also includes consolidation and partial removal of existing defence structures and associated works. In some instances, redundant structures will be removed and appropriately reused or disposed of, to minimise foreshore encroachment, for the benefit of the wider environment. The current defences are made up of multiple structures, generally comprising of mass concrete filled oil drums along with dilapidated seawalls formed of mass concrete/block/masonry.
The main works take place between the eastern side of the Portsbridge Roundabout through to the Network Rail bridge. The works consist of constructing a sloping revetment with a raised earth embankment along most of the frontage.
Other ancillary works include: piling around an outfall, path construction, concrete works to an existing slipway and tying into Network Rail land and working to Network Rail constraints in this area. The Contractor will have to work with Network Rail and follow an agreed safe method of working when in the vicinity of the railway line bridge.
ECI
In line with industry practice the council's designer (Royal HaskoningDHV (RHDHV)) has sought and obtained early contractor involvement input from JT Mackley in order to inform aspects of design, work method, site establishment and management, programme & costings.
The council is satisfied that prior involvement of ECI contractor is compliant with the conditions set out within sub section 5 of Public Contract Regulation 2015. However, the council will provide summarised information concerning the ECI activities and associated outputs within the tender documents that will be issued to the short listed tenderers.
Core Scope of Works
In summary the works will generally consist of:
• Site mobilisation and set up
• Vegetation clearance (including mature trees) and site clearance and access ways
• Construction of earth embankments fronted with rock revetments for scour protection
• Installation of flex MSE retaining walls
• Improvements to existing slipway structure and encasement of existing bridge abutment
• Ensuring existing services are accommodated in the works (e.g outfalls)
• General reinstatement, with high specification public realm enhancements and landscaping
Due to the impact of the scheme, engagement with local businesses, leaseholders and the general public has been undertaken. To date the scheme has received a mostly positive response.
The project is subject to funding from the Environment Agency and there is currently a shortfall in respect of the current funding. However the council is working with the funder & is confident that funding required will be secured in principle prior to issue of the tender & fully secured prior to award of contract.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 22 300 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 35
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Nifer yr ymgeiswyr a ragwelir: 5
Meini prawf gwrthrychol ar gyfer dewis y nifer cyfyngedig o ymgeiswyr:
Refer to procurement documentation.
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
26/02/2024
Amser lleol: 12:00
IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd
Dyddiad:
25/03/2024
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court of Justice
The Strand
London
WCA 2LL
UK
Ffôn: +44 2079476000
VI.5) Dyddiad anfon yr hysbysiad hwn