Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
The City of Edinburgh Council
Waverley Court, 4 East Market Street
Edinburgh
EH8 8BG
UK
Person cyswllt: Callum Ewan
Ffôn: +44 1314693922
E-bost: callum.ewan@edinburgh.gov.uk
NUTS: UKM75
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.edinburgh.gov.uk
Cyfeiriad proffil y prynwr: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00290
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Portobello Swim Centre Upgrade
Cyfeirnod: CT1735
II.1.2) Prif god CPV
45262690
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
The City of Edinburgh Council is seeking market input in order to determine the best route to market for the refurbishment of Portobello Swim Centre. The building is A Listed. Project information is enclosed along with a short questionnaire for completion in January 2026.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 7 500 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45453100
II.2.3) Man cyflawni
Cod NUTS:
UKM75
II.2.4) Disgrifiad o’r caffaeliad
Portobello Swim Centre, first opened in 1898 and located three miles from Edinburgh City Centre, contains Edinburgh’s only publicly available Victorian Turkish bath (one of only three remaining in Scotland), along with two public swimming pools and a gym facility)
Key proposals include:
- Ground Floor: Relocation of the gym to the first floor; reinstatement of the original changing area to the west of the entrance; creation of a new studio space centrally located within the building; installation of additional poolside cubicles; and reconfiguration of circulation routes to enhance user flow.
- First Floor: Conversion of existing studio spaces into a new dual-aspect gym overlooking Portobello Beach and both swimming pools.
- Externally: Substantial repairs are planned for the roof and stonework, with emergency stonework repairs already undertaken in October 2025.
The outline MEP scope includes:
- Upgrades to switchgear, distribution systems, and general power
- Installation of new general and emergency lighting
- Coordination with specialists on fire detection, access control, data networks, and AV systems
II.2.14) Gwybodaeth ychwanegol
Please complete the enclosed short questionnaire if you are interested in the project to help determine an appropriate route to market
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
01/04/2026
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=819571.
(SC Ref:819571)
VI.5) Dyddiad anfon yr hysbysiad hwn
05/01/2026