Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Gontract

HR Performance System PMR

  • Cyhoeddwyd gyntaf: 19 Gorffennaf 2023
  • Wedi'i addasu ddiwethaf: 19 Gorffennaf 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-133347
Cyhoeddwyd gan:
Development Bank of Wales
ID Awudurdod:
AA0555
Dyddiad cyhoeddi:
19 Gorffennaf 2023
Dyddiad Cau:
21 Awst 2023
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

DBW is carrying out a procurement via Sell2Wales, under the Open Procedure of the Public Contracts Regulations 2015 to procure a PMR System. The system must be agile and flexible with the ability to grow with DBW’s increasing headcount and with the ability to adapt to the changing requirements of DBW. The system must provide the option for adding additional functionality in the future if required. All parts of the system must be fully configurable (including the ability to be configured to closely mirror existing system process and design at set-up). DBW administrators must have the ability to make changes and updates to all parts of the system going forward, including the process, system design and reports. The current PMR process involves two performance discussions between individuals and their line managers: a full end of year review held in April a half year review held in October Performance is measured and documented against SMART objectives and competencies (behaviours) and a performance grade is awarded to the employee at both the full year and half year process. A formal sign-off process is followed whereby both the employee and line manager must formally sign-off the performance review. Separate development reviews are also in place to identify strengths and areas for development as well as providing functionality to request training. Currently, one of the development reviews is mandatory and one is optional. A formal sign-off process is followed whereby both the employee and line manager must formally sign-off the performance review.

Testun llawn y rhybydd

HYSBYSIAD O GONTRACT - CENEDLAETHOL

SUPPLIES

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Development Bank of Wales

Procurement, 16 Darran Terrace, Ferndale,

FERNDALE

CF43 4LG

UK

Leanne Millard

+44 2920801715

leanne.millard@developmentbank.wales

http://developmentbank.wales
https://etenderwales.bravosolution.co.uk/home.html
https://etenderwales.bravosolution.co.uk/home.html

1.2

Cyfeiriad ar gyfer cael dogfennaeth


Development Bank of Wales

Procurement, Development Bank of Wales plc, Unit J, Yale Business Village, Ellis Way,

Wrexham

LL13 7Y

UK

Leanne Millard

+44 2920338100


+44 2920338101
http://developmentbank.wales

1.3

Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:


Development Bank of Wales

Procurement, Development Bank of Wales plc, Unit J, Yale Business Village, Ellis Way,

Wrexham

LL13 7Y

UK

Leanne Millard

+44 2920338100


+44 2920338101
http://developmentbank.wales

2 Manylion y Contract

2.1

Teitl

HR Performance System PMR

2.2

Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen

DBW is carrying out a procurement via Sell2Wales, under the Open Procedure of the Public Contracts Regulations 2015 to procure a PMR System. The system must be agile and flexible with the ability to grow with DBW’s increasing headcount and with the ability to adapt to the changing requirements of DBW. The system must provide the option for adding additional functionality in the future if required. All parts of the system must be fully configurable (including the ability to be configured to closely mirror existing system process and design at set-up). DBW administrators must have the ability to make changes and updates to all parts of the system going forward, including the process, system design and reports.

The current PMR process involves two performance discussions between individuals and their line managers:

a full end of year review held in April

a half year review held in October

Performance is measured and documented against SMART objectives and competencies (behaviours) and a performance grade is awarded to the employee at both the full year and half year process. A formal sign-off process is followed whereby both the employee and line manager must formally sign-off the performance review.

Separate development reviews are also in place to identify strengths and areas for development as well as providing functionality to request training. Currently, one of the development reviews is mandatory and one is optional. A formal sign-off process is followed whereby both the employee and line manager must formally sign-off the performance review.

NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=133347

2.3

Cod a Dosbarthiad yr Hysbysiad

72250000 System and support services
72260000 Software-related services
100 UK - All
1000 WALES
1010 West Wales and The Valleys
1011 Isle of Anglesey
1012 Gwynedd
1013 Conwy and Denbighshire
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1017 Bridgend and Neath Port Talbot
1018 Swansea
1020 East Wales
1021 Monmouthshire and Newport
1022 Cardiff and Vale of Glamorgan
1023 Flintshire and Wrexham
1024 Powys

2.4

Cyfanswm maint neu gwmpas y tendr

3 Amodau ar gyfer Cymryd Rhan

3.1

Safonau gofynnol a'r cymhwyster sydd ei angen

Please review the scope within the tender documents

4 Gwybodaeth Weinyddol

4.1

Math o Weithdrefn

Un cam

4.2

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

DBW00028.00

4.3

Terfynau Amser



Terfyn amser ar gyfer derbyn tendrau wedi'u cwblhau
     21 - 08 - 2023  Amser   12:00

Dyddiad dyfarnu amcangyfrifedig   29 - 09 - 2023

4.5

Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan

EN  

4.6

Blwch Postio Cyflwyno Tendrau

5 Gwybodaeth Arall

5.1

Gwybodaeth Ychwanegol

The Development Bank of Wales is a wholly owned subsidiary of the Welsh Government. Launched in 2017, the Development Bank’s purpose is to mobilise economic development in the Welsh market. As a cornerstone of Welsh Government’s organisation for delivery of financial instruments, the Development Bank’s mission is to unlock potential in the economy of Wales by increasing the provision of sustainable, effective finance. Up to 31st March 2020, the Development Bank had directly invested £0.7 billion into the Welsh economy and leveraged £0.9 billion from private sector investors.

The full scope and the key requirement's can be found via the etenderwales platform https://etenderwales.bravosolution.co.uk/home.html

(WA Ref:133347)

5.2

Dogfennaeth Ychwanegol

5.3

Dyddiad cyhoeddi'r hysbysiad hwn

  19 - 07 - 2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
72260000 Gwasanaethau sy’n gysylltiedig â meddalwedd Gwasanaethu rhaglennu meddalwedd ac ymgynghori ar feddalwedd
72250000 Gwasanaethau system a chymorth Gwasanaethu rhaglennu meddalwedd ac ymgynghori ar feddalwedd

Lleoliadau Dosbarthu

ID Disgrifiad
1018 Abertawe
1022 Caerdydd a Bro Morgannwg
1013 Conwy a Sir Ddinbych
1015 Cymoedd Canalog (Merthyr Tudful, Rhondda Cynon Taf)
1016 Cymoedd Gwent (Torfaen, Blaenau Gwent, Caerffili)
1000 CYMRU
1014 De-orllewin Cymru (Sir Gaerfyrddin, Sir Benfro, Ceredigion)
100 DU - I gyd
1020 Dwyrain Cymru
1010 Gorllewin Cymru a'r Cymoedd
1012 Gwynedd
1017 Pen-y-bont ar Ogwr a Castell-Nedd Port Talbot
1024 Powys
1021 Sir Fynwy a Chasnewydd
1023 Sir y Fflint a Wrecsam
1011 Ynys Môn

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
leanne.millard@developmentbank.wales
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.