Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Guildford Borough Council
Guildford Borough Council Guildford Borough Council Millmead House, Millmead Guildford Guildford
GU2 4BB
UK
Person cyswllt: Gavin Seabourne-Pugh
E-bost: gavin.seabourne-pugh@guildford.gov.uk
NUTS: UKJ25
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.guildford.gov.uk
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
http://www.sesharedservices.org.uk/esourcing
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
http://www.sesharedservices.org.uk/esourcing
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
I.4) Y math o awdurdod contractio
Asiantaeth/swyddfa ranbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
GBC - Weyside Urban Village - Off Site Highways
Cyfeirnod: GBC - 036573
II.1.2) Prif god CPV
45233000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Weyside Urban Village is an exciting regeneration project that will bring new homes, industrial uses, and community facilities to Guildford. By building on brownfield land (previously used land) the site protects the Green Belt surrounding the borough.The delivery of approximately 1,500 high-quality homes will play a crucial role in helping to meet Guildford’s housing need. The scheme provides new state of the art infrastructure including a new sewage treatment plant and a new council depot, to be relocated from their existing locations to near locations within the Slyfield Industrial Estate.The off-site highways works programme is principally required to mitigate the traffic impacts associated with the Weyside Urban Village development, as well as improve the surrounding pedestrian, cyclist and bus networks to encourage and enable greater sustainable travel.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 15 000 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45233000
II.2.3) Man cyflawni
Cod NUTS:
UKJ25
Prif safle neu fan cyflawni:
II.2.4) Disgrifiad o’r caffaeliad
Weyside Urban Village is an exciting regeneration project that will bring new homes, industrial uses, and community facilities to Guildford. By building on brownfield land (previously used land) the site protects the Green Belt surrounding the borough.The delivery of approximately 1,500 high-quality homes will play a crucial role in helping to meet Guildford’s housing need. The scheme provides new state of the art infrastructure including a new sewage treatment plant and a new council depot, to be relocated from their existing locations to near locations within the Slyfield Industrial Estate.As part of this development a new local centre is being created which include:• Up to 1800 sqm of retail space (including a convenience store).• Healthcare and community facilities• A nursery• Flexible employment uses, such as offices and workshopIn addition, new industrial uses are being developed in an extension to the Slyfield Industrial Estate.Outline planning consent for the masterplan was granted in March 2022, under the application reference 20/P/02155.The off-site highways works programme is principally required to mitigate the traffic impacts associated with the Weyside Urban Village development, as well as improve the surrounding pedestrian, cyclist and bus networks to encourage and enable greater sustainable travel. This is a requirement to enable to delivery of the site, as per the National Planning Policy Framework and the granted Outline Planning Permission.• A summary of the reasons for these works are below:• Highway improvements on the A320 to maintain traffic capacities.• Enabling implementation of the County’s Sustainable Movement Corridor (SMC) 5.• Introduction of bus priority measures designed to enhance bus reliability / performance and make this mode a more attractive option.• Rationalisation of parking and greening up (as much as possible) of the access corridors on Woodlands Road / Slyfield Green and Bellfields Road.• A network of cycle and footway facilities to encourage greater active travel.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 15 000 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 33
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Meini prawf gwrthrychol ar gyfer dewis y nifer cyfyngedig o ymgeiswyr:
Please see procurement documentation
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol
III.1) Amodau ar gyfer cymryd rhan
III.1.1) Addasrwydd i ymgymryd â’r gweithgaredd proffesiynol, gan gynnwys gofynion mewn perthynas â chofrestru ar gofrestri proffesiynol neu gofrestri masnach
Rhestr a disgrifiad byr o’r amodau:
III.1.2) Statws economaidd ac ariannol
Meini prawf dethol fel y’u nodir yn y dogfennau caffael
III.1.3) Gallu technegol a phroffesiynol
Meini prawf dethol fel y’u nodir yn y dogfennau caffael
III.2) Amodau sy’n gysylltiedig â’r contract
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gystadleuol gyda negodi
IV.1.5) Gwybodaeth am negodi
Ceidw’r awdurdod contractio yr hawl i ddyfarnu’r contract ar sail y tendrau gwreiddiol heb gynnal negodiadau
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-008404
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
21/08/2023
Amser lleol: 12:00
IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd
Dyddiad:
04/09/2023
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr
Hyd mewn misoedd: 6 (o’r dyddiad a nodwyd i dendr ddod i law)
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Royal Courts of Justice
Strand
London
WC2A 2LL
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
VI.5) Dyddiad anfon yr hysbysiad hwn
18/07/2023