Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Herefordshire Council
Council Offices, Plough Lane
Hereford
HR4 0LE
UK
Person cyswllt: Mrs Carrie Christopher
Ffôn: +44 1432383565
E-bost: carrie.christopher@herefordshire.gov.uk
NUTS: UKG11
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.herefordshire.gov.uk
Cyfeiriad proffil y prynwr: https://www.herefordshire.gov.uk
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Invitation to Tender for the construction of the Hereford Railway Station Transport Hub
Cyfeirnod: DN748221
II.1.2) Prif god CPV
45100000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
The tender was in relation to the development of the “Hereford Transport Hub” which included some contractor design portions and construction.
The Transport Hub will be an integrated modern public transport interchange in the forecourt area of Hereford Railway Station. The Transport Hub will enable passengers to switch easily between different modes of transport.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 9 614 960.51 GBP
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45200000
71200000
II.2.3) Man cyflawni
Cod NUTS:
UKG11
II.2.4) Disgrifiad o’r caffaeliad
The tender relates to the construction of the Hereford Railway Station Transport Hub.
The Transport Hub will be an integrated modern public transport interchange in the forecourt area of Hereford Railway Station. The Transport Hub will enable passengers to switch easily between different modes of transport.
The Council has established this capital project to enhance the transport interchange in and around the station quarter, known as Hereford City Transport Hub (HCTH).
The scope of works includes incorporation of new public realm, bus canopy shelter with internal waiting area, highways and civils works on the main project site, bus layover facilities on the old Network Rail depot site and national car park reconfiguration on the APCOA managed carpark site.
The scope of works also includes demolition of the depot buildings on the Network Rail depot site to the north of the station building as well as general levelling and site clearance of both the main site and the Network Rail depot site.
The procurement was undertaken in accordance with the Open Procedure under PCR2015.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Quality
/ Pwysoliad: 48
Maes prawf ansawdd: Social Value
/ Pwysoliad: 12
Price
/ Pwysoliad:
40
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2024/S 000-033657
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
13/06/2025
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 2
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
McPhillips (Wellington) Limited
Horton House, Hontonwood 50
Telford
TF1 7FG
UK
NUTS: UKG11
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cyfanswm gwerth y contract/lot: 9 614 960.51 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Herefordshire Council
Plough Lane
Hereford
HR4 OLE
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
11/07/2025