Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
North Lanarkshire Council
Civic Centre, Windmillhill Street
Motherwell
ML1 1AB
UK
Ffôn: +44 1698403200
E-bost: contractstrategy@northlan.gov.uk
NUTS: UKM84
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.northlanarkshire.gov.uk
Cyfeiriad proffil y prynwr: www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00010
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
www.publictendersscotland.publiccontractsscotland.gov.uk
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
www.publictendersscotland.publiccontractsscotland.gov.uk
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Blackburn Construction Homes Works
Cyfeirnod: NLC-SLP-25-079
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
North Lanarkshire Council are seeking a suitable contractor to carry out various works to upgrade Blackburn non-traditional construction type homes.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 7 200 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45259300
45261900
45261920
45320000
45321000
45210000
45260000
45262700
45300000
II.2.3) Man cyflawni
Cod NUTS:
UKM84
Prif safle neu fan cyflawni:
Wishaw, North Lanarkshire
II.2.4) Disgrifiad o’r caffaeliad
The Council plans work to these assets to improve their overall condition and is seeking a main contractor to:
Upgrade external walls (including dormers)
Upgrade thermal properties of the entire roof to achieve u-value of 0.11 W/m²K - where possible
Replace all existing doors/windows with new UPVC style, to achieve u-value of 0.85 W/m²K
Provide design option for Mechanical ventilation to reduce mould and moisture with an option for heat recovery to comply with current building standards.
Provide recommendations for potential partial electrical upgrade or full rewire.
Provide recommendations for Solar PV Panels
Repositioning of all existing flues
Introduction of door canopies with appropriate lighting
II.2.5) Meini prawf dyfarnu
Maen prawf isod:
Maes prawf ansawdd: Quality
/ Pwysoliad: 40
Price
/ Pwysoliad:
60
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 18
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Nifer yr ymgeiswyr a ragwelir: 5
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
Where the scope has asked for options, recommendations or design, NLC reserves the right to award any works package that made be required to the successful contractor.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol
III.1) Amodau ar gyfer cymryd rhan
III.1.2) Statws economaidd ac ariannol
Rhestr a disgrifiad byr o’r meini prawf dethol:
Turnover
Financial Ratios
Insurance
Lefel(au) gofynnol y safonau sydd eu hangen:
Requirement - General/Average yearly turnover.
Number of financial years: previous financial year (latest audited accounts)
Minimum required turnover per year: 1.5 (one and a half) times the estimated value of the contract.
Bidders are required to meet the minimum threshold in any two of the following three financial ratios:
Acid Test Ratio
Formula: (Current Assets – Stock) ÷ Current Liabilities
Requirement: A ratio greater than 1.
Return on Capital Employed (ROCE)
Formula: Profit ÷ Capital Employed
Requirement: A positive percentage.
Debt Ratio
Formula :Total Liabilities/Total Assets
Requirement : Debt Ratio financial ratio of 0.50 and below.
Bidders must calculate and submit these ratios based on their recent audited annual accounts. Each submission must clearly show the calculations used to derive the ratios.
NLC reserve the right to seek clarification around mitigating circumstances should any candidate fail to meet the above threshold.
The bidder confirms they already have or can commit to obtain, prior to the commencement of the contract, the levels of insurance cover indicated below:
Professional Risk Indemnity: GBP2m in the aggregate
Employer's (Compulsory) Liability: GBP5m minimum any one claim
Public Liability: GBP10m minimum any one claim
Product Liability: GBP10m minimum any one claim
III.1.3) Gallu technegol a phroffesiynol
Meini prawf dethol fel y’u nodir yn y dogfennau caffael
III.2) Amodau sy’n gysylltiedig â’r contract
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
17/08/2026
Amser lleol: 12:00
IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd
Dyddiad:
30/09/2026
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr
Hyd mewn misoedd: 6 (o’r dyddiad a nodwyd i dendr ddod i law)
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.2) Gwybodaeth am lifau gwaith electronig
Defnyddir archebion electronig
Derbynnir anfonebau electronig
Defnyddir taliadau electronig
VI.3) Gwybodaeth ychwanegol
Terms of contract will be Standard Building Contract With Quantities for use in Scotland (SBC/Q/Scot) 2016 Edition issued by the Scottish Building Contract Committee.
Full scope of requirements will be issued at stage 2
Scots Law will apply to this contract.
Economic Operators may be excluded from this competition is they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.
A sub-contract clause has been included in this contract. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2363
Community benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/
A summary of the expected community benefits has been provided as follows:
Tenderers must commit to realising a minimum of 100 community benefit points from the community benefits menu provided in the tender documents. The community benefits offering will be evaluated as part of the stage 2 quality evaluation.
(SC Ref:836463)
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Scottish Courts
Edinburgh
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
17/07/2026