Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Business Energy and Industrial Strategy
1 Victoria Street
London
SW1H0ET
UK
Person cyswllt: Paul Donovan
E-bost: Paul.Donovan@beis.gov.uk
NUTS: UKI32
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.gov.uk/government/organisations/department-for-business-energy-and-industrial-strategy
Cyfeiriad proffil y prynwr: https://www.gov.uk/government/organisations/department-for-business-energy-and-industrial-strategy
I.4) Y math o awdurdod contractio
Gweinyddiaeth neu unrhyw awdurdod cenedlaethol neu ffederal arall, gan gynnwys eu his-adrannau rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Nuclear Power Generation Costs
Cyfeirnod: 5655/01/2022
II.1.2) Prif god CPV
71314300
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
BEIS is looking to update nuclear generation cost and technical assumptions to more accurate figures, reflecting the changes in the nuclear policy, market, and technology spaces. Current assumptions cover only large-scale nuclear power, but these must now include a wider range of nuclear technologies, namely SMRs (small modular reactors) and AMRs (advanced modular reactors).
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 87 860.58 GBP
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
These outputs will support wider departmental modelling of the GB electricity generation system and net zero electricity generation pathways to 2050, which is key to understanding potential electricity generation mixes required to ensure a low-cost, stable, and net zero future. These costs are anticipated to be published in the next Electricity Generation Costs publication, and should be aggregated/summarised so as not to be inaccessible through commercial confidentiality or otherwise, in a similar manner to previous Generation Costs reports.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Relevant Experience & Expertise
/ Pwysoliad: 20
Maes prawf ansawdd: Methodology & Approach
/ Pwysoliad: 30
Maes prawf ansawdd: Project Management
/ Pwysoliad: 15
Maes prawf ansawdd: Quality of Resource
/ Pwysoliad: 15
Price
/ Pwysoliad:
20
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
Multiple options in the power sector need to be explored in order to determine what electricity generation mix will be needed to reach Net Zero 2050. As part of this, nuclear power will have a part to play in supplying reliable baseload power to complement intermittent renewables.
In-house modelling in BEIS is crucial to understanding the future GB electricity generation mix and we need up to date information for accurate and robust modelling. Therefore, BEIS is now looking to update nuclear generation cost and technical assumptions to more accurate figures, reflecting the changes in the nuclear policy, market, and technology spaces. Current assumptions cover only large-scale nuclear power, but these must now include a wider range of nuclear technologies, namely SMRs (small modular reactors) and AMRs (advanced modular reactors). The project will build on and expand previous work commissioned by BEIS on generation costs (including nuclear) , and SMRs . See Annex D for further key sources of evidence and relevant publications
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Dyfarnu contract heb gyhoeddi galwad am gystadleuaeth yng Nghyfnodolyn Swyddogol yr Undeb Ewropeaidd ymlaen llaw
Cyfiawnhau'r weithdrefn ddyfarnu a ddewiswyd:
Mae’r caffaeliad y tu allan i gwmpas cymhwysiad y gyfarwyddeb
Esboniad
This was a further competition via the Crown Commercial Services Framework RM3824 Heat Networks and Electricity Generation Assets Framework.
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
Section V: Dyfarnu contract
Rhif Contract: 5655/01/2022
Teitl: Nuclear Power Generation Costs
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
03/05/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 1
Nifer y tendrau a ddaeth i law gan BBaChau: 1
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 1
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Frazer Nash Consultancy Limited
Stonebridge House, Dorking Business Park, Dorking
Surrey
RH4 1HJ
UK
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 87 860.58 GBP
Cyfanswm gwerth y contract/lot: 87 860.58 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
These outputs will support wider departmental modelling of the GB electricity generation system and net zero electricity generation pathways to 2050, which is key to understanding potential electricity generation mixes required to ensure a low-cost, stable, and net zero future. These costs are anticipated to be published in the next Electricity Generation Costs publication, and should be aggregated/summarised so as not to be inaccessible through commercial confidentiality or otherwise, in a similar manner to previous Generation Costs reports .
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Department of Business, Energy & Industrial Strategy
1 Victoria Street
London
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
31/05/2022