Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
National Nuclear Laboratory
GB927282900
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK
Person cyswllt: Craig Greenough
Ffôn: +44 1772965112
E-bost: Craig.greenough@uknnl.com
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.nnl.co.uk/
Cyfeiriad proffil y prynwr: https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/124934
I.2) Caffael ar y cyd
Caiff y contract ei ddyfarnu gan gorff prynu canolog
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=68955&B=NNL
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=68955&B=NNL
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Arall: Nuclear
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Workington Laboratory Refurbishment
Cyfeirnod: NNLC416
II.1.2) Prif god CPV
45214610
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability..
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 700 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
39180000
39181000
51430000
71900000
79421200
79933000
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability: -
• 4 off. Fume hoods
• Double Dissolver
• Precipitation Vessel
• Filtration Boat
• Furnace
• Evaporator
• Waste Liquor collection vessel
• Sink
• Foul waste drainage system
• Deionisation machine
• Room extraction ventilation system
• Fume hood ventilation
• Bottle fed argon and nitrogen supply
• Hydrogen monitor
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 700 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Dechrau:
02/12/2024
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
26/06/2023
Amser lleol: 17:00
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.7) Amodau ar gyfer agor tendrau
Dyddiad:
26/06/2023
Amser lleol: 17:00
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Ydy
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
National Nuclear Laboratory Limited
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK
E-bost: nnl.procurement@uknnl.com
Cyfeiriad(au) rhyngrwyd
URL: https://www.nnl.co.uk
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
The Royal Courts of Justice
The Strand
London
WC2A 2LL
UK
VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu
National Nuclear Laboratory
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK
E-bost: nnl.procurement@uknnl.com
Cyfeiriad(au) rhyngrwyd
URL: https://www.nnl.co.uk
VI.5) Dyddiad anfon yr hysbysiad hwn
31/05/2023