Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
BANK OF ENGLAND
Threadneedle Street
LONDON
EC2R8AH
UK
E-bost: fm.contracts@bankofengland.co.uk
NUTS: UKI31
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.bankofengland.co.uk
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://supplierlive.proactisp2p.com/account/login
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Materion economaidd ac ariannol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Threadneedle Street Air Handling Units Replacement Project
Cyfeirnod: PRJ/1000174
II.1.2) Prif god CPV
45331210
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
This project will replace the primary and secondary air handling units with new. This will include all associated plant and equipment within the confines of the air handling unit plantrooms. Such as, chilled water pipework, low temperature hot water pipework, building management main control panels and field devices, plantroom ductwork distribution systems, ductwork ancillaries such as attenuators, fire dampers, volume control dampers, and all associated builders' work in connection.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 8 000 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
42520000
II.2.3) Man cyflawni
Cod NUTS:
UKI
II.2.4) Disgrifiad o’r caffaeliad
The existing ventilation system in Threadneedle Street comprises of two primary main supply air handling units and twelve secondary air handling units, which supply tempered air to the occupied office areas via a series of services tunnels and builders' work shafts. This plant and equipment was installed in 1987 and has now reached the end of its economic lifecycle and requires replacement.
This project will replace the primary and secondary air handling units with new. This will include all associated plant and equipment within the confines of the air handling unit plantrooms such as, chilled water pipework, low temperature hot water pipework, building management main control panels and field devices, plantroom ductwork distribution systems, ductwork ancillaries such as attenuators, fire dampers, volume control dampers, and all associated builders' work in connection.
II.2.14) Gwybodaeth ychwanegol
Further documentation on the project is available on the Bank of England procurement portal. The Bank is also holding two Supplier Engagement Site Visits, on 27th June and 29th June. This will be restricted to only two attendees per supplier. The site visit will commence with an initial presentation and will go on to a tour of the premises needing work.
For details of how to access the project documentation and to register for one of the Supplier Engagement Site Visits, see Section Six of this notice.
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
03/07/2023
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
Interested organisations should register interest in this opportunity via the Bank's e-tendering portal, Proactis, which can be accessed via the following website:
https://supplierlive.proactisp2p.com/Account/Login
To access the project search for PRJ/1000174 - TS Air Handling Units Replacement Project and add your company to the tender. Alternatively if you cannot find the advert on Proactis Plaza send an e-mail to: FM.contracts@bankofengland.co.uk to be added to the event. Please title your e-mail TS Air Handling Units Replacement Project Tender and include the full Company name and Organisation ID from Proactis, to allow us to attach you to the tender.
Details of how to register for one of the Early Engagement Site Visits are provided on Proactis.
VI.5) Dyddiad anfon yr hysbysiad hwn
15/06/2023