Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Portsmouth City Council
Civic Offices,Guildhall Square
PORTSMOUTH
PO12AL
UK
Person cyswllt: Procurement Service
Ffôn: +44 2392688235
E-bost: procurement@portsmouthcc.gov.uk
NUTS: UKJ31
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.portsmouth.gov.uk/ext/business/business.aspx
Cyfeiriad proffil y prynwr: https://www.portsmouth.gov.uk/ext/business/business.aspx
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Coastal Engineering Minor Works Framework Agreement: Southern Coastal Group and SCOPAC (Southern England)
II.1.2) Prif god CPV
45240000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Portsmouth City Council ('the council') on behalf of the Southern Coastal Group (SCG) and SCOPAC (the Regional Coastal Group for central southern England), established a multi-contractor Coastal Engineering Minor Works Framework Agreement.
The framework commenced on 27th July 2022 and will run for a period of four years.
The framework comprises of 2 lots. Lot 1 is concerned with the provision of General Coastal Civil Engineering Works and Lot 2 is concerned with the provision of Specialist Beach Management Works.
Each framework lot is made up of 4 contractors.
The framework will be available to all current and future SCG and SCOPAC members who are classified as Contacting Authorities. In addition, the framework will also be accessible to all contracting authorities situated within the counties of Hampshire, Dorset, West Sussex, East Sussex, Isle of Wight, Kent, Somerset and Wiltshire.
The value of the framework across both lots is estimated to be in the region of £6million over four years. Based upon previous demand information it is likely that 70% of the estimated value will be procured via Lot 1 and 30% via Lot 2, however this may change significantly year on year due to the dynamic nature of the coastal environment. This is based on the known requirements of SCG and SCOPAC members. In the event of further schemes or take up by other authorities across Southern England, the total value of the framework could increase to £9million.
The average value of works called off via the framework for both Lots by SCG and SCOPAC is likely to range from £20k to £150k. However, there is also likely to be commissions below £20k and on occasion in excess of £500k, although no upper or lower value constraints shall apply.
The framework agreement has been let using the NEC4 Framework Agreement terms.
Contracting authorities have a variety of call-off mechanisms and
contracting options available for use which include for both mini-competition and direct award options.
Call-off contracts may be let using either the NEC4 PSC or TSC in either the long or short form and with the choice of all options as proportionate and relevant to the services which are being commissioned. Low value, non-complex works may also be awarded via the standard purchase order terms of the particular contracting authority commissioning the works.
The framework was established using the Restricted Procedure as set out within the Public Contracts Regulations (2015).
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Ydy
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 9 000 000.00 GBP
II.2) Disgrifiad
Rhif y Lot 1
II.2.1) Teitl
Lot 1 - General Coastal Civil Engineering Works
II.2.2) Cod(au) CPV ychwanegol
45241000
45242110
45243000
45244000
45246000
45247000
45252124
II.2.3) Man cyflawni
Cod NUTS:
UKJ21
UKJ22
UKJ27
UKJ28
UKJ3
UKJ4
UKK15
UKK2
Prif safle neu fan cyflawni:
The framework will be available to all SCG and SCOPAC members, including any future iterations of these groups which may include for changes in existing member status and / or addition of new members over the term of the framework agreement.
The current list of SCG & SCOPAC local authority and Harbour Authority members includes:
• Bournemouth, Christchurch and Poole Council
• Chichester District Council
• Dorset Council
• Eastleigh Borough Council
• Fareham Borough Council
• Gosport Borough Council
• Hampshire County Council
• Havant Borough Council
• Isle of Wight Council
• New Forest District Council
• Portsmouth City Council
• Southampton City Council
• Chichester Harbour Conservancy
• Langstone Harbour Board
• Poole Harbour Commissioners
• Yarmouth Harbour Commissioners
All of the above members support the establishment of the framework agreement and have expressed interest in using the agreement once operational. However, no guarantees on usage and demand can be made.
II.2.4) Disgrifiad o’r caffaeliad
All contractors have the ability to provide comprehensive coastal engineering services as required. A non-exhaustive list of the core services for lot 1 that may be sourced via the framework agreement are stated below:
Core - Lot 1 (General Coastal Civil Engineering Works)
• Drainage infrastructure.
• Earth and flood embankments
• Flood gates, boards and demountable defences.
• Heritage works
• H&S issues and emergency works response.
• Incidental beach management works.
• Marine and harbour works
• Piling works
• Precast and insitu concrete works
• Rock works
• Slipways, promenades, steps and access ramps.
• Timber groyne & revetment works
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Total of project scores
/ Pwysoliad: 30
Maes prawf ansawdd: Social Value
/ Pwysoliad: 5
Price
/ Pwysoliad:
65
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Rhif y Lot 2
II.2.1) Teitl
Lot 2 - Specialist Beach Management Works
II.2.2) Cod(au) CPV ychwanegol
45112320
45112360
45112400
45112500
45241000
45243000
45244000
45246000
45247000
II.2.3) Man cyflawni
Cod NUTS:
UKJ21
UKJ22
UKJ27
UKJ28
UKJ3
UKJ4
UKK15
UKK2
Prif safle neu fan cyflawni:
The framework will be available to all SCG and SCOPAC members, including any future iterations of these groups which may include for changes in existing member status and / or addition of new members over the term of the framework agreement.
The current list of SCG & SCOPAC local authority and Harbour Authority members includes:
• Bournemouth, Christchurch and Poole Council
• Chichester District Council
• Dorset Council
• Eastleigh Borough Council
• Fareham Borough Council
• Gosport Borough Council
• Hampshire County Council
• Havant Borough Council
• Isle of Wight Council
• New Forest District Council
• Portsmouth City Council
• Southampton City Council
• Chichester Harbour Conservancy
• Langstone Harbour Board
• Poole Harbour Commissioners
• Yarmouth Harbour Commissioners
All of the above members support the establishment of the framework agreement and have expressed interest in using the agreement once operational. However, no guarantees on usage and demand can be made.
II.2.4) Disgrifiad o’r caffaeliad
All contractors have the ability to provide comprehensive coastal engineering services as required for each lot. A non-exhaustive list of the core services for lot 2 that may be sourced via the framework agreement are stated below:
Core - Lot 2 (Specialist Beach Management Works)
• Beach management works.
• Excavation, haulage, deposition, profiling and screening of beach material.
• Ground works associated with flood and coastal risk management.
• H&S issues and emergency works response.
• Incidental general coastal civil engineering works.
• Land based importing of suitable beach material from external sources.
• Slipways, promenades, steps and access ramps.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Total of project scores
/ Pwysoliad: 35
Maes prawf ansawdd: Social Value
/ Pwysoliad: 5
Price
/ Pwysoliad:
65
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.3) Gwybodaeth am gytundeb fframwaith neu system brynu ddynamig
Mae’r caffaeliad yn golygu y caiff cytundeb fframwaith ei sefydlu
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2021/S 000-025521
Section V: Dyfarnu contract
Rhif y Lot: 1
Teitl: Lot 1 - General Coastal Civil Engineering Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
15/04/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Suttle Projects ltd
6734695
Swanage
UK
NUTS: UKK2
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 6 300 000.00 GBP
Cyfanswm gwerth y contract/lot: 6 300 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 1
Teitl: Lot 1 - General Coastal Civil Engineering Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
15/04/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
JT Mackley & Co Ltd
258810
Small Dole
UK
NUTS: UKJ2
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 6 300 000.00 GBP
Cyfanswm gwerth y contract/lot: 6 300 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 1
Teitl: Lot 1 - General Coastal Civil Engineering Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
15/04/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Avon Construction Ltd
5416775
Ringwood
UK
NUTS: UKJ3
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 6 300 000.00 GBP
Cyfanswm gwerth y contract/lot: 6 300 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 1
Teitl: Lot 1 - General Coastal Civil Engineering Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
15/04/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Earlcoate Construction & Plant Hire Ltd
4196599
Fordingbridge
UK
NUTS: UKJ3
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 6 300 000.00 GBP
Cyfanswm gwerth y contract/lot: 6 300 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 2
Teitl: Lot 2 - Specialist Beach Management Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Ovenden Earthmoving Co Ltd
01919669
Canterbury
UK
NUTS: UKJ4
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 2 700 000.00 GBP
Cyfanswm gwerth y contract/lot: 2 700 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 2
Teitl: Lot 2 - Specialist Beach Management Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
JT Mackley & Co Ltd
258810
Small Dole
UK
NUTS: UKJ2
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 2 700 000.00 GBP
Cyfanswm gwerth y contract/lot: 2 700 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 2
Teitl: Lot 2 - Specialist Beach Management Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Les Searle Plant Hire and Sales Ltd
1442513
Horsham
UK
NUTS: UKJ3
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 2 700 000.00 GBP
Cyfanswm gwerth y contract/lot: 2 700 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 2
Teitl: Lot 2 - Specialist Beach Management Works
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Earlcoate Construction & Plant Hire Ltd
4196599
Fordingbridge
UK
NUTS: UKJ3
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 2 700 000.00 GBP
Cyfanswm gwerth y contract/lot: 2 700 000.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court of Justice
The Strand
London
WCA 2LL
UK
Ffôn: +44 2079476000
VI.5) Dyddiad anfon yr hysbysiad hwn
21/06/2023