Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Guildford Borough Council
Guildford Borough Council Guildford Borough Council Millmead House, Millmead Guildford Guildford
GU2 4BB
UK
Person cyswllt: Gavin Seabourne-Pugh
E-bost: gavin.seabourne-pugh@guildford.gov.uk
NUTS: UKJ25
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.guildford.gov.uk
I.4) Y math o awdurdod contractio
Asiantaeth/swyddfa ranbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
GBC - Weyside Urban Village - Off Site Highways
Cyfeirnod: GBC - 036573
II.1.2) Prif god CPV
45233100
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Weyside Urban Village is an exciting regeneration project that will bring new homes, industrial uses, and community facilities to Guildford. By building on brownfield land (previously used land) the site protects the Green Belt surrounding the borough.The delivery of approximately 1,500 high-quality homes will play a crucial role in helping to meet Guildford’s housing need. The scheme provides new state of the art infrastructure including a new sewage treatment plant and a new council depot, to be relocated from their existing locations to near locations within the Slyfield Industrial Estate.The off-site highways works programme is principally required to mitigate the traffic impacts associated with the Weyside Urban Village development, as well as improve the surrounding pedestrian, cyclist and bus networks to encourage and enable greater sustainable travel.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 6 140 081.83 GBP
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45233000
II.2.3) Man cyflawni
Cod NUTS:
UKJ25
Prif safle neu fan cyflawni:
II.2.4) Disgrifiad o’r caffaeliad
Weyside Urban Village is an exciting regeneration project that will bring new homes, industrial uses, and community facilities to Guildford. By building on brownfield land (previously used land) the site protects the Green Belt surrounding the borough.The delivery of approximately 1,500 high-quality homes will play a crucial role in helping to meet Guildford’s housing need. The scheme provides new state of the art infrastructure including a new sewage treatment plant and a new council depot, to be relocated from their existing locations to near locations within the Slyfield Industrial Estate.As part of this development a new local centre is being created which include:• Up to 1800 sqm of retail space (including a convenience store).• Healthcare and community facilities• A nursery• Flexible employment uses, such as offices and workshopIn addition, new industrial uses are being developed in an extension to the Slyfield Industrial Estate.Outline planning consent for the masterplan was granted in March 2022, under the application reference 20/P/02155.The off-site highways works programme is principally required to mitigate the traffic impacts associated with the Weyside Urban Village development, as well as improve the surrounding pedestrian, cyclist and bus networks to encourage and enable greater sustainable travel. This is a requirement to enable to delivery of the site, as per the National Planning Policy Framework and the granted Outline Planning Permission.• A summary of the reasons for these works are below:• Highway improvements on the A320 to maintain traffic capacities.• Enabling implementation of the County’s Sustainable Movement Corridor (SMC) 5.• Introduction of bus priority measures designed to enhance bus reliability / performance and make this mode a more attractive option.• Rationalisation of parking and greening up (as much as possible) of the access corridors on Woodlands Road / Slyfield Green and Bellfields Road.• A network of cycle and footway facilities to encourage greater active travel.
II.2.5) Meini prawf dyfarnu
Price
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.2.14) Gwybodaeth ychwanegol
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gystadleuol gyda negodi
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-020679
Section V: Dyfarnu contract
Rhif Contract: 88702345-1
Teitl: WUV Offsite Highways – Off Site Highways Contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
14/05/2024
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 4
Nifer y tendrau a ddaeth i law gan BBaChau: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau yr UE: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 0
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 4
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Winvic Construction Limited
Northampton
UK
NUTS: UKF25
BBaCh yw’r contractwr:
Na
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 6 400 000.00 GBP
Cyfanswm gwerth y contract/lot: 6 140 081.83 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Royal Courts of Justice
Strand
London
WC2A 2LL
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
VI.5) Dyddiad anfon yr hysbysiad hwn
03/06/2024