Hysbysiad gwybodaeth ymlaen llaw
Nod yr hysbysiad hwn yw cwtogi’r terfynau amser i dendrau ddod i law
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
National Physical Laboratory
Hampton Road
Teddington
TW11 0LW
UK
E-bost: nina.heath@npl.co.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.npl.co.uk
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://lupc.bravosolution.co.uk/
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Arall: Research
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
PIN: Table-top QHR standard (only fridge and graphene sample)
II.1.2) Prif god CPV
38000000
II.1.3) Y math o gontract
Cyflenwadau
II.1.4) Disgrifiad byr
This is a Prior Information Notice for Table-top QHR standard (only fridge and graphene sample).
The National Physical Laboratory requires a Table-top QHR standard (only fridge and graphene sample).
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 200 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UK
Prif safle neu fan cyflawni:
Teddington, UK
II.2.4) Disgrifiad o’r caffaeliad
This is a Prior Information Notice for Table-top QHR standard (only fridge and graphene sample).
The National Physical Laboratory requires a Table-top QHR standard (only fridge and graphene sample).
A refrigerator for the operation of a Cryogenic Current Comparator (CCC)/Squid system at 4 K. The system should provide an experimental space of minimum size 15 cm diameter by 20 cm height, with a temperature stability of ±5 mK or better, and a supplied cooling power at base temperature of at least 0.5 W. The experimental space can be either in vacuum or immersed in self-condensed liquid helium, but the system must require no liquid helium to be supplied for either cool-down or regular running. The system should be designed for continuous operation for periods of at least 6 months.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 200 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 12
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
09/09/2024
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
NPL Management
Hampton Road
Teddington
TW11 0LW
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
21/06/2024