Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Ddyfarnu Contract

Landscaping – tree planting

  • Cyhoeddwyd gyntaf: 03 Mehefin 2025
  • Wedi'i addasu ddiwethaf: 03 Mehefin 2025
  • Fersiwn: N/A
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Eicon Gwybodaeth

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-146914
Cyhoeddwyd gan:
Social Farms and Gardens
ID Awudurdod:
AA78256
Dyddiad cyhoeddi:
03 Mehefin 2025
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

Background Information The Future Farms partnership is building three rural enterprise dwellings on LA-farm estate on the edge of the village of Sarn, Newtown. Three new horticulture enterprises will be operating from the site from early 2025. The plan for the 38acre site includes a communal area of 5.6acres which is set aside for biodiversity improvements. As part of the process to attain planning permission for the dwellings, packing shed and associated services, we submitted a detailed landscaping plan that we are required to work towards delivering. We have secured funding via Powys County Councils Local Places for Nature Fund to achieve the landscaping elements of the site. This includes the sourcing, purchase and installation of: • Local provenance hedging, correctly demarcating the smaller growing plots, conserving/restoring existing hedging/shelterbelts and creating some river margin riparian buffer zones. • Specific and innovative composting equipment (this is for humanure in the main). • Local provenance fruit and nut trees, trees and bushes to establish small scale food forest farming. • Local provenance wildflower meadow turf for the edges / around trees. • Benches / shelters / fences at entrance / viewpoints / areas for local residents and visitors to enjoy the site • Tool Storage unit, to include secure base & fixings. • Pond & swale creation with some rainwater harvesting goods to enable water to move and be used across the site. • Some basic hand tools & equipment. We hope to work with local residents, including the new growers, and representatives from the Future Farm partnership and local Wildlife Trust(s) to carry out some of this activity. Description of Required Services We are looking for a landscaping contractor(s) to deliver aspects of the work that require specialist skills and equipment, but also one that will work with the partnership and members of the community for things like the habitat creation elements and tree planting. Bidders should familiarise themselves with the attached documents: 1. Landscaping plan including planting schedule & management plan, approved as part of the planning permission and the biodiversity plan. 2. Drainage Strategy for the site. 3. Overall site master plan / drawing. We are committed to a “regenerate nature” principle this includes a compost and no-waste focus.  Local provenance is vital for both fruit and veg and hedge/tree/flower planting. The site is ‘Land to the North of Wern Lane, Sarn’, centred at grid coordinates X: 321420, Y: 290910, with sides of the land close to the A489 between Kerry and Churchstoke and Wern Lane. We have split the overall contract into three Lots, where those wishing to tender can tender for each or all of the Lots. We will require a detailed breakdown of the work that can be delivered within each of the Lots and a clear price for each. We reserve the right to remove some lines of works from the contract(s) awarded if we can’t afford to include them all, or can provide replacements for them via other means. Lot 1 – Groundworks Pond creation (we wish to create a large water harvesting pond that can serve as both a wildlife habit and a water irrigation source, we hope due to the soil make up this would work without the need to be lined, so quotes should be for ground works in the main for this). A number of swales are designed in to help retain surface water run-off on site. Small runs of stock fencing (50 linear metres) and 4 No. gate posts to provide a barrier from the remaining hedges, back to a gateway on the site from the highways crossover points. Lot 2 – Plantings Sourcing and assistance to plant, to include appropriate tree / sapling tree protection: • An area of coppice woodland • A fruit (Minium 25 trees) and nut (20 trees) orchard, including top fruit and fruit bushes (20). • A rivers edge riparian tree planted buffer zone (using a mix of native tree saplings suitable for damp ground i.e. alder,

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CENEDLAETHOL

SERVICES

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Social Farms and Gardens

Top Floor, 9 Broad Street,

Newtown

SY16 2LU

UK

Alison Sheffield

+44 2920225942


https://www.farmgarden.org.uk

2 Manylion y Contract

2.1

Teitl

Landscaping – tree planting

2.2

Disgrifiad o'r contract

Background Information

The Future Farms partnership is building three rural enterprise dwellings on LA-farm estate on the edge of the village of Sarn, Newtown. Three new horticulture enterprises will be operating from the site from early 2025. The plan for the 38acre site includes a communal area of 5.6acres which is set aside for biodiversity improvements.

As part of the process to attain planning permission for the dwellings, packing shed and associated services, we submitted a detailed landscaping plan that we are required to work towards delivering.

We have secured funding via Powys County Councils Local Places for Nature Fund to achieve the landscaping elements of the site.

This includes the sourcing, purchase and installation of:

• Local provenance hedging, correctly demarcating the smaller growing plots, conserving/restoring existing hedging/shelterbelts and creating some river margin riparian buffer zones.

• Specific and innovative composting equipment (this is for humanure in the main).

• Local provenance fruit and nut trees, trees and bushes to establish small scale food forest farming.

• Local provenance wildflower meadow turf for the edges / around trees.

• Benches / shelters / fences at entrance / viewpoints / areas for local residents and visitors to enjoy the site

• Tool Storage unit, to include secure base & fixings.

• Pond & swale creation with some rainwater harvesting goods to enable water to move and be used across the site.

• Some basic hand tools & equipment.

We hope to work with local residents, including the new growers, and representatives from the Future Farm partnership and local Wildlife Trust(s) to carry out some of this activity.

Description of Required Services

We are looking for a landscaping contractor(s) to deliver aspects of the work that require specialist skills and equipment, but also one that will work with the partnership and members of the community for things like the habitat creation elements and tree planting.

Bidders should familiarise themselves with the attached documents:

1. Landscaping plan including planting schedule & management plan, approved as part of the planning permission and the biodiversity plan.

2. Drainage Strategy for the site.

3. Overall site master plan / drawing.

We are committed to a “regenerate nature” principle this includes a compost and no-waste focus.  Local provenance is vital for both fruit and veg and hedge/tree/flower planting.

The site is ‘Land to the North of Wern Lane, Sarn’, centred at grid coordinates X: 321420, Y: 290910, with sides of the land close to the A489 between Kerry and Churchstoke and Wern Lane.

We have split the overall contract into three Lots, where those wishing to tender can tender for each or all of the Lots. We will require a detailed breakdown of the work that can be delivered within each of the Lots and a clear price for each. We reserve the right to remove some lines of works from the contract(s) awarded if we can’t afford to include them all, or can provide replacements for them via other means.

Lot 1 – Groundworks

Pond creation (we wish to create a large water harvesting pond that can serve as both a wildlife habit and a water irrigation source, we hope due to the soil make up this would work without the need to be lined, so quotes should be for ground works in the main for this).

A number of swales are designed in to help retain surface water run-off on site.

Small runs of stock fencing (50 linear metres) and 4 No. gate posts to provide a barrier from the remaining hedges, back to a gateway on the site from the highways crossover points.

Lot 2 – Plantings

Sourcing and assistance to plant, to include appropriate tree / sapling tree protection:

• An area of coppice woodland

• A fruit (Minium 25 trees) and nut (20 trees) orchard, including top fruit and fruit bushes (20).

• A rivers edge riparian tree planted buffer zone (using a mix of native tree saplings suitable for damp ground i.e. alder, willow and hazel)

• Landscaping standard trees as detailed in the landscaping plan & schedule

• Wildflower turf, matting or seeds to provide pollination opportunities across the communal area.

• Small distances of hedgerow re-instatement for the highways crossovers.

Lot 3 – Structures and associated equipment

• Composting facilities for humanure – (4 wheelie bins) and a screening / shelter for them.

• Benches, (up to 6 No) these can be a mix of purchased and made, however they need to be long lasting and robust in construction.

• Building / provision of shelter for 3 of the above, i.e. could be trellis and plantings or a more solid structure

• Small equipment storage ‘container’ to be weather-proof and secure, including any ground fixings or base required.

• Rainwater harvesting / irrigation pump (supply of one submersible pump such as https://www.waterpump.co.uk/extrema-400-11-pro-submersible-dirty-water-pump ) capable of high flow rate, and able to deal with some particles.

Criteria we will be assessing against include:

- Experience of delivering similar scale landscaping projects.

- Capacity to carry out the majority of the works before end Feb 2025, and completion by end of March 2025.

- Willingness to work alongside other contractors on site undertaking the build of the dwellings, packing shed and associated groundworks.

- Relevant licences & insurance cover.

- Preference will be given to local supply chains and environmental sustainability of products.

- Understanding of local growing conditions and sourcing suitable trees to match the conditions.

2.3

Cod a Dosbarthiad yr Hysbysiad

45112700 Landscaping work
45112710 Landscaping work for green areas
1024 Powys

2.4

Amcangyfrif o Gyfanswm Gwerth

12765 GBP

3 Gweithdrefn

3.1

Math o Weithdrefn

Un cam

4 Dyfarnu Contract

4.1

Cynigwyr Llwyddiannus

4.1.1

Enw a Chyfeiriad y cyflenwr, contractwr neu ddarparwr gwasanaeth llwyddiannus





Ash & Roots Ltd

2 Tyn Fawnog, Dinorwic,

Caernarfon

LL553EL

AF




5 Gwybodaeth Arall

5.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

5.2

Dyddiad Dyfarnu'r Contract

  23 - 01 - 2025

5.3

Nifer y tendrau a dderbyniwyd

2

5.4

Gwybodaeth Arall

Final contract awarded for Lot 2 only due to budgetary constraints.

(WA Ref:151792)

5.5

Dogfennaeth Ychwanegol

Dd/g

5.6

Dyddiad cyhoeddi'r hysbysiad hwn:

  03 - 06 - 2025

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45112700 Gwaith tirlunio Gwaith cloddio a symud pridd
45112710 Gwaith tirlunio ar gyfer mannau gwyrdd Gwaith cloddio a symud pridd

Lleoliadau Dosbarthu

ID Disgrifiad
1024 Powys

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Teulu dogfennau

Manylion hysbysiad
Dyddiad cyhoeddi:
19 Rhagfyr 2024
Dyddiad Cau:
20 Ionawr 2025 00:00
Math o hysbysiad:
Hysbysiad o Gontract
Enw Awdurdod:
Social Farms and Gardens
Dyddiad cyhoeddi:
03 Mehefin 2025
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Enw Awdurdod:
Social Farms and Gardens

Ynglŷn â'r prynwr

Prif gyswllt:
N/a
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.