Dyfarnu Contract

B978 (2022) Building Contractor Craigavon Office

  • Cyhoeddwyd gyntaf: 10 Mehefin 2025
  • Wedi'i addasu ddiwethaf: 10 Mehefin 2025
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-02edc7
Cyhoeddwyd gan:
Northern Ireland Electricity Networks
ID Awudurdod:
AA78184
Dyddiad cyhoeddi:
10 Mehefin 2025
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

• The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works

• The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated – NIE Networks will seek alternative car parking arrangements for some of its staff cars

Testun llawn y rhybydd

Hysbysiad dyfarnu contract – cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Northern Ireland Electricity Networks

120 Malone Road,

Belfast,

BT9 5HT

UK

E-bost: Anna.McWhirter@nienetworks.co.uk

NUTS: UKN

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.nienetworks.co.uk

I.6) Prif weithgaredd

Trydan

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

B978 (2022) Building Contractor Craigavon Office

Cyfeirnod: B978 (2022)

II.1.2) Prif god CPV

45210000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

• The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works

• The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated – NIE Networks will seek alternative car parking arrangements for some of its staff cars

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Gwerth heb gynnwys TAW: 11 000 000.00 GBP

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

45200000

45210000

45213150

45213220

45213221

45213250

45213260

45220000

II.2.3) Man cyflawni

Cod NUTS:

UKN


Prif safle neu fan cyflawni:

Craigavon, Northern Ireland

II.2.4) Disgrifiad o’r caffaeliad

NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site.

The primary works for this project will include the following:

• The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works

• The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated – NIE Networks will seek alternative car parking arrangements for some of its staff cars

• The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network

• Upon completion and occupation of the new building, the existing building is to be

demolished, and the new car parking layout and associated landscaping completed.

The secondary works will include the following:

• Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work.

• Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project.

• Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs.

• The design of any temporary works will be the main contractor’s responsibility.

• The main contractor will assume full responsibility for:

- Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor’s sole responsibility.

- Co-ordination of all deliveries associated with the works including traffic management, flag men etc.

- The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works.

- The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works.

• The main contractor must ensure that all completed works are properly protected until handover of the site.

• Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works.

• It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Quality / Pwysoliad: 30

Maen prawf cost: Commercial / Pwysoliad: 70

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Ydy

Disgrifiad o’r opsiynau:

Contract Duration is from April 2025 to October 2026

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2021/S 000-026202

Section V: Dyfarnu contract

Rhif Contract: B978 (2022)

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

14/04/2025

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 5

Nifer y tendrau a ddaeth i law gan BBaChau: 5

Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 5

Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 5

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

MSM Contracts Limited

Unit 45a Seagoe Industrial Estate

Portadown

BT63 5QE

UK

NUTS: UKN

BBaCh yw’r contractwr: Ydy

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cyfanswm gwerth y contract/lot: 11 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

Northern Ireland Electricity Networks Limited

120 Malone Road

Belfast

UK

Cyfeiriad(au) rhyngrwyd

URL: www.nienetworks.co.uk

VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu

High Court of Justice In Northern Ireland

Royal Courts of Justice, Chichester Street

Belfast

UK

VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu

High Court of Justice in Northern Ireland

Royal Courts of Justice, Chichester Street

Belfast

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

05/06/2025

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45210000 Gwaith adeiladu adeiladau Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil
45213250 Gwaith adeiladu ar gyfer adeiladau diwydiannol Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45213220 Gwaith adeiladu ar gyfer warysau Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45213150 Gwaith adeiladu blociau o swyddfeydd Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45213260 Gwaith adeiladu depos storau Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45213221 Gwaith adeiladu storfeydd warws Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45200000 Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil Gwaith adeiladu
45220000 Gwaith peirianneg a gwaith adeiladu Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
Anna.McWhirter@nienetworks.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.