Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

UK1

NRW All Wales Mountain Bike Trail and Maintenance Framework

  • Cyhoeddwyd gyntaf: 23 Mehefin 2026
  • Wedi'i addasu ddiwethaf: 23 Mehefin 2026
  • Fersiwn: 1
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-06ba93
Cyhoeddwyd gan:
Natural Resources Wales
ID Awudurdod:
AA0110
Dyddiad cyhoeddi:
23 Mehefin 2026
Dyddiad Cau:
-
Math o hysbysiad:
UK1
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Testun llawn y rhybydd

Cwmpas

Cyfeirnod caffael

NRW55737

Disgrifiad caffael

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.

Lot 1 – Mountain Bike Trail Maintenance Works

Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:

• Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.

• Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk.

• Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.

• Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure.

• Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.

• Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements.

Lot 2 – Mountain Bike Trail Design and Construction

Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:

• Detailed trail design.

• Securing all necessary permissions, approvals, consents and licences required for project delivery.

• Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.

• Testing, commissioning and certification that the completed works are fit for purpose.

• Formal handover of completed trails and associated documentation to the Client.

Prif gategori

Yn gweithio

Rhanbarthau cyflawni

  • UKL - Wales

Cyfanswm gwerth (amcangyfrif)

2000000.00 GBP Heb gynnwys TAW

2400000.00 GBP Gan gynnwys TAW

Dyddiadau contract (amcangyfrif)

04 Ionawr 2027, 00:00yb to 03 Ionawr 2031, 23:59yh

A oes fframwaith yn cael ei sefydlu?

Oes

Awdurdod contractio

Natural Resources Wales

Cofrestr adnabod:

  • GB-PPON

Cyfeiriad 1: Welsh Government Offices Cathays Park

Tref/Dinas: Cardiff

Côd post: CF10 3NQ

Gwlad: United Kingdom

Gwefan: http://naturalresourceswales.gov.uk

Rhif y Sefydliad Caffael Cyhoeddus: PBBR-3628-MPRN

Enw cyswllt: Emma L Brown

Ebost: Emma.L.Brown@cyfoethnaturiolcymru.gov.uk

Math o sefydliad: Awdurdod cyhoeddus - llywodraeth ganolog

Rheoliadau datganoledig sy'n berthnasol: Cymru

Gweithdrefn

Math o weithdrefn

Open procedure

A yw cyfanswm y gwerth uwchlaw'r trothwy?

Uwchben y trothwy

Lotiau

Wedi'i rannu'n 1 lot

Rhif lot: 1

Dosbarthiadau CPV

  • 45236290 - Gwaith atgyweirio ar ardaloedd hamdden
  • 45233160 - Llwybrau ac wynebau metel eraill

Rhanbarthau cyflawni

  • UKL - Wales

Cynaladwyedd

Busnesau bach a chanolig (BBaCh)

Dyddiad cychwyn y contract (amcangyfrif)

04 Ionawr 2027, 00:00yb

Dyddiad diwedd y contract (amcangyfrif)

03 Ionawr 2031, 23:59yh

Cyflwyno

Dyddiad cyhoeddi hysbysiad tendro (amcangyfrif)

03 Awst 2026

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45236290 Gwaith atgyweirio ar ardaloedd hamdden Gwaith ar y gwastad
45233160 Llwybrau ac wynebau metel eraill Gwasanaethau sy’n gysylltiedig ag adeiladu

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Ynglŷn â'r prynwr

Prif gyswllt:
n/a
Cyswllt gweinyddol:
n/a
Cyswllt technegol:
n/a
Cyswllt arall:
n/a

Gwybodaeth bellach

Dyddiad Manylion

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.