Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Peel Ports Investments Ltd
5433920
Maritime Centre
Liverpool
L21 1LA
UK
Person cyswllt: Linda Robinson
Ffôn: +44 7920501984
E-bost: linda.robinson@peelports.com
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.peelports.com
Cyfeiriad proffil y prynwr: https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/91299
I.6) Prif weithgaredd
Gweithgareddau sy’n gysylltiedig â phorthladdoedd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Drainage Surveys
Cyfeirnod: PPIL/0082
II.1.2) Prif god CPV
90491000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
Peel Ports has awarded a framework agreement to a single successful tenderer for the provision of services to undertake and report on an exhaustive drainage clearance, survey and condition assessment of the existing private drainage networks on the Peel Ports Group Estates.
A recent environmental audit identified a need to update business records of Peel Ports Group (PPG) drainage infrastructure.
There is an accountability to understand and define where all site drainage, whether that be PPG controlled or tenant controlled, starts and discharges and how it is conveyed (pipe network and infrastructure).
The surveys should account for all surface water, foul and combined sewerage, both gravity and pumped, including all associated drainage infrastructure.
This requirement should follow through to produce a clear drainage plan for the business entities going forward.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
44163112
71355000
II.2.3) Man cyflawni
Cod NUTS:
UK
Prif safle neu fan cyflawni:
UK
II.2.4) Disgrifiad o’r caffaeliad
Peel Ports has awarded a framework agreement to a single successful tenderer for the provision of services to undertake and report on an exhaustive drainage clearance, survey and condition assessment of the existing private drainage networks on the Peel Ports Group Estates.
A recent environmental audit identified a need to update business records of Peel Ports Group (PPG) drainage infrastructure.
There is an accountability to understand and define where all site drainage, whether that be PPG controlled or tenant controlled, starts and discharges and how it is conveyed (pipe network and infrastructure).
The surveys should account for all surface water, foul and combined sewerage, both gravity and pumped, including all associated drainage infrastructure.
This requirement should follow through to produce a clear Drainage Plan for the business entities going forward
To ensure this is achieved the following to will take place:
— initial site visit to conduct a preliminary survey on the manholes across the estate, establishing a program of works, including instructing minor civil works to free any manholes that pose an issue,
— exhaustive drainage survey,
— 2D autoCAD drawings for each site,
— conditioning report.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Key themes
/ Pwysoliad: 16
Maes prawf ansawdd: Technical
/ Pwysoliad: 44
Maen prawf cost: Commercial
/ Pwysoliad: 40
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
Initial fixed term of 3 years with options to extend up to a further 5 years.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.3) Gwybodaeth am gytundeb fframwaith neu system brynu ddynamig
Mae'r broses gaffael yn golygu sefydlu cytundeb fframwaith gydag un gweithredwr.
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2020/S 224-552085
Section V: Dyfarnu contract
Rhif Contract: 1
Teitl: Drainage Surveys
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
08/03/2021
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Metro Rod Ltd
Macclesfield
SK10 2XF
UK
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court of England and Wales
The Technology and Construction Court, 7 Rolls Buildings, Fetter Lane
London
EC4A 1NL
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
12/03/2021