Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
NORTHUMBRIAN WATER GROUP LIMITED
02366703
Via : Group Financial Controller Northumbria House,Abbey Road, Pity Me
DURHAM
DH15FJ
UK
Person cyswllt: Lily Craw
E-bost: lily.craw@nwl.co.uk
NUTS: UKC14
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.nwl.co.uk
I.6) Prif weithgaredd
Dŵr
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Tees Pipeline
Cyfeirnod: FA07-06
II.1.2) Prif god CPV
45231300
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Northumbrian Water Limited are looking to appoint a contractor to design and construct a new water pipeline. The existing water pipelines between Lartington Water Treatment Works (WTW) and Long Newton Service Reservoir (SR) require replacing due to them approaching the end of their operational life.
The Treated water conveyance system is approximately 54km long and is proposed to be built in two phases.
Phase 1 (to be built under this contract) shall transfer up to 84MLD water from the existing water treatment plant at Lartington to Whorley Service Reservoir and up to 55MLD from the Inlet of Whorley Service Reservoir to Shildon Service Reservoir. Part of the route from Whorley to Shildon is dualled with two 800mm diameter pipes to be laid in the same trench.
There is also the option to include the pumping station (circa £3m) at Shildon Service Reservoir in the scope of this Phase 1 contract and this will be subject to agreement on requirement, cost and programme being acceptable to the Employer. Phase 1 is to be in service by 31st March 2025.
Estimated Value of Phase 1 (not including Shildon Pumping Station) - £62m
In addition Subject to clause 50(1)(f) of the Utilities Contract Regulations it is the intention that NWG will direct award Phase 2 of this project to the successful tenderer for Phase 1, due to it being an extension of the original work and consist of similar work activity. Phase 2 is of similar size and is planned to start in April 2025 and is required to convey up to 84MLD from Gainford to Long Newton Service Reservoir. Phase 2 requires completion by December 2028.
The estimated value of Phase 2 is £40m.
Any award of phase 2 would be subject to the satisfactory performance of the successful tenderer for Phase 1 and the ability to agree the price and programme for Phase 2. NWL would retain sole discretion on whether Phase 2 would be directly awarded to the successful tenderer or an alternative procurement was carried out.
The Phase 1 and 2 works will require a number of strategic river, rail and road crossings, strategic connections and a number of abandonments.
NWL reserve the right to award either all or part of each phase of the proposed contracts subject to budget constraints. NWL expects any shortlisted contractors to engage in value engineering with NWL to ensure maximum value can be delivered for the available budget.
NWL are looking to appoint a contractor to work collaboratively in line with NWG's vision and values while driving innovation and efficiency throughout the lifecycle of this project.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45232100
II.2.3) Man cyflawni
Cod NUTS:
UKC1
II.2.4) Disgrifiad o’r caffaeliad
- NWL are seeking to appoint a contractor to carry out the design and construction of a cross country water pipeline as detailed in the brief description.
- The procurement process will consist of a pre-qualification process to shortlist a maximum of five applicants to receive the tender documents (fifth placed tenderer to be shortlisted subject to being within five percentage points of the fourth place applicant). The tender phase will consist of a one stage tender period consisting of a four month tender period. The award will be based on the most economically advantageous offer consisting of both quality and cost elements.
- Subject to clause 50(1)(f) of the Utilities Contract Regulations it is the intention that NWG will direct award Phase 2 of this project to the successful tenderer for Phase 1 due to it being an extension of the original work and consist of similar work activity. Any award of phase 2 would be subject to the satisfactory performance of the successful tenderer for Phase 1 and the ability to agree the price and programme for Phase 2. NWL would retain sole discretion on whether Phase 2 would be directly awarded to the successful tenderer or an alternative procurement was carried out.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
The duration of any contract will be subject to the contractor's programme, taking into account any constraints provided by the employer.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2021/S 000-017527
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
02/10/2022
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 2
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
NORTHSTONE (NI) LIMITED
NI004078
Belfast
UK
NUTS: UKN06
BBaCh yw’r contractwr:
Na
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.5) Dyddiad anfon yr hysbysiad hwn
09/03/2023