Lead Design Organisation for the Transpennine Route Upgrade Project W2BC

  • Cyhoeddwyd gyntaf: 05 Mawrth 2024
  • Wedi'i addasu ddiwethaf: 05 Mawrth 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-044517
Cyhoeddwyd gan:
Network Rail Infrastructure Ltd
ID Awudurdod:
AA73642
Dyddiad cyhoeddi:
05 Mawrth 2024
Dyddiad Cau:
11 Mawrth 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The Network Rail “Hub” Engineering Team will be responsible for design integration and assurance for the W2bc project. The team will be split into two; the Integration Hub and the Engineering Assurance Team. The Integration Hub is responsible for the integration of all Design Organisations (designs and management of these as produced in the 3D BIM environment).

The Engineering Assurance Team provides assurance to Design Organisations (DOs) designs as per the requirement outlined in NR/L2/RSE/02009.

The Integration Hub will be supported by a Lead Design Organisation (LDO), which will complete a pivotal role in ensuring that the design process is integrated and well executed, with its primary function being to ensure that the design objectives are met, design activities are coordinated within disciplines and across disciplines and that design quality is maintained throughout the project lifecycle.

Key aspects of the Lead Design Organisation role will include (but not limited to):

1. Coordination of multiple discipline design teams. This coordination ensures that various design components integrate seamlessly.

2. Providing oversight and quality control for the design process

3. Ensuring solutions are co-ordinated with programme objectives and are complementary to the wider adjoining Transpennine delivery arms.

4. Providing a key role in making design-related decisions, including resolving design conflicts, addressing design changes, and ensuring that design decisions align with project goals and requirements.

5. Captures and identifies potential design risks and develops strategies to mitigate them.

6. Responsibility for maintaining comprehensive design documentation, including design specifications, drawings, models, and other design-related documents.

7. Engagement with stakeholders

8. Interdisciplinary Collaboration to ensure that the design is multidisciplinary and holistic.

9. Continuous Improvement and seeking opportunities to enhance design efficiency, innovation, and quality.

Testun llawn y rhybydd

Hysbysiad contract - cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Network Rail Infrastructure Ltd

Waterloo General Offices

London

SE1 8SW

UK

Ffôn: +44 1908781000

E-bost: Kerry.kniveton@networkrail.co.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.networkrail.co.uk/

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

https://networkrail.bravosolution.co.uk/web/login.html


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

https://networkrail.bravosolution.co.uk/web/login.html


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


I.6) Prif weithgaredd

Gwasanaethau rheilffyrdd

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Lead Design Organisation for the Transpennine Route Upgrade Project W2BC

II.1.2) Prif god CPV

71300000

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

This is to commence a competitive tender process to procure a W2BC Lead Design Organisation Framework over the next 8 years, under an NR27 NEC4 PROFESSIONAL SERVICE SHORT FRAMEWORK CONTRACT (PSSC Framework). This will be a nil value framework for 8 years and will be utilised solely for the TRU programme. It will be a single supplier on the framework.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

63711000

71000000

71300000

71320000

II.2.3) Man cyflawni

Cod NUTS:

UK

II.2.4) Disgrifiad o’r caffaeliad

The Network Rail “Hub” Engineering Team will be responsible for design integration and assurance for the W2bc project. The team will be split into two; the Integration Hub and the Engineering Assurance Team. The Integration Hub is responsible for the integration of all Design Organisations (designs and management of these as produced in the 3D BIM environment).

The Engineering Assurance Team provides assurance to Design Organisations (DOs) designs as per the requirement outlined in NR/L2/RSE/02009.

The Integration Hub will be supported by a Lead Design Organisation (LDO), which will complete a pivotal role in ensuring that the design process is integrated and well executed, with its primary function being to ensure that the design objectives are met, design activities are coordinated within disciplines and across disciplines and that design quality is maintained throughout the project lifecycle.

Key aspects of the Lead Design Organisation role will include (but not limited to):

1. Coordination of multiple discipline design teams. This coordination ensures that various design components integrate seamlessly.

2. Providing oversight and quality control for the design process

3. Ensuring solutions are co-ordinated with programme objectives and are complementary to the wider adjoining Transpennine delivery arms.

4. Providing a key role in making design-related decisions, including resolving design conflicts, addressing design changes, and ensuring that design decisions align with project goals and requirements.

5. Captures and identifies potential design risks and develops strategies to mitigate them.

6. Responsibility for maintaining comprehensive design documentation, including design specifications, drawings, models, and other design-related documents.

7. Engagement with stakeholders

8. Interdisciplinary Collaboration to ensure that the design is multidisciplinary and holistic.

9. Continuous Improvement and seeking opportunities to enhance design efficiency, innovation, and quality.

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 96

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Ydy

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.3) Gwybodaeth am gytundeb fframwaith neu system brynu ddynamig

Mae'r broses gaffael yn golygu sefydlu cytundeb fframwaith gydag un gweithredwr.

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 11/03/2024

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

The High Court of England & Wales

7 Rolls Building, Fetter Lane

London

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

04/03/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
63711000 Gwasanaethau cymorth ar gyfer trafnidiaeth rheilffyrdd Gwasanaethau cymorth ar gyfer cludiant dros dir
71320000 Gwasanaethau dylunio peirianneg Gwasanaethau peirianneg
71300000 Gwasanaethau peirianneg Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71000000 Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio Adeiladu ac Eiddo Tiriog

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
Kerry.kniveton@networkrail.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.