Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad Gwybodaeth Ymlaen Llaw (PIN)

Bakerloo Line Upgrade (BLU) – Depot and Line-wide Infrastructure Upgrade Works

  • Cyhoeddwyd gyntaf: 09 Mawrth 2024
  • Wedi'i addasu ddiwethaf: 09 Mawrth 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-044710
Cyhoeddwyd gan:
Transport for London
ID Awudurdod:
AA24684
Dyddiad cyhoeddi:
09 Mawrth 2024
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad Gwybodaeth Ymlaen Llaw (PIN)
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. The ongoing operating costs are a concern and upgrading the rolling stock requires considerable depot and lineside infrastructure improvements to facilitate the introduction. This notice looks to address the associated infrastructure works required to improve whole life maintenance costs and service reliability for the line.

TfL intends to introduce the new rolling stock onto the Bakerloo line by, circa 2030. The introduction of new rolling stock would require a significant modification or upgrading of the line’s infrastructure to support the new fleet, by 2028.

TfL wishes to engage the market to establish appetite and seek feedback on emerging approaches or alternative/innovative delivery methodologies for the proposed depot upgrade and line wide infrastructure works that would enable the fleet introduction.

A high-level summary of assets within the scope of this works is provided below:

• DC Power

• HV Power

• LV power supply

• Stations & Property

• Platform Train Interface

• Civils & Structures

• Track

• Signalling & communications

• Depot maintenance sheds, fan roads & Stabling

The scope of this market engagement aligns with the early stage of the current programme lifecycle, acknowledging that the delivery and contracting methodologies are not yet confirmed while we look to develop the strategy using this exercise to test and mature our way of thinking. The programme will be using this market engagement to inform our strategy which currently preferences an early contractor involvement approach.

The contractors’ experience of delivery and options on building sequence could significantly influence the concept design as well as the detailed design. TfL have a drive to improve construction efficiencies to reduce cost and look at innovative techniques to reduce carbon to meet the net zero gain, with improved whole life costs.

It is assumed that the breadth of disciplines will likely need joint contractor support or specialist subcontractor involvement at the contract stage. Therefore, joint or individual supplier engagement is considered at this stage.

Respondents to this notice will receive a Market Sounding Questionnaire (MSQ) for completion and will be invited to an Industry Day around end-April to learn more about BLU Programme. If you are interested, please respond by COB Tuesday 9 April 2024.

This is a pre-procurement activity and does not imply any commitment to any future procurement process at this time. The purpose is to seek feedback on TfL’s approach, appetite from industry and information on alternative solutions that are being developed in the marketplace for similar schemes. Participation in the PIN and subsequent MSQ is not a prerequisite to, and will not prejudice, participation in any future competitive process. The information contained in this PIN or in any communication made between TfL and any supplier in connection with this should not be relied upon as constituting a contract, agreement, or representation that any contract will be offered as a result of this PIN and MSQ. If TfL decides to progress with any procurement exercise for BLU, TfL will publish a separate contract notice.

Testun llawn y rhybydd

Hysbysiad gwybodaeth ymlaen llaw

Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Transport for London

5 Endeavour Square

London

E20 1JN

UK

Person cyswllt: Georgia Paschou

Ffôn: +44 2070384000

E-bost: GeorgiaPaschou@tfl.gov.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.tfl.gov.uk

I.3) Cyfathrebu

Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


I.4) Y math o awdurdod contractio

Awdurdod rhanbarthol neu leol

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Bakerloo Line Upgrade (BLU) – Depot and Line-wide Infrastructure Upgrade Works

II.1.2) Prif god CPV

45234000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. The ongoing operating costs are a concern and upgrading the rolling stock requires considerable depot and lineside infrastructure improvements to facilitate the introduction. This notice looks to address the associated infrastructure works required to improve whole life maintenance costs and service reliability for the line.

TfL intends to introduce the new rolling stock onto the Bakerloo line by, circa 2030. The introduction of new rolling stock would require a significant modification or upgrading of the line’s infrastructure to support the new fleet, by 2028.

TfL wishes to engage the market to establish appetite and seek feedback on emerging approaches or alternative/innovative delivery methodologies for the proposed depot upgrade and line wide infrastructure works that would enable the fleet introduction.

A high-level summary of assets within the scope of this works is provided below:

• DC Power

• HV Power

• LV power supply

• Stations & Property

• Platform Train Interface

• Civils & Structures

• Track

• Signalling & communications

• Depot maintenance sheds, fan roads & Stabling

The scope of this market engagement aligns with the early stage of the current programme lifecycle, acknowledging that the delivery and contracting methodologies are not yet confirmed while we look to develop the strategy using this exercise to test and mature our way of thinking. The programme will be using this market engagement to inform our strategy which currently preferences an early contractor involvement approach.

The contractors’ experience of delivery and options on building sequence could significantly influence the concept design as well as the detailed design. TfL have a drive to improve construction efficiencies to reduce cost and look at innovative techniques to reduce carbon to meet the net zero gain, with improved whole life costs.

It is assumed that the breadth of disciplines will likely need joint contractor support or specialist subcontractor involvement at the contract stage. Therefore, joint or individual supplier engagement is considered at this stage.

Respondents to this notice will receive a Market Sounding Questionnaire (MSQ) for completion and will be invited to an Industry Day around end-April to learn more about BLU Programme. If you are interested, please respond by COB Tuesday 9 April 2024.

This is a pre-procurement activity and does not imply any commitment to any future procurement process at this time. The purpose is to seek feedback on TfL’s approach, appetite from industry and information on alternative solutions that are being developed in the marketplace for similar schemes. Participation in the PIN and subsequent MSQ is not a prerequisite to, and will not prejudice, participation in any future competitive process. The information contained in this PIN or in any communication made between TfL and any supplier in connection with this should not be relied upon as constituting a contract, agreement, or representation that any contract will be offered as a result of this PIN and MSQ. If TfL decides to progress with any procurement exercise for BLU, TfL will publish a separate contract notice.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

45213320

45234000

45234100

45234112

45234116

45234129

60200000

II.2.3) Man cyflawni

Cod NUTS:

UK


Prif safle neu fan cyflawni:

Greater London

II.2.4) Disgrifiad o’r caffaeliad

Significant modification or upgrading of the Bakerloo Line’s infrastructure to support the new rolling stock.

II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:

03/02/2025

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

Section VI: Gwybodaeth ategol

VI.5) Dyddiad anfon yr hysbysiad hwn

08/03/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45213320 Gwaith adeiladu ar gyfer adeiladau sy’n gysylltiedig â thrafnidiaeth rheilffyrdd Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45234000 Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau Gwaith adeiladu ar gyfer piblinellau, llinellau cyfathrebu a llinellau pwer, ar gyfer priffyrdd, ffyrdd, meysydd glanio a rheilffyrdd; gwaith ar y gwastad
45234112 Gwaith adeiladu depos rheilffordd Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
45234100 Gwaith adeiladu rheilffyrdd Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
45234116 Gwaith adeiladu traciau Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
45234129 Gwaith adeiladu traciau rheilffyrdd trefol Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
60200000 Gwasanaethau trafnidiaeth rheilffyrdd Gwasanaethau cludo (heblaw cludo gwastraff)

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
GeorgiaPaschou@tfl.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.