II.2.2) Cod(au) CPV ychwanegol
71220000
71530000
II.2.3) Man cyflawni
Cod NUTS:
UKI4
Prif safle neu fan cyflawni:
Guildhall Yard East
London EC2V 5AE
II.2.4) Disgrifiad o’r caffaeliad
General Matters – Architect Appointment
• Act as Lead Designer during RIBA Stage 2-4, and then acting as the client monitoring agent post RIBA stage 4 to completion.
• It is anticipated that the Works will be procured on a Single Stage Design & Build, on RIBA Stage 4 Design Information.
• Advise on any fees for any additional deliverables/ requirements not included in your proposal.
• Your fee proposal will be evaluated with a 40% Commercial weighting, 45% Technical weighting and 15% Responsible Procurement.
• Please provide a resource schedule as part of your return.
• Provision of Resource Schedules and CVs with proposal.
• Provision of Hourly Rates.
The project programme is 131 weeks starting from April 2023 and ending in October 2026.
N.B. Please include a fee provision for continued support relating to the duration of the 12-month defects period.
The estimated construction value is 17.5 million.
The City will employ an Architect, Cost Consultant and Structural Engineer directly to aid the progression to RIBA stage 4.
N.B. - BSRIA Blue Book Regulations and Standards must be incorporated in the design process.
N.B. - A copy of the City’s standard contract (D1) has been included. The contract has a hyperlink which will direct suppliers to the City’s standard terms and conditions. Please have a look at these as any clarifications need to be made before submission of a bid.
Please include in your submission, initial advice on what extra specialist support this project might need. Please indicate if you have access to such services and if you have used them before.
Please note the City’s internal Gateway process appendix A; At each stage in the project where an issue or design proposal must be approved by Committee, instruction to progress the project will not be possible until Committee approval is granted. This means that there could be a pause of up to four to eight weeks before a further instruction to progress the project can be issued. This should be considered into the fee proposal, programme and claims for further fees will not be entertained for any down time/ pause on progress or instruction relating to the Gateway governance process.
Appendix 1 – Tender Questions & Format
Appendix 2 – Programme.
The City is committed to all of its operational assets being net zero carbon emissions from its own operations by 2027 as such the proposals should be highly energy efficient with all remaining energy from on site or off-site renewable sources.
II.2.5) Meini prawf dyfarnu
Maen prawf isod:
Maes prawf ansawdd: Technical
/ Pwysoliad: 45
Maes prawf ansawdd: Commercial
/ Pwysoliad: 40
Maes prawf ansawdd: Responsible Procurement
/ Pwysoliad: 15
Price
/ Pwysoliad:
40
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 280 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 30
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na