Hysbysiad o Gontract

Guildhall Yard East - Structural Engineer

  • Cyhoeddwyd gyntaf: 29 Mawrth 2024
  • Wedi'i addasu ddiwethaf: 29 Mawrth 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-044e9a
Cyhoeddwyd gan:
City of London Corporation
ID Awudurdod:
AA20640
Dyddiad cyhoeddi:
29 Mawrth 2024
Dyddiad Cau:
29 Ebrill 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The City of London Corporation is the governing body of the City of London, the historic centre of London and home to much of the UK's financial sector - the "Square Mile". The Corporation is probably the world's oldest continuously elected democracy and predates Parliament.

The City, in collaboration with City of London Police (COLP) are undertaking a programme to modernise the police estate through a combination of new buildings and refurbishment of existing premises. CoLP currently occupy 4 floors of an existing City of London office building. A feasibility study was undertaken to determine the potential for accommodating a number of different police functions at that building and as a result it was determined that a full reconfiguration of the internal layout would likely be required in order to accommodate the requirements. Several design packages have already been progressed to RIBA 2, however elements of this design are incomplete and there is requirement for the appointed design team to review the existing information / design and provide appropriate advice / expertise as to what extent the current packages are progressed further to provide a complete RIBA 2 design before commencing the RIBA 3 (Detailed Design) stage.

All Individuals working on this project are required to have received their Non-Police Personal Vetting level 3 and Security Clearance or be in the process of obtaining the vetting from Warwickshire Police

Testun llawn y rhybydd

Hysbysiad contract

Adran I: Endid contractio

I.1) Enw a chyfeiriad

City of London Corporation

Guildhall

London

EC2P 2EJ

UK

Person cyswllt: Jemma Borland

Ffôn: +44 2076063030

E-bost: Jemma.Borland@cityoflondon.gov.uk

NUTS: UKI

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.cityoflondon.gov.uk

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

www.capitalesourcing.com


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

www.capitalesourcing.com


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


I.4) Y math o awdurdod contractio

Awdurdod rhanbarthol neu leol

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Guildhall Yard East - Structural Engineer

II.1.2) Prif god CPV

71530000

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

The City of London Corporation is the governing body of the City of London, the historic centre of London and home to much of the UK's financial sector - the "Square Mile". The Corporation is probably the world's oldest continuously elected democracy and predates Parliament.

The City, in collaboration with City of London Police (COLP) are undertaking a programme to modernise the police estate through a combination of new buildings and refurbishment of existing premises. CoLP currently occupy 4 floors of an existing City of London office building. A feasibility study was undertaken to determine the potential for accommodating a number of different police functions at that building and as a result it was determined that a full reconfiguration of the internal layout would likely be required in order to accommodate the requirements. Several design packages have already been progressed to RIBA 2, however elements of this design are incomplete and there is requirement for the appointed design team to review the existing information / design and provide appropriate advice / expertise as to what extent the current packages are progressed further to provide a complete RIBA 2 design before commencing the RIBA 3 (Detailed Design) stage.

All Individuals working on this project are required to have received their Non-Police Personal Vetting level 3 and Security Clearance or be in the process of obtaining the vetting from Warwickshire Police

II.1.5) Cyfanswm gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 110 000.00 GBP

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

71500000

71530000

II.2.3) Man cyflawni

Cod NUTS:

UKI4


Prif safle neu fan cyflawni:

Guildhall Yard East

London EC2V 5AE

II.2.4) Disgrifiad o’r caffaeliad

General Matters – Structural Engineers Appointment

Support the lead designer (Architect) through RIBA Stages 2-4 and then acting as the client monitoring agent post RIBA stage 4 to completion.

• It is anticipated that the Works will be procured on a Single Stage Design & Build, on RIBA Stage 4 Design Information.

• Advise on any fees for any additional deliverables/ requirements not included in your proposal.

• Your fee proposal will be evaluated with a 40% Commercial weighting, 45% Technical weighting and 15% Responsible Procurement.

• Please provide a resource schedule as part of your return.

• Provision of Resource Schedules and CVs with proposal.

• Provision of Hourly Rates.

The project programme is 131 weeks starting from April 2023 and ending in October 2026.

N.B. Please include a fee provision for continued support relating to the duration of the 12-month defects period.

The estimated construction value is 17.5 million.

The City will employ an Architect, Cost Consultant and Structural Engineer directly to aid the progression to RIBA stage 4.

N.B. - BSRIA Blue Book Regulations and Standards must be incorporated in the design process.

N.B. - A copy of the City’s standard contract (D1) has been included. The contract has a hyperlink which will direct suppliers to the City’s standard terms and conditions. Please have a look at these as any clarifications need to be made before submission of a bid.

Please include in your submission, initial advice on what extra specialist support this project might need. Please indicate if you have access to such services and if you have used them before.

Please note the City’s internal Gateway process appendix A; At each stage in the project where an issue or design proposal must be approved by Committee, instruction to progress the project will not be possible until Committee approval is granted. This means that there could be a pause of up to four to eight weeks before a further instruction to progress the project can be issued. This should be considered into the fee proposal, programme and claims for further fees will not be entertained for any down time/ pause on progress or instruction relating to the Gateway governance process.

Appendix 1 – Tender Questions & Format

Appendix 2 – Programme.

The City is committed to all of its operational assets being net zero carbon emissions from its own operations by 2027 as such the proposals should be highly energy efficient with all remaining energy from on site or off-site renewable sources.

II.2.5) Meini prawf dyfarnu

Maen prawf isod:

Maes prawf ansawdd: Technical / Pwysoliad: 45

Maes prawf ansawdd: Commercial / Pwysoliad: 40

Maes prawf ansawdd: Responsible Procurement / Pwysoliad: 15

Price / Pwysoliad:  40

II.2.6) Gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 110 000.00 GBP

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 30

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.1) Addasrwydd i ymgymryd â’r gweithgaredd proffesiynol, gan gynnwys gofynion mewn perthynas â chofrestru ar gofrestri proffesiynol neu gofrestri masnach

Rhestr a disgrifiad byr o’r amodau:

As stated in the procurement documents

III.1.2) Statws economaidd ac ariannol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.3) Gallu technegol a phroffesiynol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.2) Amodau sy’n gysylltiedig â’r contract

III.2.2) Amodau perfformiad contractau

As stated in the procurement documents

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 29/04/2024

Amser lleol: 12:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr

Hyd mewn misoedd: 3  (o’r dyddiad a nodwyd i dendr ddod i law)

IV.2.7) Amodau ar gyfer agor tendrau

Dyddiad: 28/03/2024

Amser lleol: 12:00

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.2) Gwybodaeth am lifau gwaith electronig

Derbynnir anfonebau electronig

Defnyddir taliadau electronig

VI.3) Gwybodaeth ychwanegol

This tendering exercise is being undertaken using the electronic tendering system ‘capitalEsourcing’ (www.capitalesourcing.com). Suppliers will need to register an interest on the system in order to participate and registration is free.

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court of England and Wales

Royal Courts of Justice, The Strand

London

WC1A 2LL

UK

VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu

High Court of England and Wales

Royal Courts of Justice, The Strand

London

WC1A 2LL

UK

VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu

Cabinet Office

70 Whitehall

London

SW1A 2AS

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

28/03/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71500000 Gwasanaethau goruchwylio safleoedd adeiladu Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71530000 Gwasanaethau ymgynghori ar adeiladu Gwasanaethau goruchwylio safleoedd adeiladu

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
Jemma.Borland@cityoflondon.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.